Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7523 — Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Ceel boos Goldogob — — 08/03/17 Ceel booc BH goldogob — 7.0321616 47.022893 346.0 — 11 — urban yes — Yes — 750 — — — — — 215.0 pvc 8.0 — 6.7 5.0 — 4.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 94.0 Galvanised Steel 70.0 — 1 2 yes 3 8.0 Submersible Pump — 11.0 192.0 Generator Parkins 30.0 — — poor Absolutely poor supply, this supply needs full rehabilitation yes Colorless and odorless 32.1 7.54 2530.0 1251.0 — Private/Individual — — — — yes 0.05 yes — — — — — — 1. Emergency 2. Installation of solar power 3. Generator rehabilitation 4. Caretaker and Generator rooms rehabilitation 5. Koisks and animal thoughts rehabilitation 6. Fancing. — —
7534 — Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob — Galdogob Water Company 13/03/17 Goldogob water company BH 5 — 7.0437981 47.0129558 352.0 — 11 — urban yes — Yes — 42000 — — — — — 235.0 pvc 8.0 140.0 18.0 15.0 — 1.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 240.0 PVC 2786.0 7000 — — — — — Submersible Pump Grandfoss 15.0 126.0 Hybrid - Solar/Generator IVECO 45.0 — — good — yes Colorless and odorless 30.5 7.6 1650.0 818.0 — Private-Public-Partnership — — — — yes 0.05 — — — — — — — 1. Fancing of borehole 2. Rehabilitation of generator. — —
7139 — Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Bari qardho Carmo 1.0 IR 10/05/17 Carmo borehole — 9.4533435 48.8719451 850.0 — 1 — rural urban yes — Yes — 1200 300 10 5000 0.25 — 260.0 pvc 8.0 — 9.0 6.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 20.0 Galvanised Steel 750.0 — 1 3 yes 1 9.0 Submersible Pump — — — Solar — — BR-M250W 21.5 fair The water is over salt. The village has no water kiosks and water supply system. no — 30.3 6.9 5990.0 2990.0 — Communal no — — — no — yes — — — Community_e 17/02/19 Construction of one animal troughs Replacement of main raising pipes and submersible pump. Rehabilitation of some solar panels and its accessories. Generator. Replacement of rusted distribution pipe lines. Water purification. — —
7532 — Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob — Galdogob Water Company — Goldogob BH 1 — 7.0428316 47.0341475 346.0 — 11 — urban rural yes — Yes — 42000 1200 400 5000 2.5 — 209.0 pvc 8.0 — 9.0 15.0 — 3.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 46.0 PVC 1500.0 250 — — no — — Submersible Pump Lowara 15.0 198.0 Generator Parkins 45.0 — — fair Needs rehabilitation yes Colorless and odorless 30.8 7.56 1710.0 845.0 — Private-Public-Partnership — — — — yes 0.05 no — — — GSA 08/03/12 Construction of elevated water tank 1.Installation of solar power 2. Installation of generator 3. Rehabilitation of pump and riser pipes — —
7533 — Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob — UNICEF 08/03/17 Goldogob BH 3 — 7.0409077 47.0329871 345.0 — 11 — urban yes — Yes — 42000 — — — — — 218.0 pvc 8.0 — 12.0 15.0 — 3.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 240.0 PVC 9532.0 1590 — — no — — Submersible Pump Frankilin 11.0 192.0 Generator Parkins 110.0 — — good — yes Colorless and odorless 30.5 7.6 1650.0 818.0 — Private-Public-Partnership — — — — yes 0.05 no — — — — — — 1. Installation of solar power 3. Full rehabilitation 3. Fancing of borehole and supplies. — —
7178 — Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Barwaaqo — Community 07/03/19 Barwaaqo BH — 6.9693155 47.272905 301.0 — 1 — rural urban yes — Yes — 1050 600 — 1200 0.0 — 201.0 pvc 8.0 — 17.3 10.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 26.0 PVC 200.0 35 2 2 yes 4 8.0 Submersible Pump — 11.0 151.0 Generator Parkins 30.0 — — poor Absolutely needs full rehabilitation yes — 29.7 7.5 3100.0 1565.0 — Communal yes 07/03/19 5 2 yes 0.05 yes — — — CARE Somalia 07/01/21 1. Construction of new elevated tank. 2. Construction of koisks and animal thoughts. 1. Emergency for Installation of solar power 2.. Construction of koisks 3. Fancing borehole 4. Pump spare. 5. Operator supporting. — —
7916 — Dug Well Puntland Ministry of Energy Minerals and Water March 7, 2022 Bari bandar_beyla Qoton 0.5 Community_ 13/05/00 Qoton dug well 1 — 9.5949967 50.471645 242.0 — 2 — rural urban yes — Yes — 600 1000 — 5000 — — — — — — — — — — 5.0 4.0 15.0 — — — — — — — — — — — — — — — — — — — — 2 yes 20 8.0 — — — — — — — — — poor There is no pump and main raising pipes. No generator. No solar power system. no — 27.3 8.0 2400.0 1200.0 — Communal yes — 5 — no — no — — — Community_e 07/08/21 Cleaning the deep of the well 1: Installation of submersible pump and raising pipes. 2: Construction of another animal troughs. 3: Construction of elevated water tank. generator. — —
8312 — Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Najax IDP Galkacayo — Xisbulislaam 07/03/17 Wadajir BH — 6.8134989 47.3897698 258.0 — 1 — urban yes — Yes — 4550 — — — — — 195.0 pvc 8.0 — 4.0 12.0 — 4.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 5.0 Galvanised Steel 750.0 10 3 0 no — — Submersible Pump — — 145.0 Hybrid - Solar/Generator — 30.0 SGY15KH 15.0 poor Needs construction of new animal thoughts no — — — — — — Communal no — — — no — no — — — Agency not specified 07/03/17 1. Installation of solar power 1. Construction of new elevated tank 2. Rehabilitation of kiosks and 3.construction of new kiosks. — —
7224 — Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Bayra — CEFA 07/03/10 Bayra BH 1 — 6.9555135 47.3198792 300.0 — 1 — urban rural yes — Yes — 8400 1000 50 2500 0.0 — 200.0 pvc 8.0 70.0 12.0 20.0 — 3.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 60.0 PVC 4000.0 250 6 2 yes 10 8.0 Submersible Pump Lowara 11.0 137.0 Hybrid - Solar/Generator Parkins 30.0 SG600-022GB 22.0 fair Needs construction of elevated water tank yes Colorless and odorless 29.7 7.41 3985.0 1935.0 — Communal yes 07/03/74 5 2 yes 0.05 yes — — — USAID 07/03/20 Installation of solar power 1. Rehabilitation of elevated water tank. 3. Rehabilitation of Groundwater monitoring equipment in the borehole. 4. Rehabilitation of animal thoughts. 5. Rehabilitation of caretaker room. — —
8742 — Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Dhagxanyo cadde — PWDA 07/03/14 Dhagxanyo cade BH 1 — 6.8853691 47.3511965 273.0 — 2 — — no — No Unknown problem — — — — — — 210.0 — — — — — — — — — — — — — — — — — — — — — — — — — — Other — — — — no — — No Pump — — — — — — — — poor — yes — — — — — — Communal yes 07/03/14 4 2 no — no — — — — — — Emergency for observation borehole problem. 1. Rehabilitation of borehole . — —