Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7429 — Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Aljaziira/ Galkacayo — Private 06/03/17 Aljaziira BH — 6.8009848 47.4198503 258.0 — 20 — urban yes — Yes — 3500 — — — — — 205.0 pvc 8.0 — 60.0 15.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 200.0 PVC 6000.0 500 4 0 yes 10 8.0 Submersible Pump Lowara 18.0 150.0 Generator Parkins 160.0 — — good — yes Colorless and odorless 29.6 8.08 2540.0 1270.0 — Private/Individual — — — — yes 0.1 no — — — Private — Rehabilitation of generator 1. Installation of solar power — —
7643 — Spring Puntland Ministry of Energy Minerals and Water March 6, 2022 Bari bandar_beyla Caris 1.0 Shilcon 27/12/05 Haashire spring — 9.5872416 50.8004885 -32.0 — 1 — rural urban yes — Yes — 720 — — 100 — — — — — — — — — — — — — — — — — — — — — — 7.0 — — — — Concrete/Masonry tank 6.0 PVC 1200.0 — 3 1 no — — Submersible Pump Lowara — — Hybrid - Solar/Generator KAMA — — — fair The power of generator and solar is very low. The yield is very low. no — 29.5 7.64 1700.0 895.0 — Communal yes 14/09/21 3 2 yes 0.025 no — — — CARE Somalia 30/12/21 1: Installation of 5 solar panels with all accessories. 2: Rehabilitation of caretaker room. 3: Installation of submersible pump. 4: Construction of RC concrete slab which protect the mouth of spring. 5: Construction of 3 kiosks and one animal troughs. 1: Diging the deep of the spring in order to increase its yield. 2: Generator and installation of extra solar panels with all accessories. 3: Fuel which acess generator. — —
7861 — Spring Puntland Ministry of Energy Minerals and Water March 5, 2022 Bari bandar_beyla Il raxma 1.5 — — 2 — 9.4989125 50.8073479 -18.0 — 2 — rural urban yes — Yes — 6000 — — — — — — — — — — — — — — — — — — — — — — — — — 4.0 — — — — Concrete/Masonry tank — Galvanised Steel — — — — yes 7 9.0 Submersible Pump Lowara — — Solar — — DS60250M 13.5 poor The yield of spring is very low Bender bayla district have two spring both they distribute water to elevated water tank, then elevated water tank distribute to households, Il raxmo spring and bayla spring shares pipe lines, house holds, number of water trucking. no — 34.0 7.4 3100.0 1520.0 — Communal yes 05/07/16 5 0 no — no — — — Other 09/08/14 Construction of caretaker room Installation if solar power system. Construction solar accessories storage room. Installation of extra solar power panels. Replacent of all rusted pipes. — —
7870 — Spring Puntland Ministry of Energy Minerals and Water March 5, 2022 Bari bandar_beyla Bayla district 1.0 — — Bayla spring — 9.5007969 50.8121613 -39.0 — 2 — rural urban yes — Yes — 7200 — — — — — — — — — — — — — — — — — — — — — — — — — 5.0 — — — — Concrete/Masonry tank 23.0 Galvanised Steel — 200 — — yes 17 9.0 Surface mounted Pump Lowara — — Generator Prkins 33.0 — — poor Because the yield of spring is very low, in addition to the pipe lines are rusted, and there is no animal troughs and kiosks. Bender bayla Have two spring which distribute water to one elevated water tank, then to the house holds. Both spring shares households, pipe lines. no — 30.0 6.95 2850.0 1430.0 — Communal yes 05/07/16 5 0 no — no — — — Community_e 05/04/20 Supplied of generator and 300 of pipe lines. Installation of solar power system. Construction of elevated water tank. Replacement of all rusted pipes. to Increase the yield of the spring either by digging deep or building large storage. — —
7699 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — Private 05/03/07 Galkacayo agoonta BH — 6.8163557 47.4337054 259.0 — 20 — urban yes — Yes — 500 — — — — — 230.0 pvc 8.0 — 8.0 18.0 — 2.4 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 24.0 PVC 600.0 50 — — yes 10 8.0 Submersible Pump Lowara 18.0 138.0 Hybrid - Solar/Generator — 70.0 BR_M300W 21.0 good — yes Colorless and odorless 32.1 7.81 3340.0 1642.0 — Private/Individual — — — — yes 0.01 no — — — — — — 1. Extension of pipelines. 2. Extension and installation of solar power 3. Rehabilitation of generator. 4. Construction of new elevated tank. — —
7509 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — Galkacayo Water Company / Qatar charity 05/03/15 Galkacayo BH 7 — 6.7962296 47.4103577 268.0 — 20 — urban yes — Yes — 77000 — — — — — 200.0 pvc 12.0 — 26.0 15.0 — 3.0 — — — — — — — — — — — — — — — — — Steel tank 750.0 Galvanised Steel 2500.0 5000 — — yes — — Submersible Pump Etx 22.0 160.0 Generator Parkins 350.0 — — good — yes Colorless and odorless 27.6 7.92 3470.0 1718.0 — Private-Public-Partnership — — — — yes 0.05 no — — — — — — 1. Extension of pipelines — —
8311 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — Galkacyo water company 05/03/12 Galkacayo water company BH 4 — 6.7923229 47.4138098 257.0 — 20 — urban yes — Yes — 11000 — — — — — 220.0 pvc 12.0 — 30.0 15.0 — 2.3 — — — — — — — — — — — — — — — — — Steel tank 750.0 PVC 4000.0 1600 — — no — — Submersible Pump Franklin 15.0 150.0 Generator Parkins 350.0 — — — — yes — — — — — — Private-Public-Partnership — — — — no — no — — — — — — — — —
7510 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — Galkacayo Water Company 05/03/06 Galkacayo BH 3 — 6.7983486 47.4099016 270.0 — 20 — urban yes — Yes — 77000 — — — — — 220.0 pvc 12.0 — 27.0 15.0 — 3.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 30.0 Stainless Steel 2000.0 1600 — — no — — Submersible Pump Franklin 22.0 104.0 Generator — 350.0 — — — — yes Colorless and odorless 28.3 7.41 3380.0 1722.0 — Private-Public-Partnership — — — — yes 0.05 no — — — — — — 1. Construction of new elevated tank — —
7513 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — UNICEF 05/03/03 Galkacayo water company BH 2 — 6.7940122 47.4114582 251.0 — 20 — urban yes — Yes — 77000 — — — — — 220.0 pvc 12.0 — 45.0 15.0 — 3.0 — — — — — — — — — — — — — — — — — Steel tank 750.0 PVC 5000.0 1600 — — no — — Submersible Pump Lowara 22.0 120.0 Generator 350 350.0 — — — — yes Colorless and odorless 27.6 7.61 3300.0 1635.0 — Private-Public-Partnership — — — — yes 0.05 no — — — — — — 1. Rehabilitation of elevated water tank — —
7508 — Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo — UNICEF 05/03/03 Galkacayo Water Company BH 1 — 6.7959241 47.4156132 255.0 — 20 — urban yes — Yes — 77000 — — — — — 220.0 pvc 12.0 — 26.0 15.0 — 3.0 — — — — — — — — — — — — — — — — — Steel tank 750.0 PVC 6000.0 1600 — — no — — Submersible Pump Saha 22.0 150.0 Hybrid - Solar/Generator — 70.0 SZYL_M350-36 31.5 good — yes Colorless and odorless 27.5 7.92 3510.0 1720.0 — Private-Public-Partnership — — — — yes 0.05 no — — — — — — 1. Pipelines extension — —