Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7092 Borehole Puntland Ministry of Energy Minerals and Water 28/03/22 Bari iskushuban Kobdhexaad 0.3 Puntland MoEMW 30/03/07 Kobdhexaad borehole 10.6578856 49.4993533 467.0 1 rural yes Yes 1300 4000 360.0 pvc 8.0 220.0 20.0 4.0 Concrete/Masonry tank 40.0 Galvanised Steel 360.0 1 3 yes 4 9.0 Submersible Pump Lowara 312.0 Generator Perkins 60.0 fair Human being can not use water ftom kobdhrxaad borehole because the water is over salt. The distribution pipes are rusted. no 33.8 7.7 2920.0 1460.0 Communal yes 13/07/07 5 2 yes 0.03 yes IDB 18/08/17 1: Construction of elevated water tank 2: Construction of animal troughs. 1: Construction of another elevated water tank 2: Installation of solar power system. 3: Rehabilitation of animal water troughs. 4: Replacement of main raising pipes and submersible pump. 5: Fuel in order to access borehole function
7195 Borehole Puntland Ministry of Energy Minerals and Water 28/03/22 Nugaal garowe Xamur 0.5 UNICEF 28/03/18 Xamur BH 8.7266831 48.7464455 346.0 1 urban rural yes No Before 5 month, problem of pump and cables 700 1200 2700 306.0 pvc 8.0 6.0 Concrete/Masonry tank 80.0 PVC 700.0 3 2 no Submersible Pump Lowara 7.5 246.0 Hybrid - Solar/Generator Parkins 30.0 GPS-300-380 12.92 good no Communal yes 28/03/18 4 0 yes 0.05 yes NRC 28/02/21 1. Construction of new elevated tank 2. Installation of solar power 4. Extension of pipelines 1. Emergency 2. Borehole problem not known
7115 Dug Well Puntland Ministry of Energy Minerals and Water 28/03/22 Nugaal garowe Caano-yaskax 0.0 CEFA 28/03/07 Caano yaskax dugwell 8.837375 48.7501967 452.0 1 urban rural yes Yes 1750 250 500 2000 0 9.0 2.0 2.0 8.0 4.0 Concrete/Masonry tank 30.0 PVC 700.0 1 4 2 no Submersible Pump Sara 4.0 8.0 Solar 2.0 good yes Colorless and odorless 30.5 7.8 3150.0 1570.0 Communal yes 28/03/19 7 0 yes 0.05 yes NRC 28/03/19 1. Installation of solar power 1. Extra depth of dugwell 2. Rehabilitation of pipelines 3. Extension pipelines 4. Construction of koisks.
8460 Dug Well Puntland Ministry of Energy Minerals and Water 28/03/22 Nugaal garowe Cuun Cuun dugwell 2 8.8162779 48.8932247 465.0 2 urban yes No A months , for power problems 750 9.0 7.0 3 no No Pump poor This dugwell and its water supply needs full rehabilitation no Communal yes 15/04/07 3 2 no no 1. Rehabilitation of pipes 2. Rehabilitation of koisks 3. Replacement of pump. 4.
8339 Borehole Puntland Ministry of Energy Minerals and Water 28/03/22 Nugaal garowe Cuun 1.5 KAALO Relief and Development 28/03/19 Cuun BH 8.8277843 48.8852797 468.0 1 urban yes No From 1 a month, problem borehole with pump and riser pipes 250 110.0 pvc 8.0 11.0 60.0 8.0 1.0 Concrete/Masonry tank 25.0 Galvanised Steel 500.0 no Submersible Pump Lowara 7.5 90.0 Solar YL320P-35b 12.16 good no Communal yes 28/03/18 5 2 no no KAALO Relief and Development 28/03/19 1. Installation of solar power 1. Rehabilitation of pump and riser pipes
8165 Spring Puntland Ministry of Energy Minerals and Water 28/03/22 Bari iskushuban Ufayn sare 4.0 Community_ 22/06/12 Ufayn sare spring 10.7955108 49.6675304 692.0 1 rural urban yes Yes 4800 500 1000 4 25.0 Concrete/Masonry tank 60.0 Galvanised Steel 3000.0 1 yes 4 6.0 Submersible Pump Lowara no 31.1 8.0 750.0 375.0 Communal yes 20/06/12 2 1 no no Community_e 21/08/19 Extention of distribution pipe lines 1: extention of distribution pipe line to the village, now water does not reach to village. 2: Construction water kiosks in the village. 3: Construction of columns which holds the distribution pipe line when they crosses to the rivers, now pipes become disconnected floods occurs. 4: pipe lines as safety. 5: Construction of elevated water tank.
350 BHBRQR018 Borehole ICRC 28/03/13 Bari Qardho Simbret Koleejo BH1 9.5055 49.0919 728.0 Urban No No 1300 220.0 Community The suggested intervention is redrilling, new Generator with complete set and relevent pump with its set. that is because this BH will protect the Detainees in the prison who experienced a salty water, secondly Students in Boarding school will support, t Water Sources Data from Partners – WSD_Pat
7103 Borehole Puntland Ministry of Energy Minerals and Water 28/02/22 Mudug jariban Gocosaale Community 28/04/21 Gocosaale BH 6.8633508 49.0177023 26.0 1 rural yes Yes 500 1000 70 5000 0 180.0 pvc 8.0 8.0 24.0 2.0 Concrete/Masonry tank 50.0 Galvanised Steel 150.0 2 4 yes 20 8.0 Submersible Pump 11.0 150.0 Generator Parkins 30.0 poor Under construction yes Colorless and odorless 32.0 7.41 728.0 362.0 Communal no yes 0.05 yes 1. Fancing of borehole 2. Pump rehabilitation 3. Construction of generator room 4. Installation of solar power 5. Water committees training. 6. Operation tools.
7785 Borehole Puntland Ministry of Energy Minerals and Water 28/02/22 Mudug jariban Garacad 1 0.5 CARE Somalia 28/02/06 Garacad BH 1 6.9437939 49.3254529 -22.0 3 urban yes Yes 15000 7.0 pvc 8.0 2.0 5.0 2.0 Concrete/Masonry tank 13.0 Galvanised Steel 1500.0 134 0 no Submersible Pump 1.5 5.0 Solar poor Because of more saline in water, the water supply corrosion than destroyed yes Very saline water 29.1 7.8 7240.0 4850.0 Utility/Local Authority no no 1.Drilling new borehole far away for this borehole because this borehole so saline 2. Rehabilitation and reconstruction all water supply.
7906 Dug Well Puntland Ministry of Energy Minerals and Water 28/02/22 Bari bandar_beyla Bixin 0.4 Community_ 20/03/10 Bixin dug well 9.0879912 50.4303314 145.0 1 rural urban yes Yes 3000 500 3500 4.0 8.0 Concrete/Masonry tank 6.0 Galvanised Steel 450.0 2 7 1 yes 3 7.0 Submersible Pump Lowara 7.0 Solar 3.0 fair The yield of the dug well is very low. no 31.0 7.2 2500.0 1250.0 Communal yes 10/01/20 3 2 no no CARE Somalia 26/02/20 Construction of Kiosks and water tank and pipeline distribution. Solar&Generator. Digging deeper of the dug well in order to increase yield of dug well. Extension of pipelines Rehabilitation of kiosks and building more kiosks. New dug well. Elevated water tank for agricultural use