Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8084 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Yigoori 8.0 UNICEF 14/04/17 Sixawle 4 8.7228551 47.0288079 623.0 4 rural urban yes Yes 5000 20 0 800 0.0 70.0 pvc 8.0 21.0 24.0 8.0 0.0 0.0 Concrete/Masonry tank 10.0 Galvanised Steel 6500.0 150 7 4 yes 40 9.0 Submersible Pump Ground fost 15.0 60.0 Hybrid - Solar/Generator Perkins 45.0 M2 300.0 good no 33.0 8.0 1260.0 900.0 Communal yes 14/04/16 8 0 no no UNICEF 14/04/20 Solar installed generator pipelines The pipelines system requires replacement as they old and has damages in many parts of the system
7107 Borehole Puntland Ministry of Energy Minerals and Water April 13, 2022 Sanaag laasqoray Dhahar 0.2 UNICEF 01/01/05 Dhahar public borehole 9.7471447 48.8243602 892.0 2 rural urban yes Yes 5000 10000 30000 220.0 pvc 8.0 12.0 24.0 Concrete/Masonry tank 60.0 Galvanised Steel 100.0 1 4 yes 40 8.0 Submersible Pump Grundfos 190.0 Hybrid - Solar/Generator Perkins 60.0 JCNS-M36V300W 22.5 poor Main raising pipes are rusted and the submersible pump is weakly pumping no 32.6 6.6 2500.0 1250.0 Communal yes 0.025 yes UNICEF 01/01/19 Provided Solar system Changed the main raising pipes 1:Larger capacity of water storage 2:22KW inverter 3: Replacement of main raising pipes 4: and submersible pump 5: Pipeline Rehabilitation.
7852 Borehole Puntland Ministry of Energy Minerals and Water April 13, 2022 Sanaag laasqoray Dhahar 0.2 Community_ 01/01/19 Ayaan2 9.7479088 48.8256519 895.0 2 rural urban yes Yes 1500 2000 5000 317.0 pvc 8.0 53.0 14.0 12.0 Concrete/Masonry tank 24.0 Galvanised Steel 300.0 yes 12 8.0 Submersible Pump Luwara 196.0 Solar JCNS-M36V360 19.4 poor The water tank isn''t sufficient no 32.0 7.1 3220.0 1630.0 Private/Individual no no Care - Somaliland IRC - Puntland 01/01/20 Main raising Gi pipes and submersible pump, by Care-Somaliland. Solar power system and the installation by IRC Puntland. 1. Elevated water tank with large storage capacity 2. Generator
7898 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug galkayo wisil 1.4 Community wisil 2 5.4189303 48.1236662 157.0 0 rural urban yes Yes 1400 600 17000 130.0 pvc 8.0 Concrete/Masonry tank 16.0 Galvanised Steel 650 2 3 Submersible Pump ATX(7.5HP) 95.0 Generator perkin 30.0 no 31.0 7.56 2570.0 1280.0 no
7828 Borehole Somaliland MoWRD April 13, 2022 Sool las_caanood Laascaanood 5.0 Somaliland MoWRD 01/01/17 Nugal borehole 2 8.5056211 47.4056216 626.0 6 urban yes Yes 25000 70.0 pvc 8.0 40.0 70.0 12.0 0.0 0.0 Concrete/Masonry tank 300.0 Galvanised Steel 6000.0 3000 0 0 yes 70 9.0 Submersible Pump Grounnfunds 7.5 30.0 Generator Unknown good Very complicated supply system no 30.0 7.2 3800.0 1500.0 Private/Individual
8009 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug galkayo Docol 0.1 DIRECTIAD 08/09/19 Docol BH 6.4326117 47.4920417 238.0 0 rural yes Yes 8100 1400 52000 200.0 pvc 8.0 50.0 14.0 Concrete/Masonry tank 38.0 Galvanised Steel 360.0 506 1 3 yes 20 11.0 Submersible Pump ATX 118.0 Generator perkin 45.0 poor no 30.4 7.86 1650.0 1130.0 Communal yes 2 1 IMC solar
7347 Borehole Puntland Ministry of Energy Minerals and Water April 13, 2022 Sanaag ceerigaabo Buraan 0.5 Kanoko 01/01/88 Buraan borehole 1 10.2111741 48.7745235 942.0 5 rural urban yes Yes 4500 300 500 36.0 pvc 8.0 7.0 4.0 8.0 1.0 Galvanised Steel 300 1 4 yes 8 8.0 Submersible Pump 34.0 Hybrid - Solar/Generator Perkins 33.0 DS60250W 9.0 fair Buraan borehole1 and 2 are connected same water storage tanks, same solar and generator, same animal troughs, same distribution pipes Both boreholes works same hours which is equal 8+8 = 16 hours. no 31.9 7.4 1581.0 775.0 Communal yes 25/05/89 4 2 yes 0.03 yes ACTED 26/08/20 Construction of 1 room Generator Rehabilitation of 3 solar panels. Construction of storage water tank. Replacement of main raising pipes and submersible pump. 1: Amergency replacement of main raising pipes and submersible pump 2: Generator. 3: Replacement of rusted distribution pipes 4: Construction of 1 elevated water tank. 5: Solar power storage (battery).
7108 Borehole Puntland Ministry of Energy Minerals and Water April 13, 2022 Sanaag laasqoray Dhahar 0.2 Community_ 01/01/20 Warsame Aadan borehole 9.7466125 48.8233403 898.0 2 rural urban yes Yes 1500 2000 5000 260.0 pvc 8.0 12.0 24.0 Concrete/Masonry tank 50.0 Galvanised Steel 50.0 1 2 yes 18 8.0 Submersible Pump Grundfos 240.0 Generator Perkins 60.0 poor Since the establishment of the borehole it''s not rehabilitated, Main raising pipes are rusted Pipelines are leaking no 32.0 7.0 2450.0 1250.0 Communal yes 0.025 yes 1:Solar power system 2:Larger capacity of water tank . 3:Battery storage in order to be free from increasing fuel prices. 4: immediate replacement of main raising pipes and the submersible pump. 5: Generator
7228 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug galkayo xibin saxansaxo 1.0 Ahmed shire 06/04/22 xibinsaxansaxo 6.4700108 47.4606597 272.0 0 rural yes Yes 700 2400 60000 250.0 pvc 8.0 45.0 38.0 Other 0.0 Galvanised Steel 10.0 0 0 0 no Submersible Pump T6 (INDIA 7.5kw/10HP) 180.0 Generator Doutz 42.0 1. borehole is newly implemented only is pumped and tested 2. not have other facilities like water tank, animal troughs, generator house and store house and solar system. no 25.7 7.85 665.0 466.0 Communal no no yes 0
7821 Borehole Somaliland MoWRD April 13, 2022 Sool las_caanood Laascaanood 5.0 Private 01/01/17 Nugaal borehole 7 8.508847 47.4071655 617.0 6 urban yes No It is a reserve for the company and is planned to use later on. 70.0 pvc 8.0 40.0 45.0 8.0 0.0 0.0 Concrete/Masonry tank 300.0 Galvanised Steel 0.0 0 0 0 no Submersible Pump Grounfonts 7.5 good Thus borehole is not connected to the system no 30.0 7.2 4000.0 2000.0 Private/Individual no no This borehole is private and reserved