Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7172 — Borehole Puntland Ministry of Energy Minerals and Water March 1, 2022 Mudug jariban Jariiban 0.0 WDA 01/03/86 Seemade BH 1 — 7.1558815 48.6113718 186.0 — 2 — rural urban yes — Yes — 3500 5000 0 10000 0.0 — 200.0 pvc 8.0 — 14.0 12.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 28.0 Galvanised Steel 250.0 — 1 2 yes 5 8.0 Submersible Pump — 15.0 180.0 Hybrid - Solar/Generator Parkins 32.0 340Wp 15.0 fair The koisks of this water supply needs rehabilitation yes Colorless and odorless 31.5 7.26 5460.0 2670.0 — Communal yes 01/03/90 3 1 yes 0.05 yes — — — Agency not specified 01/02/17 Construction of elevated water tank 1. Construction of new elevated tank. 2. Construction of new kiosks. 3. Rehabilitation and reconstruction of animal thoughts. 4. Construction of new generator room 5. Extension and rehabilitation of pipelines. — —
7251 — Spring Puntland Ministry of Energy Minerals and Water March 1, 2022 Bari bandar_beyla Dhalinbaar 1.0 Other — Dharinbaar spring — 8.9321246 50.4732425 -5.0 — 1 — rural urban yes — Yes — 1200 800 — 3000 — — — — — — — — — — — — — — — — — — — — — — 3.0 — — — — Concrete/Masonry tank 28.0 Galvanised Steel 1000.0 1 8 1 yes 5 5.0 Submersible Pump Lowara — — Generator Perkins 45.0 — — poor The yield of the spring is very low, it needs rehabilitation in order to increase its yield no — 27.0 7.0 3000.0 1500.0 — Communal no — — — no — yes — — — Puntland MoEMW 01/03/19 Supplied of electric cable Replecement of pump Replacement of electric cable which acess generator Construction of animal troughs Installation of solar power system. Replacement of all rusted distribution pipe lines Rehabilitation of elevated water tank in order to stop water leaking. — —
7785 — Borehole Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Mudug jariban Garacad 1 0.5 CARE Somalia 28/02/06 Garacad BH 1 — 6.9437939 49.3254529 -22.0 — 3 — urban yes — Yes — 15000 — — — — — 7.0 pvc 8.0 — 2.0 5.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 13.0 Galvanised Steel 1500.0 134 0 — no — — Submersible Pump — 1.5 5.0 Solar — — — — poor Because of more saline in water, the water supply corrosion than destroyed yes Very saline water 29.1 7.8 7240.0 4850.0 — Utility/Local Authority — — — — no — no — — — — — — 1.Drilling new borehole far away for this borehole because this borehole so saline 2. Rehabilitation and reconstruction all water supply. — —
7102 — Borehole Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Mudug jariban Towfiiq 0.3 — 28/02/16 Towfiq BH 1 — 6.6137593 48.8710917 3.0 — 2 — rural urban yes — Yes — 14000 10000 800 15000 0.0 — 84.0 pvc 8.0 — 12.0 12.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 30.0 Galvanised Steel 1500.0 2000 8 2 yes 16 96.0 Submersible Pump — 11.0 72.0 Generator Parkins 45.0 — — fair Extension of animal thoughts yes Colorless and odorless 29.8 7.13 6450.0 3130.0 — Communal yes 28/02/16 3 2 yes 0.05 yes — — — CARE Somalia 28/12/21 1.Construction of elevated water tank 2. Construction of caretaker room. 1. Installation of solar power 2. Construction of animal thoughts 3. Construction of new generator room 4. Rehabilitation of elevated water tank. 5. Extension of pipelines systems. — —
7213 — Borehole Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Bari qardho Dhudhub 0.5 Minstry of water and energy federal Republic of somalia 28/02/14 Dhudhub borehole — 9.2356349 49.9205093 438.0 — 1 — rural urban yes — Yes — 12000 4000 — 7000 — — 410.0 pvc 8.0 140.0 10.0 15.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 60.0 Galvanised Steel 4200.0 — 5 2 yes 5 9.0 Submersible Pump Lawara — 204.0 Hybrid - Solar/Generator Perkins 50.0 300-72M 29.4 fair The water demand of the dhudhub is very high. No sufficient water kiosks in the village no — 38.5 7.2 3830.0 1910.0 — Communal yes 28/06/15 5 2 no — yes — — — Puntland MoEMW 15/09/21 Replacement of main raising pipes. 1: Water supply system which gives water to village. 2: Replacement of all distribution pipe lines. 3: Fencing. 4: Rehabilitation of elevated water tank in order to stop water leaking. — —
8677 — Borehole Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Mudug jariban Garacad 2.8 Community 28/10/21 Garacad 2 — 6.9727697 49.2928211 2.0 — 3 — urban no 1 No The water supply of this borehole still constructing — — — — — — 43.0 pvc 8.0 — 10.0 — — — — — — — — — — — — — — — — — — — — — — Galvanised Steel — — — — no — — Surface mounted Pump — — — Solar — — — — poor Under construction no — — — — — — Communal no — — — no — no — — — — — — 1. Emergency 2. Installation of generator 3. Fancing borehole — —
7906 — Dug Well Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Bari bandar_beyla Bixin 0.4 Community_ 20/03/10 Bixin dug well — 9.0879912 50.4303314 145.0 — 1 — rural urban yes — Yes — 3000 500 — 3500 — — — — — — — — — — — — 4.0 8.0 — — — — — — — — — — — — — Concrete/Masonry tank 6.0 Galvanised Steel 450.0 2 7 1 yes 3 7.0 Submersible Pump Lowara — 7.0 Solar — — — 3.0 fair The yield of the dug well is very low. no — 31.0 7.2 2500.0 1250.0 — Communal yes 10/01/20 3 2 no — no — — — CARE Somalia 26/02/20 Construction of Kiosks and water tank and pipeline distribution. Solar&Generator. Digging deeper of the dug well in order to increase yield of dug well. Extension of pipelines Rehabilitation of kiosks and building more kiosks. New dug well. Elevated water tank for agricultural use — —
8093 — Spring Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Bari qardho Dhuudo 0.5 Community 28/04/00 Dhuudo spring — 9.3262517 50.2084952 271.0 — 1 — rural urban yes — Yes — 4800 2000 — 5000 — — — — — — — — — — — — — — — — — — — — — — 6.0 — — — — — — — — — — — yes 20 9.0 — — — — — — — — — poor There is no distribution pipe lines, elevated water tank, submersible pump, main raising pipes. All pipes become rusted and not functioning. The community uses water trucking from dhuudo spring. no — 27.0 6.95 1200.0 590.0 — Communal no — — — no — no — — — Community 15/07/05 Construction of reinforced concrete slab which protect the mouth of the spring., installation of submersible pump. Construction of small elevated water tank. and water kiosks in the village. Construction of elevated water tank Placeme of distribution pipe lines. Placement of main raising pipes and submersible pump. Construction of kiosks and animal troughs. — —
7114 — Borehole Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Mudug jariban Towfiiq 0.8 Community 28/02/16 Towfiiq BH 1 — 6.6146549 48.8797355 10.0 — 2 — rural urban yes — Yes — 14000 3000 500 15000 0.0 — 92.0 pvc 8.0 — 15.3 14.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 70.0 Galvanised Steel 150.0 — 1 3 yes 15 90.0 Submersible Pump Lowara 24.0 72.0 Generator Dos 30.0 — — good — yes Colorless and odorless 29.8 7.13 1150.0 553.0 — Communal yes 28/02/16 3 1 yes 0.1 yes — — — — — — 1. Installation of solar power. 2. Fuel supporting. 3. Construction of new kiosks. 4. Operation tools. — —
7103 — Borehole Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Mudug jariban Gocosaale — Community 28/04/21 Gocosaale BH — 6.8633508 49.0177023 26.0 — 1 — rural yes — Yes — 500 1000 70 5000 0.0 — 180.0 pvc 8.0 — 8.0 24.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 50.0 Galvanised Steel 150.0 — 2 4 yes 20 8.0 Submersible Pump — 11.0 150.0 Generator Parkins 30.0 — — poor Under construction yes Colorless and odorless 32.0 7.41 728.0 362.0 — Communal no — — — yes 0.05 yes — — — — — — 1. Fancing of borehole 2. Pump rehabilitation 3. Construction of generator room 4. Installation of solar power 5. Water committees training. 6. Operation tools. — —