| Code | BHSNLA019 |
|---|---|
| Water Source Type | Borehole |
| Inspecting Agency | Somaliland_MoWRD |
| Inspection Date | Oct. 29, 2019 |
| District | Laasqoray |
| Settlement Name | Ceelaayo |
| Settlement Distance (km) | 5.0 |
| Establishing Agency | Emirates |
| Establishing Date | 25/05/15 |
| Source Name | CEELAYO BH |
| Latitude | 11.2238 |
| Longitude | 48.9196 |
| Sources Cluster | 0 |
| Water Source Photo | ![]() |
| Users | Urban |
| Permanent? | Yes |
| Months Used | None |
| Functioning? | Yes |
| Non Function Reason | None |
| No of Humans | None |
| No of Camels | None |
| No of Cattle | None |
| No of Shoats | None |
| Irrigation Area (ha) | None |
| Source Protected? | None |
| Borehole Depth (m) | 37.0 |
| Wellcasing Type | PVC |
| Wellcasing Size (inches) | 8.0 |
| Borehole SWL (m) | 28.0 |
| Borehole Operating Yield (m3/hr) | 10.0 |
| Borehole Operating Hours (hrs/day) | 8.0 |
| Borehole Operating Drawn (m) | 5.0 |
| Borehole Recovery Time (hr) | 0.5 |
| Reservoir Type | Concrete/Masonry tank |
| Reservoir Capacity (m3) | 40.0 |
| Pipeline Type | Galvanised Steel |
| Pipeline Length (m) | 3000.0 |
| HouseHold Connections | None |
| Water Point Kiosks | None |
| Troughs | 1 |
| Source Emergency? | Yes |
| No of Trucks | 10 |
| Truck Capacity (m3/hr) | 6.0 |
| Pump Type | Submersible Pump |
| Pump Model | Grundfos |
| Pump Capacity (m3/hr) | 8.0 |
| Pump Level (m) | 28.0 |
| Power Source | Hybrid - Solar/Generator |
| Generator Type | Perkins |
| Generator Capacity (kVA/kWh) | 30.0 |
| Solar Type | None |
| Solar Capacity (kVA/kWh) | 300.0 |
| Supply Condition | Poor |
| Supply System Condition Notes | It's GI |
| Physical Water Issues | No |
| Physical Problem Reason | None |
| Temperature (°C) | None |
| pH | None |
| Electrical Conductivity (µS/cm) | None |
| Total Dissolved Solids (mg/l) | None |
| Water Sample Code | No Document |
| Management Type | Utility/Local Authority |
| WSC | None |
| WSC Established Date | None |
| WSC Male | None |
| WSC Female | None |
| Humans Charged for Water? | No |
| Cost Of Water for Humans (USD) | None |
| Water Charged for Animals? | No |
| Cost Of Water for Animals (USD) | None |
| Last Intervention Agency | None |
| Last Intervention Description | None |
| Last Intervention Date | None |
| Proposed Intervention Description | We proposed 1 new elevated water tank,4 New animal trough 4 New kiosk,extension pipeline 3km solar,pump and riser pipe replacement,fencing wire 100m2 |
| Additional Notes | None |
| History | History BHSNLA019 |