| 7106 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
April 10, 2022 |
Sanaag |
laasqoray |
Baran |
— |
SRCS |
26/08/14 |
Qorof borehole |
— |
10.7053494 |
48.4147012 |
978.0 |
— |
2 |
— |
rural urban |
yes |
— |
No |
17/ 9/ 2021
The reason is pump has stopped the functioning. |
9000 |
600 |
— |
1500 |
— |
— |
352.0 |
pvc |
8.0 |
— |
20.0 |
18.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
48.0 |
Galvanised Steel |
— |
— |
1 |
2 |
yes |
20 |
9.0 |
Submersible Pump |
— |
— |
300.0 |
Hybrid - Solar/Generator |
— |
— |
— |
— |
— |
— |
no |
— |
— |
— |
— |
— |
— |
Communal |
no |
— |
— |
— |
yes |
0.026 |
yes |
— |
— |
— |
— |
26/06/20 |
Solar.
Replacement of submersible pump. |
1: Amergency replacement of main raising pipes and submersible pump.
2: Amergency construction of another boreholes due to lack of water in baran district
3: Replacement of electric cable
4: Construction of caretaker room.
5: Solar power storage ( battery) |
— |
— |
| 8739 |
— |
Borehole |
Somaliland MoWRD |
April 10, 2022 |
Sool |
las_caanood |
Dhabansaar |
0.7 |
ACTED |
10/04/22 |
Dhabansaar borehole |
— |
8.5358823 |
46.9719581 |
765.0 |
— |
1 |
— |
— |
yes |
— |
No |
It is under construction |
— |
— |
— |
— |
— |
— |
314.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
no |
— |
— |
— |
— |
— |
— |
Communal |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
The borehole is under construction. The first test was done 10 April 2022. Few hours before visited the site. All other supply system are not delivered. |
— |
— |
| 8015 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
April 10, 2022 |
Mudug |
galkayo |
Rasan |
2.5 |
Direct Aid |
10/04/21 |
Rasan |
— |
6.6224461 |
47.6490178 |
250.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
— |
— |
— |
— |
— |
— |
235.0 |
pvc |
8.0 |
— |
— |
17.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
45.0 |
Galvanised Steel |
245.0 |
0 |
1 |
3 |
yes |
25 |
12.0 |
Submersible Pump |
lowara |
— |
180.0 |
Hybrid - Solar/Generator |
perkin |
30.0 |
400w |
30.0 |
poor |
— |
no |
— |
33.7 |
7.5 |
1600.0 |
1120.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
| 7231 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
April 10, 2022 |
Mudug |
galkayo |
Farah geedi |
1.0 |
DIRRCTAID |
09/02/16 |
ceelfarah geedi |
— |
6.69753 |
47.521045 |
226.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
10000 |
700 |
250 |
2500 |
1.5 |
— |
240.0 |
pvc |
8.0 |
— |
28.0 |
11.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
16.0 |
Galvanised Steel |
160.0 |
200 |
1 |
3 |
yes |
20 |
11.0 |
Submersible Pump |
granfos |
— |
130.0 |
Solar |
— |
— |
gps |
24.0 |
poor |
1. the Motor is stoped
2. the water tank is very small. |
no |
— |
32.8 |
7.7 |
1600.0 |
830.0 |
— |
Communal |
yes |
— |
3 |
2 |
yes |
0.0045 |
yes |
— |
— |
— |
IRC |
solar |
— |
— |
— |
— |
| 7968 |
— |
Spring |
Puntland Ministry of Energy Minerals and Water |
April 10, 2022 |
Sanaag |
laasqoray |
Baran |
0.7 |
Natural well |
— |
Baran well |
— |
10.7085372 |
48.3352056 |
1026.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
24000 |
2000 |
— |
4000 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
yes |
20 |
9.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
fair |
No water kiosks.
No distribution pipe lines.
No storage tank.
During the drought seasons the water of the well become very low and has no water trucking. |
no |
— |
32.2 |
7.5 |
2000.0 |
1004.0 |
— |
— |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
Community_e |
22/08/21 |
Cleaning. |
1: Animal water troughs.
2: Amergency construction of another boreholes, now the community uses water trucking from another city which far from baran to 50KM |
— |
— |
| 8004 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
April 10, 2022 |
Mudug |
galkayo |
Docole Carfuda |
3.0 |
IRC |
— |
Docole Carfuda |
— |
6.655722 |
47.579592 |
242.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
2000 |
— |
500 |
50000 |
1.0 |
— |
236.0 |
pvc |
8.0 |
— |
17.0 |
18.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
24.0 |
Galvanised Steel |
150.0 |
700 |
1 |
3 |
yes |
5 |
10.0 |
Submersible Pump |
lowara |
— |
210.0 |
Hybrid - Solar/Generator |
perkin |
30.0 |
gps 330 |
24.0 |
fair |
1. it has small water tank |
no |
— |
32.1 |
8.13 |
1710.0 |
1190.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
| 8019 |
— |
Dug Well |
Galmudug Ministry of Energy and Water Resources |
April 10, 2022 |
Mudug |
galkayo |
Dhoobocade |
1.0 |
Community |
— |
dhobocade sw |
— |
6.6320073 |
47.6070084 |
245.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
900 |
3500 |
— |
36000 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
20.0 |
8.5 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
0.0 |
Galvanised Steel |
0.0 |
0 |
0 |
0 |
no |
— |
— |
No Pump |
— |
— |
— |
— |
— |
— |
— |
— |
poor |
no |
no |
— |
32.6 |
8.19 |
1590.0 |
1110.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
no |
— |
— |
— |
— |
| 7813 |
— |
Dug Well |
Galmudug Ministry of Energy and Water Resources |
April 10, 2022 |
Mudug |
galkayo |
ceelweyne |
0.4 |
Community |
— |
ceelweyne |
— |
6.6219878 |
47.6377517 |
248.0 |
— |
— |
— |
rural |
yes |
— |
Yes |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
18.0 |
11.0 |
— |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
0.0 |
Galvanised Steel |
— |
0 |
0 |
0 |
— |
— |
— |
No Pump |
— |
— |
— |
— |
— |
— |
— |
— |
poor |
no |
no |
— |
35.4 |
8.12 |
4250.0 |
2100.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
| 8223 |
— |
Borehole |
Somaliland MoWRD |
April 10, 2022 |
Sool |
las_caanood |
Bali hadhac |
5.0 |
Private |
01/06/21 |
Qorfo borehole |
— |
8.4432918 |
46.9122303 |
803.0 |
— |
1 |
— |
rural urban |
yes |
— |
No |
The pump is not working
|
0 |
0 |
0 |
0 |
0.0 |
— |
430.0 |
pvc |
8.0 |
— |
0.0 |
0.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
32.0 |
Galvanised Steel |
— |
0 |
0 |
4 |
no |
— |
— |
Submersible Pump |
Luwara
|
18.0 |
0.0 |
Generator |
Perkin |
60.0 |
— |
— |
good |
No supply system working |
no |
— |
— |
— |
— |
930.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
It requires pump of 22 kwa and pipes. The pump cannot support the system to produce water from borehole |
— |
— |
| 7096 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
April 10, 2022 |
Sanaag |
laasqoray |
Xubeera |
3.0 |
Somaliland MoWRD |
26/07/14 |
Xubeera borehole 1 |
— |
10.6745068 |
48.4880989 |
912.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
6000 |
3000 |
— |
5000 |
0.25 |
— |
380.0 |
pvc |
8.0 |
265.0 |
16.0 |
16.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
PVC |
— |
— |
1 |
3 |
yes |
5 |
8.0 |
Submersible Pump |
— |
— |
265.0 |
Hybrid - Solar/Generator |
Perkins |
50.0 |
— |
— |
— |
— |
no |
— |
32.4 |
7.3 |
2430.0 |
1234.0 |
— |
Communal |
yes |
24/06/15 |
6 |
5 |
yes |
0.02 |
yes |
— |
— |
— |
ACTED |
27/11/18 |
Replacement of main raising pipes and submersible pump
Solar |
1: Construction of animal water troughs.
2: Construction of elevated water tank.
3: Rehabilitation of storage water tank.
4: Amergency replacement of main raising pipes and submersible pump.
5: Amergency construction of another borehole due water demand.
6: Caretaker room, generator, toilet, and solar power storage( battery)
|
— |
— |