Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8008 — Borehole Somaliland MoWRD March 29, 2022 Togdheer buuhoodle Coodanle 1.0 Somaliland MoWRD 14/11/17 Coodanle borehole — 8.335055374 46.04233207 675.0 — 1 — urban rural yes — Yes — 12000 6000 0 45000 0.0 — 350.0 pvc 8.0 32.0 8.0 5.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 36.0 PVC 1500.0 2000 9 6 no — — Submersible Pump Laura 15.0 327.0 Generator JP45 45.0 — — good The supply system is good and functioning no — 36.0 7.0 1666.0 1100.0 — Communal yes 24/11/17 4 2 no — no — — — CARE Somalia 10/03/21 Borehole rehabilitation Currently the generators needs to be changed and also rehabilitation of the solar system is needed. — —
8460 — Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Cuun — — — Cuun dugwell 2 — 8.8162779 48.8932247 465.0 — 2 — urban yes — No A months , for power problems 750 — — — — — — — — — — — — — 9.0 — 7.0 — — — — — — — — — — — — — — — — — — — 3 — no — — No Pump — — — — — — — — poor This dugwell and its water supply needs full rehabilitation no — — — — — — Communal yes 15/04/07 3 2 no — no — — — — — — 1. Rehabilitation of pipes 2. Rehabilitation of koisks 3. Replacement of pump. 4. — —
8352 — Borehole Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Salaama 2 — Community 28/03/17 Salaama 2 — 8.5915196 49.0676655 467.0 — 2 — rural yes — Yes — 150 1500 — 3000 0.0 — 76.0 pvc 8.0 — 16.0 12.0 — 1.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 32.0 PVC — 2 2 2 yes 0 — Submersible Pump 7.5 7.5 45.0 Solar — — — 10.8 good — yes Colorless and odorless — — — — — Private/Individual — — — — no — no — — — Community 17/04/20 1. Solar installation 1. Replacement of generator. 2. Replacement of pump. — —
8165 — Spring Puntland Ministry of Energy Minerals and Water March 28, 2022 Bari iskushuban Ufayn sare 4.0 Community_ 22/06/12 Ufayn sare spring — 10.7955108 49.6675304 692.0 — 1 — rural urban yes — Yes — 4800 500 — 1000 4.0 — — — — — — — — — — — — — — — — — — — — — 25.0 — — — — Concrete/Masonry tank 60.0 Galvanised Steel 3000.0 — — 1 yes 4 6.0 Submersible Pump Lowara — — — — — — — — — no — 31.1 8.0 750.0 375.0 — Communal yes 20/06/12 2 1 no — no — — — Community_e 21/08/19 Extention of distribution pipe lines 1: extention of distribution pipe line to the village, now water does not reach to village. 2: Construction water kiosks in the village. 3: Construction of columns which holds the distribution pipe line when they crosses to the rivers, now pipes become disconnected floods occurs. 4: pipe lines as safety. 5: Construction of elevated water tank. — —
7195 — Borehole Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Xamur 0.5 UNICEF 28/03/18 Xamur BH — 8.7266831 48.7464455 346.0 — 1 — urban rural yes — No Before 5 month, problem of pump and cables 700 1200 — 2700 — — 306.0 pvc 8.0 — 6.0 — — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 80.0 PVC 700.0 — 3 2 no — — Submersible Pump Lowara 7.5 246.0 Hybrid - Solar/Generator Parkins 30.0 GPS-300-380 12.92 good — no — — — — — — Communal yes 28/03/18 4 0 yes 0.05 yes — — — NRC 28/02/21 1. Construction of new elevated tank 2. Installation of solar power 4. Extension of pipelines 1. Emergency 2. Borehole problem not known — —
8339 — Borehole Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Cuun 1.5 KAALO Relief and Development 28/03/19 Cuun BH — 8.8277843 48.8852797 468.0 — 1 — urban yes — No From 1 a month, problem borehole with pump and riser pipes 250 — — — — — 110.0 pvc 8.0 11.0 60.0 8.0 — 1.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 25.0 Galvanised Steel 500.0 — — — no — — Submersible Pump Lowara 7.5 90.0 Solar — — YL320P-35b 12.16 good — no — — — — — — Communal yes 28/03/18 5 2 no — no — — — KAALO Relief and Development 28/03/19 1. Installation of solar power 1. Rehabilitation of pump and riser pipes — —
7868 — Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Cuun 0.0 Community 28/03/00 Cuun dug well — 8.8180342 48.8915942 468.0 — 1 — urban yes — Yes — 1162 — — — — — — — — — — — — — 9.0 3.0 6.0 8.0 — 2.0 — — — — — — — — — — — Concrete/Masonry tank 25.0 PVC 600.0 0 2 0 yes 2 8.0 Submersible Pump Lowara 4.0 8.0 Solar — — — 5.0 fair Some rehabilitation needed yes Colorless and odorless 32.8 7.8 2920.0 1460.0 — Communal no — — — no — no — — — — — — 1. Rehabilitation of pipelines 2. Construction of koisks 3. Extension of pipelines. — —
7092 — Borehole Puntland Ministry of Energy Minerals and Water March 28, 2022 Bari iskushuban Kobdhexaad 0.3 Puntland MoEMW 30/03/07 Kobdhexaad borehole — 10.6578856 49.4993533 467.0 — 1 — rural yes — Yes — — 1300 — 4000 — — 360.0 pvc 8.0 220.0 20.0 4.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 40.0 Galvanised Steel 360.0 — 1 3 yes 4 9.0 Submersible Pump Lowara — 312.0 Generator Perkins 60.0 — — fair Human being can not use water ftom kobdhrxaad borehole because the water is over salt. The distribution pipes are rusted. no — 33.8 7.7 2920.0 1460.0 — Communal yes 13/07/07 5 2 yes 0.03 yes — — — IDB 18/08/17 1: Construction of elevated water tank 2: Construction of animal troughs. 1: Construction of another elevated water tank 2: Installation of solar power system. 3: Rehabilitation of animal water troughs. 4: Replacement of main raising pipes and submersible pump. 5: Fuel in order to access borehole function — —
7115 — Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Caano-yaskax 0.0 CEFA 28/03/07 Caano yaskax dugwell — 8.837375 48.7501967 452.0 — 1 — urban rural yes — Yes — 1750 250 500 2000 0.0 — — — — — — — — — 9.0 2.0 2.0 8.0 — 4.0 — — — — — — — — — — — Concrete/Masonry tank 30.0 PVC 700.0 1 4 2 no — — Submersible Pump Sara 4.0 8.0 Solar — — — 2.0 good — yes Colorless and odorless 30.5 7.8 3150.0 1570.0 — Communal yes 28/03/19 7 0 yes 0.05 yes — — — NRC 28/03/19 1. Installation of solar power 1. Extra depth of dugwell 2. Rehabilitation of pipelines 3. Extension pipelines 4. Construction of koisks. — —
7576 — Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe 1.5 NUWACO Water Company 27/03/21 Ligle BH 3 — 8.3675717 48.4510035 436.0 — 5 — urban yes — Yes — 9100 — — — — — 160.0 pvc 8.0 — 21.0 24.0 — 1.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 70.0 PVC 7000.0 1300 0 0 no — — Submersible Pump Lowara 30.0 60.0 Generator Parkins, Iveco 270.0 — — good — no — — — — — — Private-Public-Partnership — — — — yes 0.05 no — — — NUWACO Water Company 27/03/22 1. Rehabilitation of riser pipes — — —