| Code |
DWSLTA010 |
| Water Source Type |
Dug Well |
| Inspecting Agency |
Somaliland_MoWRD |
| Inspection Date |
Nov. 2, 2019 |
| District |
Taleex |
| Settlement Name |
Kalcad |
| Settlement Distance (km) |
None |
| Establishing Agency |
Community |
| Establishing Date |
5/6/2017 |
| Source Name |
Kalcad |
| Latitude |
9.1771 |
| Longitude |
48.1404 |
| Sources Cluster |
0 |
| Water Source Photo |
 |
| Users |
None |
| Permanent? |
yes |
| Months Used |
None |
| Functioning? |
Yes |
| Non Function Reason |
None |
| No of Humans |
2400 |
| No of Camels |
None |
| No of Cattle |
None |
| No of Shoats |
None |
| Irrigation Area (ha) |
None |
| Source Protected? |
Yes |
| Dugwell Depth (m) |
8.0 |
| Dugwell SWL |
3.0 (m) |
| Dugwell Yield (m3/hr) |
0.0 |
| Dugwell operating hours (hrs/day) |
0.0 |
| Dugwell draw down (m) |
0.0 |
| Recovery time (hr) |
None |
| Reservoir Type |
Concrete/Masonry tank |
| Reservoir Capacity (m3) |
None |
| Pipeline Type |
PVC |
| Pipeline Length (m) |
300.0 |
| HouseHold Connections |
0 |
| Water Point Kiosks |
1 |
| Troughs |
0 |
| Source Emergency? |
no |
| No of Trucks |
None |
| Truck Capacity (m3/hr) |
None |
| Pump Type |
None |
| Pump Model |
Grundfos |
| Pump Capacity (m3/hr) |
1.1 |
| Pump Level (m) |
4.0 |
| Power Source |
Submersible Pump |
| Generator Type |
None |
| Generator Capacity (kVA/kWh) |
None |
| Solar Type |
Photovoltaic |
| Solar Capacity (kVA/kWh) |
1.76 |
| Supply Condition |
None |
| Supply System Condition Notes |
The system of supply is poor it needs maintenance |
| Physical Water Issues |
No |
| Physical Problem Reason |
None |
| Temperature (°C) |
31.0 |
| pH |
7.8 |
| Electrical Conductivity (µS/cm) |
3740.0 |
| Total Dissolved Solids (mg/l) |
2670.0 |
| Water Sample Code |
No Document |
| Management Type |
None |
| WSC |
No |
| WSC Established Date |
None |
| WSC Male |
None |
| WSC Female |
None |
| Humans Charged for Water? |
No |
| Cost Of Water for Humans (USD) |
None |
| Water Charged for Animals? |
No |
| Cost Of Water for Animals (USD) |
None |
| Last Intervention Agency |
CARE Somalia |
| Last Intervention Description |
Construction of water tank |
| Last Intervention Date |
07/06/17 |
| Proposed Intervention Description |
Fence of solar
Pipe line replacement into GI pipe
Fence of kiosks by seeling
Pipe line extantation and construction of water kiosks
Riser pipe
Construction of water tank |
| Additional Notes |
None |
| History |
History DWSLTA010 |