| 7436 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
10/04/22 |
Sanaag |
laasqoray |
Hadaaftimo |
4.0 |
DRC - Puntland |
24/08/18 |
Hadaaftimo Borehole 2 |
— |
10.7383828 |
48.1134322 |
1292.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
18000 |
— |
— |
500 |
1 |
— |
400.0 |
pvc |
8.0 |
276.0 |
17.0 |
20.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
98.0 |
PVC |
— |
1 |
5 |
— |
yes |
25 |
9.0 |
Submersible Pump |
Lowara |
— |
233.0 |
Hybrid - Solar/Generator |
Perkins |
45.0 |
JCNS-M36V370 |
22.2 |
good |
But the village has no water supply system.
The water kiosks are not sufficient to the village. |
no |
— |
32.5 |
7.2 |
1361.0 |
671.0 |
— |
Communal |
yes |
20/09/15 |
3 |
2 |
yes |
0.1 |
— |
— |
— |
— |
NRC |
26/08/20 |
Replacement of main raising pipes and submersible pump. |
1: amergency replacement of main raising pipes and submersible pump.
2: Replacement of electric cable.
3: pipes and pipe fitting equipments.
4: Construction of elevated water tank.
5: Rehabilitation of elevated water tank in order to stop water leaking.
6: Generator
7: Replacement of solar position due crossing river.
8: Construction of caretaker room.
9: Solar power storage ( battery) |
— |
— |
| 8004 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
10/04/22 |
Mudug |
galkayo |
Docole Carfuda |
3.0 |
IRC |
— |
Docole Carfuda |
— |
6.655722 |
47.579592 |
242.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
2000 |
— |
500 |
50000 |
1 |
— |
236.0 |
pvc |
8.0 |
— |
17.0 |
18.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
24.0 |
Galvanised Steel |
150.0 |
700 |
1 |
3 |
yes |
5 |
10.0 |
Submersible Pump |
lowara |
— |
210.0 |
Hybrid - Solar/Generator |
perkin |
30.0 |
gps 330 |
24.0 |
fair |
1. it has small water tank |
no |
— |
32.1 |
8.13 |
1710.0 |
1190.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
| 7968 |
— |
Spring |
Puntland Ministry of Energy Minerals and Water |
10/04/22 |
Sanaag |
laasqoray |
Baran |
0.7 |
Natural well |
— |
Baran well |
— |
10.7085372 |
48.3352056 |
1026.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
24000 |
2000 |
— |
4000 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
yes |
20 |
9.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
fair |
No water kiosks.
No distribution pipe lines.
No storage tank.
During the drought seasons the water of the well become very low and has no water trucking. |
no |
— |
32.2 |
7.5 |
2000.0 |
1004.0 |
— |
— |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
Community_e |
22/08/21 |
Cleaning. |
1: Animal water troughs.
2: Amergency construction of another boreholes, now the community uses water trucking from another city which far from baran to 50KM |
— |
— |
| 7993 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
10/04/22 |
Mudug |
galkayo |
bilaale |
0.5 |
ICRC |
09/02/11 |
bitaale 2 |
— |
6.7053621 |
47.8377885 |
229.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
1200 |
7800 |
3550 |
55000 |
— |
— |
206.0 |
pvc |
9.0 |
— |
16.0 |
19.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
60.0 |
Galvanised Steel |
200.0 |
150 |
1 |
3 |
yes |
8 |
12.0 |
Submersible Pump |
granfos |
— |
180.0 |
Hybrid - Solar/Generator |
perkin |
30.0 |
300w |
21.0 |
poor |
— |
no |
— |
36.7 |
7.28 |
1800.0 |
930.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
IMC |
water tank |
— |
08/02/21 |
— |
— |
| 7994 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
10/04/22 |
Mudug |
galkayo |
bandarqali |
1.0 |
— |
— |
Bandarqali |
— |
6.6250625 |
47.851633 |
231.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
2400 |
— |
— |
— |
— |
— |
250.0 |
pvc |
9.0 |
— |
20.0 |
9.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
52.0 |
Galvanised Steel |
230.0 |
300 |
1 |
3 |
yes |
6 |
10.0 |
Submersible Pump |
franglin |
— |
180.0 |
Solar |
— |
— |
gps 330 |
24.0 |
poor |
poor water supply system |
no |
— |
30.8 |
7.66 |
1800.0 |
910.0 |
— |
Communal |
yes |
— |
— |
— |
— |
— |
— |
— |
— |
— |
IRC |
solar |
— |
— |
— |
— |
| 7995 |
— |
Borehole |
Somaliland MoWRD |
10/04/22 |
Sool |
las_caanood |
Xidhxidh |
2.0 |
EKIM TURKEY |
10/02/20 |
Xidhxidh |
— |
8.3548402 |
46.9725159 |
758.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
40000 |
14000 |
100 |
20000 |
0 |
— |
510.0 |
pvc |
8.0 |
420.0 |
9.6 |
20.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
30.0 |
Galvanised Steel |
60.0 |
8000 |
1 |
5 |
yes |
35 |
8.0 |
Submersible Pump |
Liwara |
18.0 |
420.0 |
Hybrid - Solar/Generator |
Perkins |
60.0 |
Photovoltiac |
390.0 |
good |
The supply system is good |
no |
— |
37.0 |
7.5 |
1800.0 |
870.0 |
— |
Communal |
yes |
10/04/20 |
4 |
0 |
no |
— |
no |
— |
— |
— |
USAID |
04/01/22 |
Solar integration, construction of animal troughs and fencing |
The borehole requires sports for the generator and pipelines.if one pipe breaks no spare part available there. |
— |
— |
| 8013 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
10/04/22 |
Mudug |
galkayo |
Bitaale |
0.1 |
former government of somalia |
06/09/86 |
Bitaale |
— |
6.705377 |
47.8340365 |
190.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
3800 |
8000 |
— |
— |
1.5 |
— |
230.0 |
pvc |
10.0 |
— |
— |
16.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
60.0 |
Galvanised Steel |
380.0 |
300 |
1 |
2 |
yes |
7 |
9.0 |
Submersible Pump |
lowara |
— |
130.0 |
Generator |
Doutz |
30.0 |
— |
— |
poor |
— |
no |
— |
35.3 |
7.57 |
1620.0 |
820.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
IOM |
small water tank |
— |
— |
— |
— |
| 7423 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
10/03/22 |
Mudug |
goldogob |
Bursaalah |
— |
Community |
10/03/06 |
Bursaalax water company BH 1 |
— |
7.1847943 |
47.2331085 |
364.0 |
— |
7 |
— |
urban |
yes |
— |
Yes |
— |
14000 |
— |
— |
— |
— |
— |
220.0 |
pvc |
8.0 |
— |
12.5 |
20.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
138.0 |
Galvanised Steel |
4000.0 |
2000 |
3 |
— |
no |
— |
— |
Submersible Pump |
Lowara |
15.0 |
190.0 |
Hybrid - Solar/Generator |
Parkins |
90.0 |
BR-M300 |
31.5 |
good |
— |
yes |
Colorless and odorless |
30.0 |
8.25 |
1925.0 |
1289.75 |
— |
Utility/Local Authority |
— |
— |
— |
— |
yes |
0.15 |
no |
— |
— |
— |
Community |
10/03/21 |
1. Rehabilitation of pump and riser pipes
2. Flashing. |
1. Fancing.
2. Rehabilitation of generator.
3. Construction of new elevated tank. |
— |
— |
| 8731 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
10/03/22 |
Mudug |
goldogob |
Bursaalax |
— |
PSAWEN |
10/03/08 |
Bursalax water company BH 2 |
— |
7.1833919 |
47.2283962 |
374.0 |
— |
3 |
— |
— |
no |
— |
Abandoned |
— |
— |
— |
— |
— |
— |
— |
196.0 |
pvc |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
— |
Other |
— |
— |
— |
— |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
poor |
Not functioning |
no |
— |
— |
— |
— |
— |
— |
Utility/Local Authority |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
Poor of yield so needs drilling of new borehole |
— |
— |
| 7160 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
10/03/22 |
Mudug |
goldogob |
Bursalax |
— |
Community |
10/03/10 |
Bursalax water company BH 3 |
— |
7.1834657 |
47.2280446 |
373.0 |
— |
3 |
— |
urban rural |
yes |
— |
Yes |
— |
14000 |
50 |
20 |
500 |
0 |
— |
236.0 |
pvc |
8.0 |
— |
28.5 |
16.0 |
— |
2.3 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
40.0 |
Galvanised Steel |
600.0 |
— |
1 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
15.0 |
186.0 |
Generator |
Parkins |
45.0 |
— |
— |
fair |
Something rehabilitation needed |
yes |
Colorless and odorless |
31.0 |
8.1 |
1811.0 |
1213.3 |
— |
Utility/Local Authority |
— |
— |
— |
— |
yes |
0.05 |
yes |
— |
— |
— |
CARE Somalia |
10/02/21 |
1. Fancing
3. Construction of koisk. |
1. Installation of solar power
2. Rehabilitation of generator. |
— |
— |