Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8305 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Xaar-xaar 0.8 ISRC 16/03/18 Xaar-xaar BH 7.7855921 47.9840695 475.0 1 urban rural no 2 Abandoned Since 2019, by borehole problem and depletion of yield. 4200 430.0 pvc 8.0 3.0 Concrete/Masonry tank 36.0 Galvanised Steel 2000.0 5 2 no Submersible Pump Lowara 18.0 335.0 Hybrid - Solar/Generator Parkins 60.0 Yl_300p-35b 28.8 poor no Communal yes 16/03/17 6 1 no no NRC 16/03/21 1. Rehabilitation of pump and cables. 1. Emergency
7091 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Jalam 0.7 ISRC 16/03/18 Jalam BH 7.8375586 48.0107914 557.0 1 urban rural yes Yes 4000 1500 0 2500 400.0 pvc 8.0 9.0 16.0 3.0 Concrete/Masonry tank 24.0 Galvanised Steel 50.0 1 2 yes 16 8.0 Submersible Pump Lowara 15.0 360.0 Hybrid - Solar/Generator Parkins 60.0 SZYL-M330-36 23.1 fair yes Colorless and odorless 34.1 6.8 5405.0 2708.0 Communal no yes 0.05 yes Agency not specified 16/03/16 1. Installation of solar power 1. Rehabilitation of pump. 2. Rehabilitation of generator. 3. Construction of koisks.
7527 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Mudug galkayo Ballanbal 1.5 Charity 16/03/18 Ballanbal BH 7.4375285 48.140286 427.0 1 rural urban yes Yes 3500 300 1500 0.0 354.0 pvc 8.0 9.0 12.0 3.0 Concrete/Masonry tank 44.0 Galvanised Steel 50.0 1 2 yes 10 8.0 Submersible Pump Lowara 18.5 339.0 Hybrid - Solar/Generator Parkins 100.0 GPS-300-360 37.8 poor Shortage of koisks and pipelines yes Turbidity greater than 10, colorness 33.8 7.51 2050.0 1015.0 Communal no yes 0.05 no 1. Rehabilitation of generator. 2. Rehabilitation of pump and riser pipes. 3. Installation of solar power 4. Construction of koisks. And extension of pipelines. 5. Fuel supporting. 6. Operator supporting.
7432 Spring Puntland Ministry of Energy Minerals and Water March 16, 2022 Bari iskushuban Foocaar 7.0 UNICEF 21/09/05 Lodhuda spring 10.3309356 50.8652081 10.0 4 urban rural yes Yes 1500 200 1000 0.5 Concrete/Masonry tank 10.0 Galvanised Steel no poor The yield is low. No submersible pump, solar power installation and generator. no 29.6 7.6 1740.0 875.0 Communal no yes 0.1 no Puntland MoEMW 24/10/19 Replacement of distribution pipe lines. 1: To asset a way of increasing the yield of water, or provide another way of water sources. 2: Distribution pipe line and its accessories such as valves, tee, elbow, couple. 3: Construction of a dug well or distribution of water from another spring which is far from the village to 10 kilometer, due to water demand 5: Construction of elevated water tank and kiosks.
7526 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Burtinle 0.8 MAWASU 16/03/15 Hanad 1 7.6383332 47.8092241 476.0 3 urban yes Yes 22400 430.0 pvc 8.0 15.0 20.0 3.0 Concrete/Masonry tank 350.0 PVC 3000.0 3200 yes 10 8.0 Submersible Pump Lowara 26.5 322.0 Hybrid - Solar/Generator Parkins 100.0 GPS-300-360 37.8 fair yes Colorless and odorless 33.8 7.51 2050.0 1373.5 Private-Public-Partnership yes 0.05 no KAALO Relief and Development 16/01/20 1. Installation of solar power. 1. Construction of new elevated tank 2. Rehabilitation of pump and riser pipes 3. Construction of animal troughts. 4. Rehabilitation of generator
7539 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Burtinle 1.5 16/03/07 Ceel weyne burtinle BH 7.6233361 47.8358061 414.0 1 urban rural yes No Because of generator less than month 1000 800 1500 375.0 pvc 8.0 18.0 2.0 Concrete/Masonry tank 26.0 Galvanised Steel 50.0 1 1 yes Submersible Pump Lowara 15.0 332.0 Generator Parkins 45.0 poor Strong rehabilitation needed no Private/Individual yes 0.05 no 1. Emergency ( absolutely needed strong rehabilitation). 2. Rehabilitation of generator 3. Rehabilitation of pipes and pump. 4. Fancing. 5. Construction of animal troughts 6. Fuel supporting. 7. Installation of solar power.
8768 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Burtinle 0.5 World Vision Burtinle BH 5 7.6277806 47.8278065 414.0 5 urban no 12 Abandoned Ayeays, by Unknown problem. no
7400 Spring Puntland Ministry of Energy Minerals and Water March 16, 2022 Bari iskushuban Baar madoobe 3.0 Community 18/08/14 Qansax spring. 10.0566885 50.8887453 -34.0 1 urban yes Yes 600 1.0 Concrete/Masonry tank 12.0 PVC no poor The yield is very low. The diameter of distribution pipe line is very low. No kiosks. No elevated water tank. no 27.9 8.9 2590.0 1296.0 Private/Individual yes 0.2 Community 18/06/13 Placement of 0.5 diameter PVC distribution pipe line. 1: Construction of storage water tank. 2: Digging the deep of the spring in order to increase yield. 3: Pipe lines. 4: emergency water trucking. 5: Construction of another borehole
7525 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Burtinle 1.5 UNICEF 16/03/20 Hanad BH 3 7.646383 47.8075501 483.0 3 urban yes Yes 22000 408.0 pvc 8.0 244.0 12.0 18.0 69.0 3.0 Concrete/Masonry tank 375.0 PVC 2500.0 3500 0 0 yes 8 8.0 Submersible Pump Lowara 22.0 360.0 Hybrid - Solar/Generator Parkins 65.0 BYD400MIK-36 43.2 good yes Colorless and odorless 36.2 7.32 2380.0 1205.0 Private-Public-Partnership yes 0.05 no 27/03/21 1. Installation of solar power 1. Fencing around borehole
7132 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Burtinle World Vision 16/03/12 Burtinle BH hanad 2 7.6404808 47.8134757 442.0 3 rural urban yes Yes 20000 5000 500 2000 0.0 420.0 pvc 8.0 12.0 20.0 3.3 Concrete/Masonry tank 375.0 PVC 5000.0 3200 2 yes 10 8.0 Submersible Pump Lowara 22.0 322.0 Generator Parkins 65.0 fair Needs rehabilitation of animal troughts yes Colorless and odorless 31.5 7.8 2200.0 1474.0 Private-Public-Partnership yes 0.05 yes 1. Rehabilitation of pump and riser pipes 2. Rehabilitation of cables.