Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8120 — Borehole Puntland Ministry of Energy Minerals and Water March 20, 2022 Bari iskushuban Baargaal 1.0 Community_ 18/02/21 Baargal borehole 2 — 11.2846495 51.0714189 30.0 — 2 — rural urban yes — Yes — — — — — — — 24.0 pvc 8.0 15.0 12.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Submersible Pump Lowara — 18.0 — — — — — fair No storage water tank No distribution pipe line The bore hole is new and has no water structures. no — 27.9 7.8 1077.0 533.0 — Communal yes 21/08/93 7 0 — — — — — — — — No intervention is performed because the borehole is new. 1: Elevated water tank 2: Distribution pipe line. 3: Installation of solar power system. — —
7405 — Dug Well Puntland Ministry of Energy Minerals and Water March 20, 2022 Bari iskushuban Cadayo 0.5 IR 20/06/21 Cadayo dug well — 11.003073 51.0976064 -50.0 — 1 — rural urban yes — Yes — 360 600 — 2000 0.25 — — — — — — — — — 8.0 7.0 6.0 6.0 — — — — — — — — — — — — — Concrete/Masonry tank 36.0 PVC 600.0 — 3 2 yes 7 6.0 Submersible Pump Lowara — 8.0 Hybrid - Solar/Generator Kama — — — fair The yield of dug well is low. The water demand of the village and surrounding area is very high. no — 28.0 7.9 1699.0 849.0 — Communal yes 20/12/21 3 2 yes 0.2 no — — — IR 20/11/21 Installation of solar power system. 1: Replacement of main raising pipes. 2: electric cable 3: Construction of dug well cover protection. 4: Construction of another 3 kiosks in the village. 5: Construction of caretaker room and toilet. — —
7403 — Dug Well Puntland Ministry of Energy Minerals and Water March 20, 2022 Bari iskushuban Waadi khayr 0.1 Community_ 20/03/91 Waadi khayr dug well — 11.128186 51.0563147 -26.0 — 1 — urban rural yes — Yes — 900 500 — 1000 — — — — — — — — — — 8.0 6.0 4.0 4.0 — — — — — — — — — — — — — Concrete/Masonry tank 8.0 PVC — 15 6 2 yes 3 2.0 Submersible Pump Lowara — 7.0 Hybrid - Solar/Generator Diesel generator — — — fair There is no good yield. The elevated water tank is very ismall no — 27.8 8.0 1857.0 928.0 — Communal yes 21/09/19 3 2 yes 0.2 no — — — CARE Somalia 20/10/21 Installation of solar power system. Installation of pump and raising pipes. Construction 6 kiosks and it''s distribution pipe line. Construction of generator room Construction of another kiosks in the village Digging the deep of the well in order to increase the yield Construction of another elevated water tank — —
7538 — Borehole Puntland Ministry of Energy Minerals and Water March 20, 2022 Bari iskushuban Baargaal 1.0 Former Somali Government 21/05/86 Bargaal borehole 1 — 11.2839238 51.0707089 -28.0 — 2 — rural urban yes — Yes — 6000 200 — 3500 — — 24.0 gi 8.0 15.0 8.0 14.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 40.0 PVC — 400 2 2 yes 4 3.0 Submersible Pump Lowara — 17.0 Hybrid - Solar/Generator Perkins 66.0 GPS-300-380 — fair There is no good yield. The power of solar is very low. no — 31.1 7.8 1077.0 533.0 — Communal yes 21/08/93 7 0 yes 0.05 no — — — NRC 09/10/21 1: Installation of solar power system. 2: Replacement of submersible pump, main raising pipes, and some distribution pipe lines. 3: Construction of caretaker room. 4: Rehabilitation of elevated water tank. 1: Generator. 2: extension of distribution pipe line in order to supply water to the city. 3: Construction generator room and toilet. 4: Fuel. — —
7425 — Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Xaafuun 6.0 Community_ 19/09/05 Mutakiini 1 — 10.4381589 51.2515067 -18.0 — 3 — rural urban yes — Yes — 1500 200 — 2000 — — — — — — — — — — 11.0 10.0 0.5 6.0 — — — — — — — — — — — — — Concrete/Masonry tank 18.0 PVC — 4 8 — no — — Submersible Pump Lowara — 10.0 Hybrid - Solar/Generator FG wilson 33.0 JCNS-M36V360W 2.16 poor The yield is very low. Both dug well distribute water to 1 elevated water tank. no — 27.8 9.0 3250.0 1624.0 — Communal yes — 4 3 yes 0.1 no — — — Puntland MoEMW 20/08/12 1: Installation of solar power system. 2: Supplied generator 1: Replacement of main raising pipes and submersible pump. 2: Digging the deep of the well in order to increase yield. 3: Construction of animal troughs. — —
7648 — Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Gumbax 0.25 CARE Somalia 22/02/13 Gumbax dug well — 10.8849252 51.1128905 -40.0 — 4 — rural urban yes — Yes — 1080 — — — — — — — — — — — — — 3.0 2.0 0.5 8.0 — — — — — — — — — — — — — Concrete/Masonry tank 6.0 PVC 300.0 48 4 1 no — — Submersible Pump Lowara — 3.0 Hybrid - Solar/Generator KAMA — — — poor Yield is very low. no — 28.0 7.75 4140.0 2070.0 — Communal yes 21/09/19 3 2 yes 0.02 no — — — CARE Somalia 23/01/21 1: Installation of solar power system. 2: Installation of submersible pump and raising pipes. 3: Rehabilitation of generator room. 4: Generator. 1: Sub surface dam. 2: Construction of water kiosks. 3: Construction of another elevated water tank due to demand of society. — —
7095 — Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Xandha 0.2 Shilcon 22/07/04 Xandha dug well — 10.6524476 51.1366167 -27.0 — 1 — rural urban yes — Yes — 3600 3000 — 7000 — — — — — — — — — — 3.0 2.5 3.5 12.0 — — — — — — — — — — — — — Concrete/Masonry tank 20.0 Galvanised Steel 500.0 4 4 3 yes 4 — Submersible Pump Lowara — 3.0 Hybrid - Solar/Generator KAMA — — — poor The yield is low. The community that depend on are too much. The livestock that depend on are too much. no — 33.5 8.3 1200.0 600.0 — Communal yes 19/06/04 4 3 yes 0.3 yes — — — CARE Somalia 24/11/19 1: Pipe line distribution. 2: Construction 3 kiosks and caretaker room and generator room. 3: Rehabilitation of water tank. 4: Supplied Generator 5: Installation of solar power system. 6: Construction of top cover protection of dug well. 1: Replacement of rusted iron pipes. 2: Replacement of submersible pump. 3: Construction of another elevated water tank. 4: Construction of remaining wall which protect the cover of the dug well. 5: Construction of another kiosks. — —
8189 — Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Gumbax 0.5 Community_ 24/05/19 Xaajiyada dug well — 10.8843349 51.1113377 -61.0 — 4 — rural urban yes — Yes — 1800 — — 200 — — — — — — — — — — 3.0 2.0 — — — — — — — — — — — — — — — — — — — — — — yes 6 6.0 — — — — — — — — — fair No storage tank No water kiosks. No distribution pipe lines no — 28.2 8.1 508.0 254.0 — Communal yes 19/06/20 3 2 no — no — — — Community_e 25/08/20 Cleaning the site of the dugwell Construction of animal water troughs. — —
7426 — Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Xaafun 6.0 Save the children 22/06/15 Matakiini 2 — 10.4353928 51.2490906 -37.0 — 3 — rural urban yes — Yes — 1500 200 — 2500 — — — — — — — — — — 8.0 7.0 1.0 6.0 — — — — — — — — — — — — — Concrete/Masonry tank 18.0 PVC — 4 8 1 no — — Submersible Pump Lowara — 8.0 Solar — — HE305-72P 4.27 poor The yield is very low. Xaafun have two dug well, both they distribute water to 1 elevated water tank. The water tank distribute water to the kiosks in the village and animal troughs. no — 27.8 9.0 3250.0 1624.0 — Communal yes 18/07/21 4 3 yes 0.1 no — — — CARE Somalia 17/02/22 1: Installation of solar power system. 2: Supplied submersible pump. 3: Rehabilation of elevated water tank in order to stop water leaking. 4: Rehabilitation of caretaker room 1: Construction of another borehole. 2: Generator. 3: animal troughs. 4: Distribution pipe lines. 5: Construction of 4 kiosks in the school. — —
8070 — Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Xaafun 3.0 Gift of governance 20/12/06 Afdicin dug well — 10.4558954 51.2722594 -6.0 — 3 — rural urban yes — Yes — 300 150 — 500 — — — — — — — — — — 12.0 10.0 4.0 — — — — — — — — — — — — — — — — — — — — — yes 4 6.0 — — — — — — — — — poor No sufficient yield. No submersible pump. No solar power and generator. No raising pipe line and distribution pipe line no — 31.3 7.7 1320.0 660.0 — — — — — — no — no — — — Community_e 20/11/20 Cleaning of the site which the dug well is located. 1: Digging the deep of well in order to increase yield. 2: installation of raising pipes and submersible pump. 3: Construction of elevated water tank. 4: Installation of solar power system. — —