| 8325 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
09/04/22 |
Bari |
bossaso |
Jiingada |
0.8 |
Aquatera |
01/01/87 |
Jiingada borehole |
— |
10.7199 |
49.144387 |
564.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
400 |
680 |
— |
1030 |
2 |
— |
100.0 |
gi |
8.0 |
36.0 |
12.0 |
16.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
40.0 |
Galvanised Steel |
700.0 |
11 |
4 |
2 |
yes |
5 |
8.0 |
Submersible Pump |
— |
— |
98.0 |
Hybrid - Solar/Generator |
Perkins |
35.0 |
— |
22.6 |
poor |
Settlement water supply system has stopped functioning due to rusting and luck of Rehabilitation. |
no |
— |
— |
— |
— |
— |
— |
Communal |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
| 8100 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
09/04/22 |
Mudug |
galkayo |
Bandiradley |
0.8 |
zamzam foundation |
20/11/22 |
Daarosalam |
— |
6.4620821 |
47.0007488 |
303.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
500 |
5000 |
750 |
25000 |
— |
— |
172.0 |
pvc |
9.0 |
— |
— |
18.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
40.0 |
Galvanised Steel |
120.0 |
0 |
1 |
3 |
yes |
15 |
10.0 |
Submersible Pump |
not specified |
— |
75.0 |
Hybrid - Solar/Generator |
Doutz |
30.0 |
400w |
22.0 |
poor |
1. not water distribution pipes
2. not have enough storage |
no |
— |
33.4 |
8.2 |
1192.0 |
835.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
not |
— |
— |
— |
— |
| 7973 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
09/04/22 |
Sanaag |
laasqoray |
Midigale |
5.0 |
Community_ |
08/09/10 |
Midigale dug well2 |
— |
10.6892739 |
48.6736626 |
799.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
2520 |
500 |
— |
3000 |
1 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
10.0 |
7.0 |
— |
11.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
28.0 |
Galvanised Steel |
700.0 |
— |
4 |
2 |
no |
— |
— |
Submersible Pump |
— |
— |
— |
Hybrid - Solar/Generator |
— |
— |
— |
— |
poor |
Yield is low.
Distributions pipes are rusted.
No sufficient water kiosks in the village.
Distribution pipe lines are disconnected due to the floods. |
no |
— |
32.1 |
7.5 |
1987.0 |
995.0 |
— |
Communal |
yes |
11/05/00 |
7 |
3 |
no |
— |
no |
— |
— |
— |
Puntland MoEMW |
12/05/17 |
Placement of distribution pipe lines.
Construction of elevated water tank. |
1: Construction of generator room
2: Digging the deep of the well in order to increase the yield of well.
3: Generator
4: Placement of distribution pipe lines.
5: Rehabilitation of animal water troughs.
5: Rehabilitation of water kiosks.
6: Amergency construction of borehole |
— |
— |
| 7708 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
09/04/22 |
Sanaag |
laasqoray |
Midigale |
0.5 |
ADESO |
01/01/03 |
Midigale dugwell 1 |
— |
10.6839932 |
48.6763163 |
809.0 |
— |
3 |
— |
urban |
yes |
— |
Yes |
— |
900 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
12.0 |
5.0 |
3.5 |
2.0 |
7.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
PVC |
1500.0 |
60 |
1 |
— |
no |
— |
— |
Submersible Pump |
Luwara |
— |
12.0 |
Solar |
— |
— |
— |
3.0 |
poor |
1:Submersible pump is not functioning properly.
2:And the well needs to be expanded deeply. |
no |
— |
32.1 |
7.5 |
1987.0 |
995.0 |
— |
Communal |
— |
— |
— |
— |
yes |
0.01 |
no |
— |
— |
— |
CARE-Somaliland |
01/01/17 |
Elevated water tank
Solar
Submersible pump |
1:Immediate change of the submersible pump
2:PVC pipes
3:Digging the well deeply
4:Generator if possible or solar power storage of battery.
|
— |
— |
| 7762 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
09/04/22 |
Mudug |
galkayo |
Galinsoor |
0.5 |
Community |
08/02/12 |
ceel Barwaqo |
— |
6.4255093 |
46.7011536 |
359.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
19112 |
20000 |
— |
— |
— |
— |
196.0 |
pvc |
8.0 |
— |
— |
17.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Galvanised Steel |
128.0 |
1112 |
0 |
1 |
yes |
20 |
22.0 |
Submersible Pump |
lowara |
— |
132.0 |
Hybrid - Solar/Generator |
perkin |
30.0 |
350w |
26.0 |
fair |
1. not have water tanks
2. not have Distribution pipesline |
no |
— |
33.0 |
8.67 |
626.0 |
437.0 |
— |
Communal |
yes |
— |
— |
— |
yes |
0.0015 |
— |
— |
— |
— |
IRC |
solar |
— |
— |
— |
— |
| 7220 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
09/03/22 |
Bari |
qardho |
Xida |
0.2 |
— |
12/05/13 |
Xida borehole |
— |
9.9550299 |
49.0565495 |
909.0 |
— |
1 |
— |
rural urban |
yes |
— |
No |
The source stopped 24/04/2019
Unknown problem. |
9000 |
2500 |
— |
6000 |
— |
— |
370.0 |
pvc |
8.0 |
— |
10.0 |
13.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
Galvanised Steel |
300.0 |
— |
1 |
2 |
yes |
5 |
10.0 |
Submersible Pump |
Lowara |
— |
348.0 |
Generator |
Perkin |
44.0 |
— |
— |
fair |
There is no water supply system in the village and kiosks. |
no |
— |
— |
— |
— |
— |
— |
Communal |
yes |
10/09/13 |
4 |
2 |
no |
— |
yes |
— |
— |
— |
DRC - Puntland |
16/08/18 |
Replacement of main raising pipes and submersible pump. |
1: Assessments of the borehole problem in order to start borehole functioning.
2: Installation of solar power system. |
— |
— |
| 7086 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
09/03/22 |
Mudug |
goldogob |
Riig-oomane |
0.5 |
WDA |
09/05/77 |
Riig-oomane BH 1 |
— |
7.2029785 |
47.1922316 |
367.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1000 |
500 |
300 |
1000 |
2 |
— |
210.0 |
pvc |
8.0 |
130.0 |
4.0 |
8.0 |
— |
5.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
160.0 |
Galvanised Steel |
3000.0 |
200 |
5 |
4 |
yes |
10 |
8.0 |
Submersible Pump |
— |
11.0 |
151.0 |
Hybrid - Solar/Generator |
Perkins |
45.0 |
Szyl-p325-36 |
32.5 |
good |
— |
yes |
Colorless and odorless |
39.5 |
7.6 |
2100.0 |
1035.0 |
— |
Communal |
yes |
10/05/02 |
3 |
0 |
yes |
0.05 |
yes |
— |
— |
— |
— |
— |
— |
Rehabilitation of pipelines
Rehabilitation of kiosks and animal thoughts
Rehabilitation of pump
New generator
Borehole around fencing |
— |
— |
| 7211 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
09/03/22 |
Bari |
qardho |
Waciye |
3.0 |
Puntland MoEMW |
14/08/06 |
Waciye borehole |
— |
10.0226469 |
49.0389998 |
883.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
3000 |
1000 |
— |
10000 |
— |
— |
380.0 |
pvc |
8.0 |
— |
8.0 |
10.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
96.0 |
Galvanised Steel |
— |
300 |
1 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
— |
294.0 |
Hybrid - Solar/Generator |
Perkins |
45.0 |
— |
— |
good |
The borehole distributes water on two elevated water tank.
One elevated water distributes water to the kiosks and animal troughs.
And onother elevated water tank distribute water to waciye city.
The city contains around 300 House holds. |
no |
— |
27.7 |
7.31 |
4150.0 |
2070.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
yes |
— |
— |
— |
IOM |
13/08/18 |
Installation of solar power system.
Replacement of main raising pipes and submersible pump. |
Replacement of all rusted distribution iron pipes.
Replacement of main raising pipes and submersible pump.
Generator.
Construction of one kiosks. |
— |
— |
| 7210 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
09/03/22 |
Bari |
qardho |
Kala dhac |
7.0 |
IR |
26/05/19 |
Kaladhac borehole |
— |
10.0486823 |
48.9363469 |
966.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
6000 |
500 |
— |
10000 |
— |
— |
350.0 |
pvc |
8.0 |
212.0 |
11.0 |
13.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
40.0 |
Galvanised Steel |
270.0 |
— |
1 |
3 |
yes |
8 |
9.0 |
Submersible Pump |
Lowara |
— |
318.0 |
Hybrid - Solar/Generator |
Perkins |
60.0 |
SZYL-M330-36 |
24.75 |
fair |
— |
no |
— |
27.7 |
7.28 |
4350.0 |
2150.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
yes |
— |
— |
— |
Puntland MoEMW |
09/05/21 |
Replacement of main raising pipes and submersible pump. |
1: Generator.
2: Replacement of 5 solar panels.
3: Replacement of main raising pipes and submersible pump.
4: Replacement of rusted distribution pipe lines. |
— |
— |
| 7143 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
09/03/22 |
Mudug |
goldogob |
Daarasalaam |
— |
Community |
09/03/11 |
Daarasalaam BH |
— |
7.2566882 |
47.1067542 |
367.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
10500 |
2500 |
200 |
2000 |
12 |
— |
168.0 |
pvc |
8.0 |
— |
16.0 |
15.0 |
— |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
62.0 |
PVC |
3500.0 |
700 |
8 |
4 |
yes |
10 |
8.0 |
Submersible Pump |
Grand fos |
15.0 |
162.0 |
Hybrid - Solar/Generator |
Parkins |
45.0 |
DS734OM |
23.12 |
fair |
Needs rehabilitation |
yes |
Colorless and odorless |
32.6 |
7.71 |
2470.0 |
1654.4 |
— |
Communal |
yes |
09/03/11 |
4 |
2 |
yes |
0.05 |
yes |
— |
— |
— |
IRC |
09/03/17 |
Installation of solar power |
Full rehabilitation:
1. Rehabilitation of pipes
2. Rehabilitation of pump and riser pipes
3. Rehabilitation of and construction of animal throughts
4. Construction of elevated tank |
— |
— |