Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7223 Borehole Puntland Ministry of Energy Minerals and Water Feb. 26, 2022 Mudug jariban Godobjiiran BH 1 0.0 Chinese Government 26/02/86 Godobjiraan BH 1 7.5139859 49.4103095 123.0 2 rural urban yes Yes 28000 1500 10000 0.0 210.0 gi 6.0 20.0 10.0 1.5 Concrete/Masonry tank 36.0 Galvanised Steel 180.0 4000 6 3 yes 4 24.0 Submersible Pump Gran fos 11.0 150.0 Hybrid - Solar/Generator Parkins 45.0 SZYL_P300_36 15.0 fair Needs rehabilitation yes Colorless and odorless 31.6 7.7 2800.0 1876.0 Communal yes 26/02/86 4 1 yes 0.15 yes KAALO Relief and Development 26/02/17 Rehabilitation of elevated water tank 1. Drilling new borehole. 2.fancing borehole areas. 3. Rehabilitation of generators and caretaker rooms. 4. Needs to help fuel. 5. Construction of new kiosks. 6. Rehabilitation of kiosks. 7. Rehabilitation of animal thoughts.
7239 Borehole Puntland Ministry of Energy Minerals and Water Feb. 24, 2022 Bari qardho Adisoone 1.0 NRC 24/03/18 Adisoone borehole 9.5310823 49.2307712 672.0 1 rural urban yes Yes 36000 5000 30000 1.0 270.0 pvc 8.0 Concrete/Masonry tank 48.0 Galvanised Steel 400.0 6000 1 3 yes 4 10.0 Submersible Pump Lawara 240.0 Hybrid - Solar/Generator Perkins 50.0 GPS-300-330 26.4 good no 30.5 6.8 2500.0 1250.0 Communal yes 24/11/18 3 2 yes 0.001 yes Puntland MoEMW 24/11/21 Replacement of main raising pipes Construction of extra water kiosks. Construction of animal troughs. Pipes from borehole to elevated water tank, now the water tank is not functioning because lack of pipes. Fencing Installation of extra solar panels
7393 Spring Puntland Ministry of Energy Minerals and Water Feb. 24, 2022 Nugaal eyl Ildabey eyl 0.0 Italian Government Ildabey Spring 7.9793394 49.8188707 15.0 2 urban yes Yes 20000 16.0 Other 110.0 Galvanised Steel 2000.0 2150 10 yes 15 90.0 Submersible Pump Lowara 7.5 3.0 Hybrid - Solar/Generator fair Needs rehabilitation yes Colorless and odorless 30.1 7.1 2550.0 1285.0 Utility/Local Authority yes 0.3 no Agency not specified 1. Rehabilitation and reconstruction of spring. 2. Drilling of new spring
7325 Dug Well Puntland Ministry of Energy Minerals and Water Feb. 24, 2022 Nugaal eyl Badey eyl 0.3 NCA 24/02/21 Dug well 7.9626331 49.8442485 -26.0 2 urban yes Yes 4900 12.0 7.0 16.0 10.0 2.0 Concrete/Masonry tank 50.0 Galvanised Steel 230.0 700 6 0 no Submersible Pump Lowara 2.0 6.0 Hybrid - Solar/Generator Parkins 45.0 PS2-1800 1.8 good yes Colorless and odorless 29.3 7.51 2420.0 1210.0 Utility/Local Authority yes 0.3 yes NCA 24/02/21 Construction of ground water tank Pipeline extension and water kiosks. Construction of caretaker room. Older dug well reconstruction Rehabilitation of pipelines and extensions. Solar power rehabilitation Rehabilitation of solar panels.
7894 Borehole Puntland Ministry of Energy Minerals and Water Feb. 24, 2022 Bari qardho Jidad 0.5 Former Somali Government 24/07/87 Jidad borehole 9.4071044 49.5872312 563.0 1 rural urban yes Yes 12000 3500 6000 220.0 gi 8.0 144.0 4.0 11.0 Concrete/Masonry tank 48.0 Galvanised Steel 1800.0 2000 3 2 no Submersible Pump Lawara 196.0 Hybrid - Solar/Generator Perkins 40.0 21.12 poor The yield of water from borehole is very low. no 28.9 7.1 2600.0 1295.0 Communal yes 25/02/10 4 4 no no DRC - Puntland 25/10/21 Replacement of pump and main raising pipes Construction of new borehole. Rehabilitation of kiosks and animal troughs. Water purification. Increasing of the borehole yield.
7137 Borehole Puntland Ministry of Energy Minerals and Water Feb. 24, 2022 Bari qardho Garihel 0.5 Puntland MoEMW 24/01/20 Gerihel borehole 9.2728326 49.41626 561.0 1 rural urban yes Yes 30000 4000 200 45000 0.05 300.0 pvc 8.0 200.0 13.0 12.0 Concrete/Masonry tank 24.0 PVC 1000.0 500 4 2 yes 3 9.0 Submersible Pump Lawara Hybrid - Solar/Generator Perkins 65.0 BYD400MIK-36 28.0 good no 27.4 6.6 1400.0 700.0 Communal yes 24/01/21 4 2 yes 0.001 yes Puntland MoEMW 24/01/21 Replacement of main raising pipes Replacement of distribution pipe line Extra solar panels Construction of caretaker room Fencing Construction of another animal troughs and kiosks.
7165 Borehole Puntland Ministry of Energy Minerals and Water Feb. 23, 2022 Bari qardho Xingood sare; Qardho 0.4 Former Somali Government 01/03/80 Biyacade borehole 9.4964048 49.0751164 710.0 9 urban rural yes Yes 18000 700 10000 286.0 gi 8.0 130.0 8.0 20.0 Concrete/Masonry tank Galvanised Steel 3 yes 5 8.0 Submersible Pump Lowara 196.0 Hybrid - Solar/Generator Perkins 45.0 SZYL-m330-36 17.16 fair 1: The borehole distributes water to the qardho town. 2: Four boreholes including this one, share on storage water tank. 3: The length of pipes is difficult to determine because this borehole distribute water to the qardho city. 4.The yield is low 5.the solar power don''t provide enough power . no 30.5 6.55 1800.0 885.0 Private-Public-Partnership yes 0.013 yes DRC - Puntland 27/06/20 Replacement of main raising pipes and submersible pump. 1: Installation of extra solar panels. 2: this borehole is collapsing due to that it''s yield is decreasing and they asked for another borehole same location as this one.
7221 Spring Puntland Ministry of Energy Minerals and Water Feb. 23, 2022 Nugaal eyl Kabaal 2.1 ADRA 23/01/03 Kabaal spring 8.4398286 50.2424141 -38.0 0 rural urban yes Yes 8050 500 5000 0.0 6.0 Concrete/Masonry tank 28.0 Galvanised Steel 930.0 1050 4 2 yes 5 30.0 Submersible Pump Lowara 4.5 3.0 Hybrid - Solar/Generator Parkins 45.0 HSPH11KH 11.0 fair Needs rehabilitation yes Colorless and odorless 29.2 7.21 1205.0 595.0 Communal no yes 0.1 yes KAALO Relief and Development 23/12/20 Construction of elevated tank 1. Rehabilitation of pipelines. 2. Rehabilitation of solar power. 3. Spring deconstruction and rehabilitation 4. Caretaker rooms rehabilitation. 5.Generator rehabilitation. 6. Camel animal thoughts rehabilitation. 7. Rehabilitation of kiosks. 8. Operator equipment.
7164 Borehole Puntland Ministry of Energy Minerals and Water Feb. 23, 2022 Bari qardho Aada 2.5 NRC 23/06/18 Aada 2 9.489328 49.063492 725.0 9 rural urban yes Yes 1200 400 3500 0.25 26.0 pvc 8.0 6.0 18.0 150 1 2 yes 4 6.0 Submersible Pump Lowara 235.0 Hybrid - Solar/Generator fair The yield is low. This borehole and another two boreholes shares one storage tank. no 30.5 6.8 1830.0 920.0 Private-Public-Partnership yes 0.013 yes DRC - Puntland 27/03/20 Replacement of main raising pipes and submersible pump. 1: Replacement of rusted iron distribution pipes. 2: Replacement of main raising pipes.
7198 Borehole Puntland Ministry of Energy Minerals and Water Feb. 23, 2022 Bari qardho Harwayn 3.0 Private 23/01/16 Harwayn borehole 9.5297019 49.1097173 702.0 9 rural urban yes Yes 6000 2500 10000 8.0 315.0 pvc 8.0 218.0 12.0 18.0 Concrete/Masonry tank 56.0 Galvanised Steel 300.0 2 2 yes 12 50.0 Submersible Pump Lawara 264.0 Hybrid - Solar/Generator Perkins 50.0 good no 33.0 6.6 3000.0 1500.0 Private/Individual yes 0.04 yes Community 23/12/18 Replacement of main raising pipe lines 1: Fencing. 2: Construction of extra elevated water tank 3: Electric cable which acess generator. 4: Replacement of main raising pipes and submersible pump.