|
|
| Code |
BHBRBO059 |
| Water Source Type |
Borehole |
| Inspecting Agency |
Puntland_PSAWEN |
| Inspection Date |
Jan. 2, 2014 |
| District |
Bossaso |
| Settlement Name |
Biyo kulule |
| Settlement Distance (km) |
None |
| Establishing Agency |
Ras Asayr school |
| Establishing Date |
01/06/05 |
| Source Name |
Ras Asayr School |
| Latitude |
11.2579 |
| Longitude |
49.1964 |
| Sources Cluster |
None |
| Water Source Photo |
![No Photo]() |
| Users |
Urban |
| Permanent? |
Yes |
| Months Used |
None |
| Functioning? |
No |
| Non Function Reason |
None |
| No of Humans |
318 |
| No of Camels |
None |
| No of Cattle |
None |
| No of Shoats |
None |
| Irrigation Area (ha) |
None |
| Source Protected? |
None |
| Borehole Depth (m) |
45.0 |
| Wellcasing Type |
None |
| Wellcasing Size (inches) |
None |
| Borehole SWL (m) |
39.0 |
| Borehole Operating Yield (m3/hr) |
4.0 |
| Borehole Operating Hours (hrs/day) |
5.0 |
| Borehole Operating Drawn (m) |
2.0 |
| Borehole Recovery Time (hr) |
3.0 |
| Reservoir Type |
None |
| Reservoir Capacity (m3) |
20.0 |
| Pipeline Type |
None |
| Pipeline Length (m) |
250.0 |
| HouseHold Connections |
None |
| Water Point Kiosks |
None |
| Troughs |
None |
| Source Emergency? |
None |
| No of Trucks |
None |
| Truck Capacity (m3/hr) |
None |
| Pump Type |
Submersible Pump |
| Pump Model |
Grundfos 14kW |
| Pump Capacity (m3/hr) |
None |
| Pump Level (m) |
42.0 |
| Power Source |
None |
| Generator Type |
None |
| Generator Capacity (kVA/kWh) |
None |
| Solar Type |
None |
| Solar Capacity (kVA/kWh) |
None |
| Supply Condition |
None |
| Supply System Condition Notes |
None |
| Physical Water Issues |
None |
| Physical Problem Reason |
None |
| Temperature (°C) |
None |
| pH |
None |
| Electrical Conductivity (µS/cm) |
None |
| Total Dissolved Solids (mg/l) |
None |
| Water Sample Code |
No Document |
| Management Type |
Public-Private |
| WSC |
None |
| WSC Established Date |
None |
| WSC Male |
None |
| WSC Female |
None |
| Humans Charged for Water? |
None |
| Cost Of Water for Humans (USD) |
None |
| Water Charged for Animals? |
None |
| Cost Of Water for Animals (USD) |
None |
| Last Intervention Agency |
Ras Asayr School |
| Last Intervention Description |
Replacing the pipes |
| Last Intervention Date |
01/01/14 |
| Proposed Intervention Description |
Replacing pump |
| Additional Notes |
None |
| History |
History BHBRBO059 |
×