Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7068 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari bossaso Carta 0.5 Kuwait Government 14/08/13 Carta borehole — 10.4914185 49.0775361 656.0 — 1 — rural urban yes — Yes — 1200 — — — — — 190.0 pvc 8.0 — 10.0 5.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 18.0 Galvanised Steel 150.0 45 3 2 no — — Submersible Pump Lowara — 111.0 Hybrid - Solar/Generator DEUTZ Perkins 30.0 CSP300 24.0 fair No good yield The water is dissolved some salt no — 26.7 7.45 2740.0 1365.0 — Communal yes 13/09/19 3 2 yes 0.02 yes — — — CARE Somalia 09/02/19 Construction of the roof of the caretaker room and generator room. Replacement of rusted distribution pipe lines Rehabilitation of elevated water tank. Replacement of main raising pipes and submersible pump. Construction elevated water tank. Construction of animal troughs which located out of the village. Complete water supply system.around the village. — —
7184 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Kalabayr 0.2 Community 19/03/11 Kalabayr BH — 7.1906848 47.2928613 355.0 — 1 — urban rural yes — Yes — 980 1650 — 2500 0.0 — 230.0 pvc 8.0 — 11.5 12.0 — 4.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 56.0 Galvanised Steel 1500.0 20 1 2 yes 7 8.0 Submersible Pump Lowara 15.0 216.0 Hybrid - Solar/Generator Parkins 45.0 GCNS_M36V390W 15.99 good — yes Colorless and odorless 29.3 7.62 2550.0 1245.0 — Communal yes 19/03/12 5 0 yes 0.05 yes — — — NRC 12/01/21 1. Installation of solar power 2. Rehabilitation of koisks 3. Rehabilitation of pump and riser pipes 1. Fancing. 2. Rehabilitation of koisks and construction new koisks. 3. Rehabilitation of animal troughts. 4. Rehabilitation rooms. 5. Fuel supporting. — —
7183 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Laandheere 0.3 Community 12/03/13 Laandheere BH — 7.1810792 47.3584385 350.0 — 1 — urban rural yes — Yes — 910 300 — 2500 0.0 — 180.0 pvc 8.0 — 10.0 10.0 — 3.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 13.0 Stainless Steel 500.0 7 4 2 yes 3 8.0 Submersible Pump — 15.0 145.0 Hybrid - Solar/Generator IVECO 30.0 GD100_01G_4_PV 18.5 fair — yes Colorless and odorless 29.3 7.72 2835.0 1405.0 — Communal no — — — yes 0.05 yes — — — NRC 12/02/21 1. Rehabilitation of pipes, koisks and animal throughts 2. Installation of solar power. 1.Construction of new elevated tank 2. Fancing of borehole. — —
7204 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari qardho Carmo 3.0 Horseed water company 12/07/19 Carmo borehole 3 — 10.5711623 49.0842369 644.0 — 5 — rural urban yes — Yes — 1800 100 — 700 — — 240.0 pvc 8.0 180.0 10.0 12.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 426.0 PVC — 300 — — no — — Submersible Pump Lowara — 234.0 Generator Perkins 45.0 — — good But the water is over salt. The borehole distribute water to the village so it is difficult to determine length of pipe line. yes Yellow color. Water is over salt. 26.7 7.28 4050.0 2020.0 — Private-Public-Partnership — — — — yes 0.02 yes — — — Horseed water company 16/07/20 Cleaning of the borehole site. Installation of solar power system. Fencing. — —
7250 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug galkayo Roox — Community 12/03/16 Roox BH — 7.2052439 47.4384682 341.0 — 2 — rural urban yes — Yes — 4200 1500 — 2500 — — 180.0 pvc 8.0 — 13.3 15.0 — 3.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 20.0 Galvanised Steel 1300.0 30 6 2 yes 2 8.0 Submersible Pump Lowara 11.0 150.0 Hybrid - Solar/Generator Doss 30.0 — 19.6 fair — yes Colorless and odorless 34.5 7.61 2350.0 1171.0 — Communal yes 12/03/16 5 2 yes 0.05 yes — — — NRC 12/03/20 1. Installation of solar power. 2. Rehabilitation of pump. 1. Construction of new elevated tank and rehabilitation of generator. 2. Extension pump capacity. 3. Extension pipelines 4. Room caretaker room. — —
7218 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari qardho Juurile 1.5 Former Somali Government 16/11/86 Juurile borehole — 10.3962938 49.0667047 682.0 — 2 — rural urban yes — Yes — 1200 1500 — 5000 0.5 — 126.0 gi 6.0 117.0 10.0 12.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 120.0 Galvanised Steel 1700.0 — 8 2 yes 5 8.0 Submersible Pump Grundfos — 126.0 Hybrid - Solar/Generator IVECO 32.0 SZYL-P325-36 24.7 poor The borehole has 3 water storage. two elevated water tank in the village and other one is located at the borehole site. The capacity of three tanks is 120 meter cubic. The pipe line connection b/n the village and borehole is been destroyed by floods. And the village has no water supply. Fetching water from the borehole is difficult due to the crossing of buran stream, which is very large and sand. no — 26.6 8.06 1740.0 865.0 — Communal yes 17/09/16 7 8 no — yes — — — NRC 13/11/18 Installation of solar power system. Replacement of main raising pipes and submersible pump. Construction of two toilets. Widening of animal troughs. 1: Placement of pipe lines which distribute water to the village. 2: Replacement of main raising pipe lines and pump. 3: Construction of another borehole. 4: Construction of one elevated water tank. — —
7609 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari bossaso Carmo 2.0 Horseed water company 22/05/13 Carmo borehole1 — 10.5489725 49.0702793 665.0 — 4 — urban yes — Yes — 3600 — — — — — 248.0 pvc 8.0 — 12.0 15.0 — — — — — — — — — — — — — — — — — — — — — Galvanised Steel — 600 — — no — — Submersible Pump Lowara — — Generator Perkins 45.0 — — fair All boreholes distribute water to 1 storage water tank. no — 31.0 7.6 2400.0 1200.0 — Private-Public-Partnership — — — — yes 0.026 — — — — Horseed water company 20/05/21 Replacement of main raising pipes Solar Generator Pipes — —
7188 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Bursaalax — Community 12/03/01 Ceelcadde bursalaax BH — 7.1857728 47.2462594 355.0 — 7 — urban yes — Yes — 3520 — — — — — 196.0 pvc 8.0 — 20.0 15.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 20.0 Galvanised Steel 5000.0 520 5 3 yes 2 8.0 Submersible Pump Lowara 11.0 168.0 Hybrid - Solar/Generator Parkins 35.0 SZYL_M350_36 25.0 good — yes Colorless and odorless 29.5 8.21 2145.0 1003.0 — Private/Individual — — — — yes 0.05 yes — — — ICRC 12/03/19 Installation of solar power 1. Construction of new elevated tank 2. Extension of pipelines to IDP. — —
7205 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Bari bossaso Ceeldahir 1.5 Kuwait Government — Ceeldahir borehole 2 — 10.6125246 49.0492388 623.0 — 2 — rural urban yes — Yes — 900 150 — 1500 — — 150.0 pvc 8.0 — 12.0 8.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 20.0 PVC 500.0 — 8 — yes 3 9.0 Submersible Pump Lowara — 132.0 Generator Eveco 30.0 — — fair The distribution pipe lines are disconnected. The yield of borehole is very low. no — 26.3 7.65 3520.0 1770.0 — Communal no — — — yes 0.02 yes — — — Community_e 25/11/21 Replacement of main raising pipes and submersible pump. Solar power installation. Replacement of main raising pipes and submersible pump. Replacement of distribution pipe line. — —
7932 — Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug goldogob Ramaas — PWASEN 12/03/18 Ramaas BH — 7.2135578 47.3402197 353.0 — 1 — rural urban yes — Yes — 910 2000 — 9000 0.0 — 220.0 pvc 8.0 — 12.0 5.0 — 3.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 30.0 Stainless Steel 1200.0 35 4 2 no — — Submersible Pump Lowara 15.0 180.0 Generator Parkins 45.0 — — fair — yes Colorless and odorless 29.8 7.51 2335.0 1157.0 — Communal yes 12/03/18 2 2 no — no — — — — — — 1. Rehabilitation of pump and riser pipes 2. Installation of solar power 3. Rehabilitation of koisks 4. Construction of new elevated tank. — —