Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8366 — Borehole Puntland Ministry of Energy Minerals and Water March 14, 2022 Mudug galkayo Ceelgardi 0.5 — 24/03/19 Ceelgardi BH 1 — 7.261886 47.572429 337.0 — 1 — urban rural no 4 No For a months, Unknown problem 3000 600 — 1000 0.0 — 225.0 pvc 8.0 — 7.5 — — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 44.0 Galvanised Steel 40.0 — 5 2 yes 20 8.0 Submersible Pump Lowara — 11.0 Hybrid - Solar/Generator Parkins 30.0 — 32.4 fair — no — — — — — — Communal yes 24/03/19 7 4 no — no — — — CARE Somalia 24/03/22 1. Construction of new elevated tank 2. Extension of pipelines 3. Construction of new kiosks 4. Rehabilitation of pump and riser pipes 1. Construction of latrine. — —
7249 — Borehole Puntland Ministry of Energy Minerals and Water March 14, 2022 Mudug galkayo Margaaga — ISRC 14/03/09 Margaaga BH — 7.2191715 47.5372463 344.0 — 1 — urban rural yes — Yes — 7448 50 — 2000 — — 194.0 pvc 8.0 80.0 8.0 12.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 31.0 PVC 3000.0 200 8 1 no — — Submersible Pump Lowara 7.5 162.0 Hybrid - Solar/Generator Parkins 30.0 BR-M300W 15.0 good — yes Colorless and odorless 33.5 7.35 3405.0 1698.0 — Communal yes 14/03/12 3 4 yes 0.05 yes — — — NRC 14/02/21 1. Construction of new elevated tank. 1. Installation of pump 2. Construction animal troughts 3. Fancing 4. Fuel supporting — —
7941 — Borehole Puntland Ministry of Energy Minerals and Water March 14, 2022 Mudug galkayo Bacaadweyn 0.3 Bacaadweyn water company 14/03/19 Bacaadweyn water company BH 2 — 7.1840294 47.5360031 344.0 — 2 — urban yes — No A years, Because of lack of water supply. — — — — — — 210.0 pvc 8.0 — 22.0 — — 2.4 — — — — — — — — — — — — — — — — — — — — — — — — no — — Submersible Pump — 22.0 180.0 — — — — — poor There is no any water supply no — 30.2 7.6 2261.0 1133.0 — Utility/Local Authority — — — — no — no — — — — — — 1. Emergency 2. Construction of new elevated tank 3. Installation of generator and solar power 4. Extension of pipelines. 5. Construction of caretaker and Generator rooms. — —
8315 — Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Afar iridood — UNICEF 13/02/21 Afar iridood BH — 6.9935791 47.3739121 312.0 — 1 — rural urban yes — No 1 month not functioning, needs observation of borehole 1260 — — — — — 180.0 pvc 8.0 — 12.0 — — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 24.0 Galvanised Steel 50.0 — 2 2 no — — Submersible Pump Lowara 11.0 135.0 Generator CEOLMO 30.0 — — poor Shortage of water supply. And borehole problemed. no — — — — — — Communal yes 13/02/21 4 2 no — no — — — — — — 1. Emergency to solve this problem 2. Needs camera to observation borehole problem. — —
7691 — Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Bari iskushuban Jeedal 2.0 UNICEF 19/02/22 Jeedal borehole — 10.2112917 49.5234167 647.0 — 1 — rural urban yes — Yes — — — — — — — 260.0 pvc 8.0 — 14.0 — — — — — — — — — — — — — — — — — — — — — — — — — — — yes 25 8.0 Submersible Pump Lowara — 276.0 Generator Perkins 45.0 — — fair No elevated water tank No animal troughs. No water points. no — 33.0 8.2 1350.0 680.0 — Communal no — — — yes 0.015 — — — — — — No intervention is performed, because the borehole is newer This borehole is under construction, elevated water tank, troughs and the care taker room is to be constructed soon. Despite that they need the flowing intervention:- 1: Installation of solar power system,due to the increased fuel prices. 2: Water tank for the town supply. 3: Distribution pipes and kiosks for the settlement. — —
7253 — Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Cagaaran — WDA 13/03/91 Cagaaran BH 1 — 7.0618805 47.4853827 279.0 — 3 — rural urban yes — Yes — 17500 9000 100 15000 — — 195.0 pvc 8.0 105.0 18.0 12.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 160.0 Galvanised Steel 2000.0 330 7 3 yes 6 8.0 Submersible Pump — 16.0 150.0 Hybrid - Solar/Generator IM30 30.0 GPS-300-360 16.2 fair Pipelines rehabilitation yes Colorless and odorless 35.5 8.1 2543.0 1261.0 — Communal yes 13/03/90 7 0 yes 0.1 yes — — — DRC 13/02/21 1. Installation of solar power 1. Rehabilitation of pump and riser pipes. 2. Rehabilitation of pipelines. 3. Extension of pipelines. 4. Rehabilitation and reconstruction of elevated water tank. 5. Construction of new kiosks. 6. Fancing. — —
7227 — Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Daarasalaam — Community 13/03/02 Daarasalaam BH — 7.0814702 47.4922321 315.0 — 1 — rural urban yes — Yes — 3500 450 — 1500 0.0 — 170.0 pvc 8.0 56.0 16.6 12.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 50.0 PVC 1500.0 250 5 2 yes 2 8.0 Submersible Pump Lowara 11.0 108.0 Hybrid - Solar/Generator Parkins 45.0 DS572380M 16.72 good — yes Colorless and odorless 32.6 7.71 2470.0 1225.0 — Communal yes 13/03/02 3 0 yes 0.05 yes — — — NRC 13/02/21 1. Construction of new elevated tank 2. Construction of koisks 1. Extension pipelines 2. Extension of solar power — —
7943 — Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Cagaaran — Save the children 13/02/21 Cagaraan BH — 7.0347377 47.4901695 284.0 — 2 — urban rural yes — Yes — 700 — — — — — 180.0 pvc 8.0 95.0 25.0 12.0 — 1.4 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 50.0 PVC 2500.0 — 4 2 yes 7 8.0 Submersible Pump — 11.0 160.0 Hybrid - Solar/Generator Parkins 45.0 PV800-4T30G 30.0 good — yes Colorless and odorless 35.2 8.05 2235.0 1115.0 — Communal yes 13/03/21 3 — no — no — — — Save the children 13/01/21 1 . Installation of solar power Fuel supporting. Rehabilitation pipelines — —
7873 — Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Fardaharis — ICNA 13/03/21 Fardaharis BH — 7.0487097 47.4276759 303.0 — 1 — rural urban yes — Yes — 500 250 — 800 — — 160.0 pvc 8.0 — 15.0 8.0 — 1.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 30.0 Galvanised Steel 50.0 — 1 2 no — — Submersible Pump — 11.0 105.0 Hybrid - Solar/Generator Leateck 30.0 AS-60-28W 16.8 fair Shortage of koisks yes Colorless and odorless 30.8 7.8 2831.0 1409.0 — Communal yes 13/03/21 6 0 no — no — — — ICNA 13/03/21 1. Installation of solar power. 1. Construction of koisks 2. Extension of pipelines 4. Rehabilitation generator. 5. Fancing. 6. Construction of animal troughts. — —
7215 — Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Horkac cagaaran 1.3 Community 13/03/17 Horkac BH — 7.0533552 47.5178086 301.0 — 1 — urban rural yes — Yes — 100 200 — 800 5.0 — 226.0 pvc 8.0 — 12.5 5.0 — 0.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 18.0 Galvanised Steel 500.0 — 1 2 no — — Submersible Pump Lowara 15.0 135.0 Generator Parkins 30.0 — — fair — yes Colorless and odorless 31.5 7.91 2535.0 1257.0 — Communal yes 14/03/17 3 0 no — yes — — — World Bank 13/02/21 1. Construction of animal troughts 2. Construction of one koisk. 3. Rehabilitation of generator room 4. Installation of generator and pump. 1. Installation of solar power. 2. Construction of new kiosks. 3. Construction caretaker room. — —