Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7161 Borehole Puntland Ministry of Energy Minerals and Water March 22, 2022 Bari iskushuban Dawacaaley 2.0 Save the children 01/01/20 Dawacaaley borehole 10.5667937 50.0366927 387.0 1 rural urban yes No 15 March 2021 The main raising pipes are rusted and the pump stopped working. 5000 20000 40000 275.0 pvc 8.0 8.0 Concrete/Masonry tank 40.0 PVC 2200.0 40 2 2 yes 10 8.0 Submersible Pump Hybrid - Solar/Generator Perkins 45.0 BR-M300 22.8 poor 1.The pump stopped working 2.the main raising pipes need changing they were inside the borehole for more than two years and they are rusted. 3.The plastic pipes that supplies the village are broken and wasting the water. no Communal no yes 0.05 yes No intervention was carried out since the borehole started working. 1. Immediate change (Rehabilitation) of main raising pipes and the submersible pump. 2.full pipeline Rehabilitation 3. Another water tank 4. 3 more kiosks 5. 2 more troughs 6. Control valves (supply stations). 7. Storage room
7067 Borehole Puntland Ministry of Energy Minerals and Water March 22, 2022 Bari iskushuban Moqor 1.0 ICRC 01/01/13 Moqor borehole 10.6593991 49.9420605 497.0 1 rural urban yes Yes 2000 1000 3000 304.0 pvc 8.0 260.0 3.0 6.0 2.0 Concrete/Masonry tank 18.0 Galvanised Steel 1000.0 4 2 no Submersible Pump 290.0 Generator Perkins 33.0 good The condition of supply system is Good but the yield is very low 1.Due to low yield of the borehole the kiosks don''t function 2. Due to the low yield the demand is too much. no 28.3 7.7 888.0 443.0 Communal no yes 0.1 yes Puntland MoEMW 01/01/18 Changed the submersible pump 1.Solar 2. Large capacity water tank 3.Fencing 4. Replacement of main raising pipes 5. Replacement of submersible pump. 6. More troughs. 7. Care taker room. 8. Currently they Need Water trucking. 9.A high yeild borehole.
8663 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Tuulo ciise 0.6 Community_ 15/02/22 Tuulo ciise borehole 10.4278199 50.1535221 335.0 1 yes No The source has a potential high yield and its a new borehole and doesn't have the equipment to function and also there is no water tank. 127.0 8.0 50.0 64.0 poor No storage no pipelines no Communal 1. Immediate complete equipment. A. GI pipes, submersible pump, power source and elevated water tank and caretaker room and storage room.
7200 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Timirshe 0.1 Former Somali Government 21/12/86 Timirshe borehole 1 10.5612376 50.42519 272.0 2 rural urban yes Yes 6000 300 4500 90.0 pvc 10.0 45.0 7.5 19.0 3.0 Concrete/Masonry tank 44.0 Galvanised Steel 50 3 2 yes 6 6.0 Submersible Pump Lowara 74.0 Hybrid - Solar/Generator Perkins 45.0 fair Yield is low Pipes are rusted. no 28.5 7.74 1732.0 868.0 Communal yes 21/07/15 4 3 yes 0.03 yes Save the children 19/11/17 Installation of solar power system. 1: Replacement of main raising pipes and submersible pump immediately. 2: Replacement of rusted iron pipes 3: Extention of water supply pipe lines 4: construction of another kiosks
7537 Dug Well Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Gargoore 0.1 Community_ 10/01/12 Gargoore duggwell 10.4938131 50.6961789 66.0 3 urban yes Yes 2000 6.0 3.0 2.0 6.0 Concrete/Masonry tank 6.0 Galvanised Steel 1200.0 30 6 no Submersible Pump Lowara 6.0 Solar fair Yield is very low. The tank is small. The rate of solar is low. no 28.0 7.8 1094.0 547.0 Communal yes 21/07/19 2 3 yes 0.05 no CARE Somalia 24/11/19 Replacement of distribution pipe line. Construction of 6 kiosks. Generator Pump. Construction of elevated water tank. Increasing of solar panels. Construction of caretaker room.
7292 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Taageer 4.0 Red Crescent Society for United Arab Emirates 06/06/07 Taageer Borehole 10.9658347 50.9198765 131.0 1 rural urban yes Yes 6000 400 7000 168.0 gi 8.0 122.0 11.0 10.0 Concrete/Masonry tank 34.0 Galvanised Steel 4000.0 20 5 4 yes 4 6.0 Submersible Pump Lowara 156.0 Hybrid - Solar/Generator 3 Perkins Generator,50+45+45 kva 140.0 17.5 poor 1.Main raising pipes are old and rusted, and need changing immediately. 2. Pipelines are leaking. 3.Generators are not working. 4. no 28.2 7.5 652.0 326.0 Communal no yes 0.1 yes CARE Somalia 02/05/17 Changed main raising pipes. 1. Immediate Replacement of main raising pipes and the submersible pump. 2. 1Km Pipeline extension and changing of the rusted pipes. 3. Rehabilitation of the generators, 4. Construction of more Kiosks and another elevated water tank due to the settlement expansion.
7203 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Dhumoodle Community_ 01/01/22 Dhuumoodle 2 10.473564 50.4206004 285.0 2 rural urban yes Yes 9000 16000 30000 3.0 100.0 pvc 8.0 25.0 72.0 24.0 Concrete/Masonry tank 300.0 Galvanised Steel 500.0 0 0 yes 48 8.0 Submersible Pump Luwara 60.0 Generator Perkins 50.0 poor 1.No Generator of its own it shares a Generator with the dhumoodle 1 2. Its a ground masonry tank, and its leaking no 28.3 7.5 2300.0 1140.0 Communal yes 0.025 yes 1. Power source, Generator and solar with battery storage. 2. Large capacity of water tank 3. Main raising pipes and submersible pump. N.B *immediate full intervention and complete equipment.
7201 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Timirshe 0.15 Community_ 21/05/00 Timirshe borehole 2 10.5613413 50.4252462 270.0 2 rural urban yes Yes 480 200 400 84.0 pvc 8.0 40.0 3.0 12.0 Concrete/Masonry tank 40.0 Galvanised Steel 20 6 3 yes 3 6.0 Submersible Pump Lowara 63.0 Solar fair Yield is low. no 31.0 7.7 1732.0 860.0 Communal yes 21/07/15 4 3 yes 0.03 yes CARE Somalia 01/02/22 Replacement of main raising pipes and submersible pump 1: Generator 2: Rehabilitation of solar power system.
7185 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Dhuumoodle 2.0 Community_ 21/03/15 Dhuumoodle 1 10.4797765 50.4141208 284.0 2 rural urban yes Yes 9000 16000 30000 3.0 120.0 pvc 8.0 40.0 56.0 24.0 Concrete/Masonry tank 40.0 PVC 500.0 1 2 yes 48 8.0 Submersible Pump Luwara 70.0 Hybrid - Solar/Generator Perkins 50.0 21.6 poor 1.Main raising pipes are rusted and leaking 2.the elevated water tank is not enough 3.Generator is malfunctioning 4.solar system are too weak to generate enough power no 28.3 7.75 2370.0 1180.0 Private/Individual yes 0.05 yes CARE Somalia 01/01/19 Elevated water tank and troughs 1. Immediate change of main raising pipes and the submersible pump before it stops functioning and get cut-off. 2.Solar-power with battery storage and Generator 3. A Larger capacity of water tank 4. 3 more troughs
8120 Borehole Puntland Ministry of Energy Minerals and Water March 20, 2022 Bari iskushuban Baargaal 1.0 Community_ 18/02/21 Baargal borehole 2 11.2846495 51.0714189 30.0 2 rural urban yes Yes 24.0 pvc 8.0 15.0 12.0 Submersible Pump Lowara 18.0 fair No storage water tank No distribution pipe line The bore hole is new and has no water structures. no 27.9 7.8 1077.0 533.0 Communal yes 21/08/93 7 0 No intervention is performed because the borehole is new. 1: Elevated water tank 2: Distribution pipe line. 3: Installation of solar power system.