Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
4499 DWSLTA020 Dug Well SWALIM_WSIS 20/05/08 Sool Taleex Xerta Taleex 1 9.1503 48.425 634.0 Yes Yes 7.0 2455.0 Water Sources Inventory Survey – WSIS
8061 Dug Well Somaliland MoWRD 20/04/22 Sanaag ceerigaabo Cerigabo 4.0 Community 20/12/87 Shallow well daran guduudan. 10.6523372 47.3745735 1797.0 1 rural urban yes Yes 500 50 200 400 5 28.0 10.0 10.0 12.0 2.0 1.0 Other 30.0 Galvanised Steel 100.0 400 1 1 no Submersible Pump Luwera 10.0 15.0 Generator Franklina 18.0 good 1.Lack of water supply system. 2.Solar panels installation. 3.Pump no 25.0 8.0 1351.0 944.0 Private/Individual no no 0 1.Lack of water supply system. 2.Solar panels installation. 3.Pump
8140 Borehole Somaliland MoWRD 20/04/22 Sanaag ceerigaabo Cerigabo 2.0 Community 15/01/22 Borehole ceelqoray 10.5780664 47.3914001 1675.0 1 rural urban yes Yes 200 200 200 450 5 150.0 gi 8.0 25.0 18.0 12.0 0.0 0.0 Concrete/Masonry tank 0.0 Stainless Steel 100.0 1 1 0 no Submersible Pump Luwera 18.0 120.0 Generator Linz 50.0 good 1. In adequate water supply no 31.0 7.7 1000.0 670.0 Private/Individual no no 0 1.Water tank building 25 cubic meter 2.Solar installation 3. Pump and pipline
6737 BKNGGA001 Berkad ICRC 20/04/13 Nugaal Garoowe Dudumaale Dudumaale 8.1361 48.7815 658.0 No No 129 1032 129 Dudumale community will complete remianed excavation and reshape as round BKD up to 13m daimeter X 4m depth, the construction of 13m daimeter X 4m depth BKD is suggested. Water Sources Data from Partners – WSD_Pat
7538 Borehole Puntland Ministry of Energy Minerals and Water 20/03/22 Bari iskushuban Baargaal 1.0 Former Somali Government 21/05/86 Bargaal borehole 1 11.2839238 51.0707089 -28.0 2 rural urban yes Yes 6000 200 3500 24.0 gi 8.0 15.0 8.0 14.0 Concrete/Masonry tank 40.0 PVC 400 2 2 yes 4 3.0 Submersible Pump Lowara 17.0 Hybrid - Solar/Generator Perkins 66.0 GPS-300-380 fair There is no good yield. The power of solar is very low. no 31.1 7.8 1077.0 533.0 Communal yes 21/08/93 7 0 yes 0.05 no NRC 09/10/21 1: Installation of solar power system. 2: Replacement of submersible pump, main raising pipes, and some distribution pipe lines. 3: Construction of caretaker room. 4: Rehabilitation of elevated water tank. 1: Generator. 2: extension of distribution pipe line in order to supply water to the city. 3: Construction generator room and toilet. 4: Fuel.
7403 Dug Well Puntland Ministry of Energy Minerals and Water 20/03/22 Bari iskushuban Waadi khayr 0.1 Community_ 20/03/91 Waadi khayr dug well 11.128186 51.0563147 -26.0 1 urban rural yes Yes 900 500 1000 8.0 6.0 4.0 4.0 Concrete/Masonry tank 8.0 PVC 15 6 2 yes 3 2.0 Submersible Pump Lowara 7.0 Hybrid - Solar/Generator Diesel generator fair There is no good yield. The elevated water tank is very ismall no 27.8 8.0 1857.0 928.0 Communal yes 21/09/19 3 2 yes 0.2 no CARE Somalia 20/10/21 Installation of solar power system. Installation of pump and raising pipes. Construction 6 kiosks and it''s distribution pipe line. Construction of generator room Construction of another kiosks in the village Digging the deep of the well in order to increase the yield Construction of another elevated water tank
7405 Dug Well Puntland Ministry of Energy Minerals and Water 20/03/22 Bari iskushuban Cadayo 0.5 IR 20/06/21 Cadayo dug well 11.003073 51.0976064 -50.0 1 rural urban yes Yes 360 600 2000 0.25 8.0 7.0 6.0 6.0 Concrete/Masonry tank 36.0 PVC 600.0 3 2 yes 7 6.0 Submersible Pump Lowara 8.0 Hybrid - Solar/Generator Kama fair The yield of dug well is low. The water demand of the village and surrounding area is very high. no 28.0 7.9 1699.0 849.0 Communal yes 20/12/21 3 2 yes 0.2 no IR 20/11/21 Installation of solar power system. 1: Replacement of main raising pipes. 2: electric cable 3: Construction of dug well cover protection. 4: Construction of another 3 kiosks in the village. 5: Construction of caretaker room and toilet.
8120 Borehole Puntland Ministry of Energy Minerals and Water 20/03/22 Bari iskushuban Baargaal 1.0 Community_ 18/02/21 Baargal borehole 2 11.2846495 51.0714189 30.0 2 rural urban yes Yes 24.0 pvc 8.0 15.0 12.0 Submersible Pump Lowara 18.0 fair No storage water tank No distribution pipe line The bore hole is new and has no water structures. no 27.9 7.8 1077.0 533.0 Communal yes 21/08/93 7 0 No intervention is performed because the borehole is new. 1: Elevated water tank 2: Distribution pipe line. 3: Installation of solar power system.
7291 Borehole Puntland Ministry of Energy Minerals and Water 20/02/22 Nugaal eyl Dhanaane 6.5 CARE Somalia 07/01/07 Dhnaane BH 7.7738103 49.7791205 224.0 0 rural urban yes Yes 2000 500 10000 0.018 180.0 pvc 8.0 8.0 12.0 0.4 Concrete/Masonry tank 8.0 Galvanised Steel 7000.0 270 3 2 yes 15 90.0 Submersible Pump Lowara 15.0 140.0 Hybrid - Solar/Generator Parkins 30.0 SZYL-M330-36 22.1 fair The condition of this supply is needs rehabilitation yes Colorless and odorless 35.2 6.97 1801.0 894.0 Communal yes 20/01/07 5 2 yes 0.1 yes Puntland MoEMW 15/01/13 Extension of pipelines. Repaired of pump. Rehabilitation of tanks. Rehabilitation of generator Water supply Rehabilitation.
7230 Borehole Puntland Ministry of Energy Minerals and Water 20/02/22 Bari qardho Uuskure 3.0 SC-UK 15/01/19 Uuskure borehole 8.8064715 49.7419923 400.0 1 rural urban yes Yes 20000 5000 24000 330.0 pvc 8.0 240.0 12.0 Concrete/Masonry tank 40.0 Galvanised Steel 430.0 4000 1 2 yes 7 9.0 Submersible Pump Lawara 318.0 Hybrid - Solar/Generator Perkins 65.0 300-72M 25.5 good Main raising pipes are good Elevated water tank is good Pump is good Well casing is good. no 23.0 6.7 4100.0 2000.0 Communal yes 24/01/19 3 2 yes 0.025 yes Puntland MoEMW 20/07/21 Replacement of main raising pipes Construction of new elevated water tank Construction of another animal water troughs Increasing of solar panels Incentives of caretakers.