| 7068 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
bossaso |
Carta |
0.5 |
Kuwait Government |
14/08/13 |
Carta borehole |
— |
10.4914185 |
49.0775361 |
656.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
1200 |
— |
— |
— |
— |
— |
190.0 |
pvc |
8.0 |
— |
10.0 |
5.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
18.0 |
Galvanised Steel |
150.0 |
45 |
3 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
— |
111.0 |
Hybrid - Solar/Generator |
DEUTZ
Perkins |
30.0 |
CSP300 |
24.0 |
fair |
No good yield
The water is dissolved some salt |
no |
— |
26.7 |
7.45 |
2740.0 |
1365.0 |
— |
Communal |
yes |
13/09/19 |
3 |
2 |
yes |
0.02 |
yes |
— |
— |
— |
CARE Somalia |
09/02/19 |
Construction of the roof of the caretaker room and generator room.
Replacement of rusted distribution pipe lines
Rehabilitation of elevated water tank. |
Replacement of main raising pipes and submersible pump.
Construction elevated water tank.
Construction of animal troughs which located out of the village.
Complete water supply system.around the village. |
— |
— |
| 7184 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Mudug |
goldogob |
Kalabayr |
0.2 |
Community |
19/03/11 |
Kalabayr BH |
— |
7.1906848 |
47.2928613 |
355.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
980 |
1650 |
— |
2500 |
0.0 |
— |
230.0 |
pvc |
8.0 |
— |
11.5 |
12.0 |
— |
4.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
56.0 |
Galvanised Steel |
1500.0 |
20 |
1 |
2 |
yes |
7 |
8.0 |
Submersible Pump |
Lowara |
15.0 |
216.0 |
Hybrid - Solar/Generator |
Parkins |
45.0 |
GCNS_M36V390W |
15.99 |
good |
— |
yes |
Colorless and odorless |
29.3 |
7.62 |
2550.0 |
1245.0 |
— |
Communal |
yes |
19/03/12 |
5 |
0 |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/01/21 |
1. Installation of solar power
2. Rehabilitation of koisks
3. Rehabilitation of pump and riser pipes |
1. Fancing.
2. Rehabilitation of koisks and construction new koisks.
3. Rehabilitation of animal troughts.
4. Rehabilitation rooms.
5. Fuel supporting. |
— |
— |
| 7183 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Mudug |
goldogob |
Laandheere |
0.3 |
Community |
12/03/13 |
Laandheere BH |
— |
7.1810792 |
47.3584385 |
350.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
910 |
300 |
— |
2500 |
0.0 |
— |
180.0 |
pvc |
8.0 |
— |
10.0 |
10.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
13.0 |
Stainless Steel |
500.0 |
7 |
4 |
2 |
yes |
3 |
8.0 |
Submersible Pump |
— |
15.0 |
145.0 |
Hybrid - Solar/Generator |
IVECO |
30.0 |
GD100_01G_4_PV |
18.5 |
fair |
— |
yes |
Colorless and odorless |
29.3 |
7.72 |
2835.0 |
1405.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/02/21 |
1. Rehabilitation of pipes, koisks and animal throughts
2. Installation of solar power. |
1.Construction of new elevated tank
2. Fancing of borehole. |
— |
— |
| 7204 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
qardho |
Carmo |
3.0 |
Horseed water company |
12/07/19 |
Carmo borehole 3 |
— |
10.5711623 |
49.0842369 |
644.0 |
— |
5 |
— |
rural urban |
yes |
— |
Yes |
— |
1800 |
100 |
— |
700 |
— |
— |
240.0 |
pvc |
8.0 |
180.0 |
10.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
426.0 |
PVC |
— |
300 |
— |
— |
no |
— |
— |
Submersible Pump |
Lowara |
— |
234.0 |
Generator |
Perkins |
45.0 |
— |
— |
good |
But the water is over salt.
The borehole distribute water to the village so it is difficult to determine length of pipe line. |
yes |
Yellow color.
Water is over salt. |
26.7 |
7.28 |
4050.0 |
2020.0 |
— |
Private-Public-Partnership |
— |
— |
— |
— |
yes |
0.02 |
yes |
— |
— |
— |
Horseed water company |
16/07/20 |
Cleaning of the borehole site. |
Installation of solar power system.
Fencing. |
— |
— |
| 7250 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Mudug |
galkayo |
Roox |
— |
Community |
12/03/16 |
Roox BH |
— |
7.2052439 |
47.4384682 |
341.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
4200 |
1500 |
— |
2500 |
— |
— |
180.0 |
pvc |
8.0 |
— |
13.3 |
15.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Galvanised Steel |
1300.0 |
30 |
6 |
2 |
yes |
2 |
8.0 |
Submersible Pump |
Lowara |
11.0 |
150.0 |
Hybrid - Solar/Generator |
Doss |
30.0 |
— |
19.6 |
fair |
— |
yes |
Colorless and odorless |
34.5 |
7.61 |
2350.0 |
1171.0 |
— |
Communal |
yes |
12/03/16 |
5 |
2 |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/03/20 |
1. Installation of solar power.
2. Rehabilitation of pump. |
1. Construction of new elevated tank and rehabilitation of generator.
2. Extension pump capacity.
3. Extension pipelines
4. Room caretaker room. |
— |
— |
| 7218 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
qardho |
Juurile |
1.5 |
Former Somali Government |
16/11/86 |
Juurile borehole |
— |
10.3962938 |
49.0667047 |
682.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1200 |
1500 |
— |
5000 |
0.5 |
— |
126.0 |
gi |
6.0 |
117.0 |
10.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
120.0 |
Galvanised Steel |
1700.0 |
— |
8 |
2 |
yes |
5 |
8.0 |
Submersible Pump |
Grundfos |
— |
126.0 |
Hybrid - Solar/Generator |
IVECO |
32.0 |
SZYL-P325-36 |
24.7 |
poor |
The borehole has 3 water storage.
two elevated water tank in the village and other one is located at the borehole site.
The capacity of three tanks is 120 meter cubic.
The pipe line connection b/n the village and borehole is been destroyed by floods.
And the village has no water supply.
Fetching water from the borehole is difficult due to the crossing of buran stream, which is very large and sand. |
no |
— |
26.6 |
8.06 |
1740.0 |
865.0 |
— |
Communal |
yes |
17/09/16 |
7 |
8 |
no |
— |
yes |
— |
— |
— |
NRC |
13/11/18 |
Installation of solar power system.
Replacement of main raising pipes and submersible pump.
Construction of two toilets.
Widening of animal troughs. |
1: Placement of pipe lines which distribute water to the village.
2: Replacement of main raising pipe lines and pump.
3: Construction of another borehole.
4: Construction of one elevated water tank. |
— |
— |
| 7609 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
bossaso |
Carmo |
2.0 |
Horseed water company |
22/05/13 |
Carmo borehole1 |
— |
10.5489725 |
49.0702793 |
665.0 |
— |
4 |
— |
urban |
yes |
— |
Yes |
— |
3600 |
— |
— |
— |
— |
— |
248.0 |
pvc |
8.0 |
— |
12.0 |
15.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Galvanised Steel |
— |
600 |
— |
— |
no |
— |
— |
Submersible Pump |
Lowara |
— |
— |
Generator |
Perkins |
45.0 |
— |
— |
fair |
All boreholes distribute water to 1 storage water tank.
|
no |
— |
31.0 |
7.6 |
2400.0 |
1200.0 |
— |
Private-Public-Partnership |
— |
— |
— |
— |
yes |
0.026 |
— |
— |
— |
— |
Horseed water company |
20/05/21 |
Replacement of main raising pipes |
Solar
Generator
Pipes |
— |
— |
| 7188 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Mudug |
goldogob |
Bursaalax |
— |
Community |
12/03/01 |
Ceelcadde bursalaax BH |
— |
7.1857728 |
47.2462594 |
355.0 |
— |
7 |
— |
urban |
yes |
— |
Yes |
— |
3520 |
— |
— |
— |
— |
— |
196.0 |
pvc |
8.0 |
— |
20.0 |
15.0 |
— |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Galvanised Steel |
5000.0 |
520 |
5 |
3 |
yes |
2 |
8.0 |
Submersible Pump |
Lowara |
11.0 |
168.0 |
Hybrid - Solar/Generator |
Parkins |
35.0 |
SZYL_M350_36 |
25.0 |
good |
— |
yes |
Colorless and odorless |
29.5 |
8.21 |
2145.0 |
1003.0 |
— |
Private/Individual |
— |
— |
— |
— |
yes |
0.05 |
yes |
— |
— |
— |
ICRC |
12/03/19 |
Installation of solar power |
1. Construction of new elevated tank
2. Extension of pipelines to IDP. |
— |
— |
| 7205 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Bari |
bossaso |
Ceeldahir |
1.5 |
Kuwait Government |
— |
Ceeldahir borehole 2 |
— |
10.6125246 |
49.0492388 |
623.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
900 |
150 |
— |
1500 |
— |
— |
150.0 |
pvc |
8.0 |
— |
12.0 |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
PVC |
500.0 |
— |
8 |
— |
yes |
3 |
9.0 |
Submersible Pump |
Lowara |
— |
132.0 |
Generator |
Eveco |
30.0 |
— |
— |
fair |
The distribution pipe lines are disconnected.
The yield of borehole is very low. |
no |
— |
26.3 |
7.65 |
3520.0 |
1770.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.02 |
yes |
— |
— |
— |
Community_e |
25/11/21 |
Replacement of main raising pipes and submersible pump. |
Solar power installation.
Replacement of main raising pipes and submersible pump.
Replacement of distribution pipe line. |
— |
— |
| 7932 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
March 12, 2022 |
Mudug |
goldogob |
Ramaas |
— |
PWASEN |
12/03/18 |
Ramaas BH |
— |
7.2135578 |
47.3402197 |
353.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
910 |
2000 |
— |
9000 |
0.0 |
— |
220.0 |
pvc |
8.0 |
— |
12.0 |
5.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
30.0 |
Stainless Steel |
1200.0 |
35 |
4 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
15.0 |
180.0 |
Generator |
Parkins |
45.0 |
— |
— |
fair |
— |
yes |
Colorless and odorless |
29.8 |
7.51 |
2335.0 |
1157.0 |
— |
Communal |
yes |
12/03/18 |
2 |
2 |
no |
— |
no |
— |
— |
— |
— |
— |
— |
1. Rehabilitation of pump and riser pipes
2. Installation of solar power
3. Rehabilitation of koisks
4. Construction of new elevated tank. |
— |
— |