Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7611 Borehole Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Raf iyo raaxo 1.0 GUMCO 05/09/18 Waadikhayr borehole 11.2567572 49.1954006 20.0 14 urban yes Yes 79.0 pvc 8.0 50.0 13.0 20.0 Steel tank PVC Submersible Pump Lowara 78.0 Generator Perkins 65.0 no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 05/07/21 Replacement of main raising pipes and submersible pump. 1: Solar power system and solar power storage ( battery) 2: Generator 3: pipe line and submersible pump
7619 Dug Well Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Madaxtooyo 5.0 GUMCO 05/01/20 Madaxtooyo dugwell 3 11.2798887 49.2059442 -2.0 14 urban yes Yes 28.0 24.0 38.0 21.0 Concrete/Masonry tank PVC Submersible Pump Lowara 27.0 Generator Perkins 165.0 good no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 06/01/22 Replacement of main raising pipes 1: Solar 2: Construction of storage water tank
7612 Borehole Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Girible 4.0 GUMCO 05/11/10 Girible borehole 11.2394151 49.2154859 44.0 14 urban yes Yes 78.0 pvc 8.0 40.0 15.0 21.0 Steel tank PVC Submersible Pump 77.0 Generator Eveco 120.0 no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 26/08/21 Replacement of main raising pipes and submersible pump. 1: Solar with battery. 2: Pump and pipes. 3: electric cable. 4: Construction of another borehole due to water demand.
7614 Borehole Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Aaran 3.0 Saynab borehole 11.2430876 49.2090253 57.0 14 urban yes Yes 77.0 pvc 8.0 50.0 10.0 20.0 Steel tank PVC Submersible Pump Lowara 76.0 Generator Perkins 80.0 no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 05/10/21 Replacement of main raising pipes and submersible pump Solar power system. Distribution pipes. Pump.
7615 Borehole Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Girible 4.0 GUMCO 04/08/10 Mire borehole 11.2399293 49.2148956 45.0 14 urban yes Yes 76.0 pvc 8.0 50.0 11.0 21.0 Steel tank PVC Submersible Pump Lowara 75.0 Generator Eveco 120.0 no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 15/10/21 Replacement of main raising pipes and submersible pump. 1: Installation of solar power system. 2: Pipes and submersible pump 3: Construction of toilet
7620 Dug Well Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Madaxtooyo 5.0 GUMCO 12/09/19 Madaxtooyo dugwell 2 11.2800083 49.2059333 -2.0 14 urban yes Yes 27.0 23.0 38.0 21.0 Concrete/Masonry tank PVC Submersible Pump Lowara 26.0 Generator Perkins 165.0 good no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 yes GUMCO 05/01/22 Replacement of main rasing pipes and submersible pump 1: Extention of pipe line 2: Construction of storage water tank 3: Solar power system
7952 Borehole Somaliland MoWRD 05/04/22 Sool taleex Taleex 4.0 ACTED 01/01/20 Xerta borehole 9.1008277 48.430584 568.0 2 rural urban yes Yes 500 1300 0 2600 0 150.0 pvc 8.0 25.0 3.0 4.0 0.0 0.0 Concrete/Masonry tank 24.0 Galvanised Steel 300.0 120 1 4 no Submersible Pump Lowara 11.0 139.0 Hybrid - Solar/Generator Perkins 45.0 Photovoltiac 30.0 good The supply system is good but pipes need replacement soon no 31.0 8.9 2186.0 2800.0 Communal no no no ACTED 05/01/21 Installation of solar system in the borehole The pipes are old and soil is salt so it destroys easily. It can be seen leakages of the pipes from borehole to village
7616 Borehole Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Aaran 3.0 GUMCO 06/12/08 Aaran borehole 2 11.2415982 49.2066493 41.0 14 urban yes Yes 70.0 pvc 8.0 50.0 10.0 20.0 Steel tank PVC Submersible Pump Lowara 69.0 Generator Perkins 80.0 fair Yield is low no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 05/11/21 Replacement of main raising pipes and submersible pump Installation of solar power system. Distribution pipes
7617 Borehole Puntland Ministry of Energy Minerals and Water 05/04/22 Bari bossaso Aaran 3.0 GUMCO 08/06/08 Aaran borehole 1 11.2417607 49.2070245 50.0 14 urban yes Yes 50.0 pvc 8.0 40.0 13.0 21.0 Concrete/Masonry tank PVC Submersible Pump Lowara 49.0 Generator Perkins 80.0 good no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 14/01/22 Replacement of main raising pipes and submersible pump Installation of solar power system. Pipe line.
7910 Dug Well Somaliland MoWRD 05/04/22 Sool taleex Taleex 0.0 Sayidka 31/12/1899 Taleex dheere 9.1503639 48.4218371 607.0 2 rural urban yes Yes 20000 1800 0 4300 0 10.0 1.0 10.0 12.0 2.0 1.0 Concrete/Masonry tank 12.0 Galvanised Steel 2.0 4000 1 2 yes 5 8.0 Submersible Pump Laura 8.0 5.0 Solar Photovoltiac 30.0 good The dug well is working well but it is very risk because it has been protected and children fetch water alone no 36.0 7.6 2450.0 1200.0 Communal no no no Somaliland MoWRD 06/04/18 Solar system installation It requires protection and to cover the dug well to avoid risk. To increase kiosk and pipe system