7218 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
qardho |
Juurile |
1.5 |
Former Somali Government |
16/11/86 |
Juurile borehole |
— |
10.3962938 |
49.0667047 |
682.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1200 |
1500 |
— |
5000 |
0.5 |
— |
126.0 |
gi |
6.0 |
117.0 |
10.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
120.0 |
Galvanised Steel |
1700.0 |
— |
8 |
2 |
yes |
5 |
8.0 |
Submersible Pump |
Grundfos |
— |
126.0 |
Hybrid - Solar/Generator |
IVECO |
32.0 |
SZYL-P325-36 |
24.7 |
poor |
The borehole has 3 water storage.
two elevated water tank in the village and other one is located at the borehole site.
The capacity of three tanks is 120 meter cubic.
The pipe line connection b/n the village and borehole is been destroyed by floods.
And the village has no water supply.
Fetching water from the borehole is difficult due to the crossing of buran stream, which is very large and sand. |
no |
— |
26.6 |
8.06 |
1740.0 |
865.0 |
— |
Communal |
yes |
17/09/16 |
7 |
8 |
no |
— |
yes |
— |
— |
— |
NRC |
13/11/18 |
Installation of solar power system.
Replacement of main raising pipes and submersible pump.
Construction of two toilets.
Widening of animal troughs. |
1: Placement of pipe lines which distribute water to the village.
2: Replacement of main raising pipe lines and pump.
3: Construction of another borehole.
4: Construction of one elevated water tank. |
— |
— |
7932 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Mudug |
goldogob |
Ramaas |
— |
PWASEN |
12/03/18 |
Ramaas BH |
— |
7.2135578 |
47.3402197 |
353.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
910 |
2000 |
— |
9000 |
0.0 |
— |
220.0 |
pvc |
8.0 |
— |
12.0 |
5.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
30.0 |
Stainless Steel |
1200.0 |
35 |
4 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
15.0 |
180.0 |
Generator |
Parkins |
45.0 |
— |
— |
fair |
— |
yes |
Colorless and odorless |
29.8 |
7.51 |
2335.0 |
1157.0 |
— |
Communal |
yes |
12/03/18 |
2 |
2 |
no |
— |
no |
— |
— |
— |
— |
— |
— |
1. Rehabilitation of pump and riser pipes
2. Installation of solar power
3. Rehabilitation of koisks
4. Construction of new elevated tank. |
— |
— |
7250 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Mudug |
galkayo |
Roox |
— |
Community |
12/03/16 |
Roox BH |
— |
7.2052439 |
47.4384682 |
341.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
4200 |
1500 |
— |
2500 |
— |
— |
180.0 |
pvc |
8.0 |
— |
13.3 |
15.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Galvanised Steel |
1300.0 |
30 |
6 |
2 |
yes |
2 |
8.0 |
Submersible Pump |
Lowara |
11.0 |
150.0 |
Hybrid - Solar/Generator |
Doss |
30.0 |
— |
19.6 |
fair |
— |
yes |
Colorless and odorless |
34.5 |
7.61 |
2350.0 |
1171.0 |
— |
Communal |
yes |
12/03/16 |
5 |
2 |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/03/20 |
1. Installation of solar power.
2. Rehabilitation of pump. |
1. Construction of new elevated tank and rehabilitation of generator.
2. Extension pump capacity.
3. Extension pipelines
4. Room caretaker room. |
— |
— |
7097 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
qardho |
Juurile |
— |
Community_ |
01/09/16 |
Dhuur borehole 1 |
— |
10.4176885 |
49.0949138 |
656.0 |
— |
3 |
— |
rural urban |
yes |
— |
Yes |
— |
12000 |
800 |
— |
4500 |
— |
— |
180.0 |
pvc |
8.0 |
80.0 |
36.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
171.0 |
PVC |
200.0 |
— |
1 |
2 |
yes |
70 |
9.0 |
Submersible Pump |
Lowara |
— |
150.0 |
Hybrid - Solar/Generator |
2 generator, both are Perkins
100kva&50kva |
150.0 |
JP-300M-72
YL365D-36b |
25.6 |
good |
The borehole has a good yield which is equal 36 meter cubic per hour.
The consumption of the borehole is water trucking. |
no |
— |
26.8 |
7.7 |
1400.0 |
700.0 |
— |
Private/Individual |
— |
— |
— |
— |
yes |
0.02 |
yes |
— |
— |
— |
Community_e |
18/07/21 |
Replacement of main raising pipes and submersible pump. |
Replacement of main raising pipes and submersible pump
Construction of caretaker room. |
— |
— |
7204 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
qardho |
Carmo |
3.0 |
Horseed water company |
12/07/19 |
Carmo borehole 3 |
— |
10.5711623 |
49.0842369 |
644.0 |
— |
5 |
— |
rural urban |
yes |
— |
Yes |
— |
1800 |
100 |
— |
700 |
— |
— |
240.0 |
pvc |
8.0 |
180.0 |
10.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
426.0 |
PVC |
— |
300 |
— |
— |
no |
— |
— |
Submersible Pump |
Lowara |
— |
234.0 |
Generator |
Perkins |
45.0 |
— |
— |
good |
But the water is over salt.
The borehole distribute water to the village so it is difficult to determine length of pipe line. |
yes |
Yellow color.
Water is over salt. |
26.7 |
7.28 |
4050.0 |
2020.0 |
— |
Private-Public-Partnership |
— |
— |
— |
— |
yes |
0.02 |
yes |
— |
— |
— |
Horseed water company |
16/07/20 |
Cleaning of the borehole site. |
Installation of solar power system.
Fencing. |
— |
— |
7068 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
bossaso |
Carta |
0.5 |
Kuwait Government |
14/08/13 |
Carta borehole |
— |
10.4914185 |
49.0775361 |
656.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
1200 |
— |
— |
— |
— |
— |
190.0 |
pvc |
8.0 |
— |
10.0 |
5.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
18.0 |
Galvanised Steel |
150.0 |
45 |
3 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
— |
111.0 |
Hybrid - Solar/Generator |
DEUTZ
Perkins |
30.0 |
CSP300 |
24.0 |
fair |
No good yield
The water is dissolved some salt |
no |
— |
26.7 |
7.45 |
2740.0 |
1365.0 |
— |
Communal |
yes |
13/09/19 |
3 |
2 |
yes |
0.02 |
yes |
— |
— |
— |
CARE Somalia |
09/02/19 |
Construction of the roof of the caretaker room and generator room.
Replacement of rusted distribution pipe lines
Rehabilitation of elevated water tank. |
Replacement of main raising pipes and submersible pump.
Construction elevated water tank.
Construction of animal troughs which located out of the village.
Complete water supply system.around the village. |
— |
— |
7980 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 10, 2022 |
Mudug |
goldogob |
Bursaalax |
0.5 |
Community |
10/02/21 |
Mahiigaan BH |
— |
7.1654211 |
47.2408643 |
355.0 |
— |
5 |
— |
urban |
yes |
— |
Yes |
— |
— |
— |
— |
— |
— |
— |
220.0 |
pvc |
8.0 |
— |
24.0 |
— |
— |
0.3 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
80.0 |
PVC |
120.0 |
— |
— |
— |
no |
— |
— |
No Pump |
— |
— |
— |
— |
— |
— |
— |
— |
poor |
There is no supply for this borehole |
yes |
Colorless and odorless |
33.1 |
7.6 |
1902.0 |
1274.3 |
— |
Communal |
yes |
10/02/21 |
3 |
2 |
yes |
— |
no |
— |
— |
— |
Community |
10/03/22 |
1. Construction of elevated water tank |
Construction of new elevated tank.
Installation of solar power.
Construction of koisks and animal troughts.
5. Installation of generator. |
— |
— |
7976 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 10, 2022 |
Mudug |
goldogob |
Bursaalax |
0.7 |
Community |
10/10/21 |
Rouble BH bursaalax |
— |
7.164917 |
47.2376117 |
355.0 |
— |
7 |
— |
urban |
yes |
— |
Yes |
— |
1400 |
— |
— |
— |
— |
— |
220.0 |
pvc |
8.0 |
— |
20.0 |
5.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
28.0 |
Galvanised Steel |
80.0 |
— |
— |
2 |
yes |
4 |
8.0 |
Submersible Pump |
— |
15.0 |
185.0 |
Generator |
Parkins |
45.0 |
— |
— |
poor |
There is no any water supply |
yes |
Colorless and odorless |
32.3 |
7.8 |
1946.0 |
1303.0 |
— |
Communal |
yes |
10/10/21 |
4 |
0 |
no |
— |
no |
— |
— |
— |
— |
— |
— |
1. Installation of solar power
2. Construction of new elevated tank
3. Water supply pipes
5. Construction of koisks and animal troughts |
— |
— |
7528 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 10, 2022 |
Mudug |
goldogob |
Bursalaax |
— |
CARE Somalia |
10/01/94 |
Bursaalax BH, ceel weyne |
— |
7.1802309 |
47.242755 |
355.0 |
— |
4 |
— |
urban |
yes |
— |
Yes |
— |
3000 |
— |
— |
— |
— |
— |
210.0 |
gi |
6.0 |
— |
17.0 |
15.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
68.0 |
PVC |
4000.0 |
350 |
4 |
2 |
yes |
9 |
8.0 |
Submersible Pump |
Lowara |
11.0 |
170.0 |
Hybrid - Solar/Generator |
Parkins |
20.0 |
YL365D-36b |
12.77 |
fair |
— |
yes |
Colorless and odorless |
31.6 |
7.6 |
1940.0 |
1299.8 |
— |
Communal |
no |
— |
— |
— |
yes |
0.05 |
no |
— |
— |
— |
IRC |
10/03/19 |
1. Installation of solar power |
1. Construction of new elevated tank
2. Rehabilitation of generator
3. Fancing.
4. Caretaker rooms construction.
5. Rehabilitation of pump and riser pipes
6. Extension of pipelines. |
— |
— |
8731 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 10, 2022 |
Mudug |
goldogob |
Bursaalax |
— |
PSAWEN |
10/03/08 |
Bursalax water company BH 2 |
— |
7.1833919 |
47.2283962 |
374.0 |
— |
3 |
— |
— |
no |
— |
Abandoned |
— |
— |
— |
— |
— |
— |
— |
196.0 |
pvc |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
— |
Other |
— |
— |
— |
— |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
poor |
Not functioning |
no |
— |
— |
— |
— |
— |
— |
Utility/Local Authority |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
Poor of yield so needs drilling of new borehole |
— |
— |