| 7856 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
13/04/22 |
Mudug |
galkayo |
Toore |
0.9 |
Community |
— |
TooreBH |
— |
6.0269633 |
47.7954 |
175.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
6500 |
420 |
— |
66000 |
— |
— |
220.0 |
pvc |
8.0 |
— |
16.0 |
16.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
60.0 |
Galvanised Steel |
90.0 |
20 |
1 |
3 |
yes |
3 |
9.0 |
Submersible Pump |
lowara |
— |
180.0 |
Generator |
DOUTZ |
45.0 |
— |
— |
fair |
not have water supply sytem |
no |
— |
31.7 |
7.6 |
3170.0 |
2180.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
CPD |
motor & small water tank |
— |
— |
— |
— |
| 7090 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
laasqoray |
Dhahar |
0.5 |
Community_ |
01/01/18 |
Ilmo Xuseen jiilaal |
— |
9.749202 |
48.8316414 |
924.0 |
— |
— |
— |
rural urban |
yes |
— |
Yes |
— |
500 |
600 |
— |
2000 |
— |
— |
370.0 |
pvc |
8.0 |
— |
12.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
45.0 |
— |
150.0 |
0 |
1 |
2 |
yes |
9 |
8.0 |
Submersible Pump |
Luwara |
— |
294.0 |
Hybrid - Solar/Generator |
Perkins |
65.0 |
JCNS-M36V370W |
23.3 |
poor |
The solar system are weak and Generator is tired,
The main raising pipes are rusted
The current water tank is not enough |
no |
— |
32.0 |
7.2 |
3160.0 |
1608.0 |
— |
Private/Individual |
— |
— |
— |
— |
yes |
0.1 |
yes |
— |
— |
— |
ACTED |
01/01/20 |
Solar
Main raising pipes and submersible pump
|
Rehabilitation of the solar system
A new troughs
A new Generator
Immediate Replacement of main raising pipes because it''s been 2years since installation. |
— |
— |
| 7853 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
laasqoray |
Dhahar |
0.2 |
Community_ |
01/01/18 |
Ayaan 1 |
— |
9.7479917 |
48.8251207 |
895.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1500 |
2000 |
— |
5000 |
— |
— |
268.0 |
pvc |
8.0 |
78.0 |
12.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
24.0 |
Galvanised Steel |
300.0 |
— |
1 |
2 |
yes |
12 |
8.0 |
Submersible Pump |
Luwara |
— |
174.0 |
Generator |
Perkins |
45.0 |
— |
— |
poor |
The Generator is old and malfunctioning.
The main raising pipes are rusted and old. |
no |
— |
32.0 |
7.1 |
3220.0 |
1630.0 |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
1.solar
2. A new generator
3. Replacement of main raising pipes
4. Larger capacity of a water tank |
— |
— |
| 7821 |
— |
Borehole |
Somaliland MoWRD |
13/04/22 |
Sool |
las_caanood |
Laascaanood |
5.0 |
Private |
01/01/17 |
Nugaal borehole 7 |
— |
8.508847 |
47.4071655 |
617.0 |
— |
6 |
— |
urban |
yes |
— |
No |
It is a reserve for the company and is planned to use later on. |
— |
— |
— |
— |
— |
— |
70.0 |
pvc |
8.0 |
40.0 |
45.0 |
8.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
300.0 |
Galvanised Steel |
0.0 |
0 |
0 |
0 |
no |
— |
— |
Submersible Pump |
Grounfonts |
7.5 |
— |
— |
— |
— |
— |
— |
good |
Thus borehole is not connected to the system |
no |
— |
30.0 |
7.2 |
4000.0 |
2000.0 |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
This borehole is private and reserved |
— |
— |
| 7228 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
13/04/22 |
Mudug |
galkayo |
xibin saxansaxo |
1.0 |
Ahmed shire |
06/04/22 |
xibinsaxansaxo |
— |
6.4700108 |
47.4606597 |
272.0 |
— |
0 |
— |
rural |
yes |
— |
Yes |
— |
700 |
2400 |
— |
60000 |
— |
— |
250.0 |
pvc |
8.0 |
45.0 |
38.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Other |
0.0 |
Galvanised Steel |
10.0 |
0 |
0 |
0 |
no |
— |
— |
Submersible Pump |
T6 (INDIA 7.5kw/10HP) |
— |
180.0 |
Generator |
Doutz |
42.0 |
— |
— |
— |
1. borehole is newly implemented only is pumped and tested
2. not have other facilities like water tank, animal troughs, generator house and store house and solar system. |
no |
— |
25.7 |
7.85 |
665.0 |
466.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
yes |
— |
— |
— |
— |
0 |
— |
— |
— |
— |
| 7852 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
laasqoray |
Dhahar |
0.2 |
Community_ |
01/01/19 |
Ayaan2 |
— |
9.7479088 |
48.8256519 |
895.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1500 |
2000 |
— |
5000 |
— |
— |
317.0 |
pvc |
8.0 |
53.0 |
14.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
24.0 |
Galvanised Steel |
300.0 |
— |
— |
— |
yes |
12 |
8.0 |
Submersible Pump |
Luwara |
— |
196.0 |
Solar |
— |
— |
JCNS-M36V360 |
19.4 |
poor |
The water tank isn''t sufficient
|
no |
— |
32.0 |
7.1 |
3220.0 |
1630.0 |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
Care - Somaliland
IRC - Puntland |
01/01/20 |
Main raising Gi pipes and submersible pump, by Care-Somaliland.
Solar power system and the installation by IRC Puntland.
|
1. Elevated water tank with large storage capacity
2. Generator |
— |
— |
| 7898 |
— |
Borehole |
Galmudug Ministry of Energy and Water Resources |
13/04/22 |
Mudug |
galkayo |
wisil |
1.4 |
Community |
— |
wisil 2 |
— |
5.4189303 |
48.1236662 |
157.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
1400 |
600 |
— |
17000 |
— |
— |
130.0 |
pvc |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
16.0 |
Galvanised Steel |
— |
650 |
2 |
3 |
— |
— |
— |
Submersible Pump |
ATX(7.5HP) |
— |
95.0 |
Generator |
perkin |
30.0 |
— |
— |
— |
— |
no |
— |
31.0 |
7.56 |
2570.0 |
1280.0 |
— |
— |
— |
— |
— |
— |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
| 7828 |
— |
Borehole |
Somaliland MoWRD |
13/04/22 |
Sool |
las_caanood |
Laascaanood |
5.0 |
Somaliland MoWRD |
01/01/17 |
Nugal borehole 2 |
— |
8.5056211 |
47.4056216 |
626.0 |
— |
6 |
— |
urban |
yes |
— |
Yes |
— |
25000 |
— |
— |
— |
— |
— |
70.0 |
pvc |
8.0 |
40.0 |
70.0 |
12.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
300.0 |
Galvanised Steel |
6000.0 |
3000 |
0 |
0 |
yes |
70 |
9.0 |
Submersible Pump |
Grounnfunds |
7.5 |
30.0 |
Generator |
Unknown |
— |
— |
— |
good |
Very complicated supply system |
no |
— |
30.0 |
7.2 |
3800.0 |
1500.0 |
— |
Private/Individual |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
| 8021 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
laasqoray |
Buraan |
0.4 |
Al manhal charity |
26/05/10 |
Buraan borehole 2 |
— |
10.2110303 |
48.7746238 |
943.0 |
— |
5 |
— |
rural urban |
yes |
— |
Yes |
— |
4500 |
— |
— |
— |
— |
— |
60.0 |
pvc |
8.0 |
9.0 |
4.0 |
8.0 |
— |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Galvanised Steel |
— |
300 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
fair |
Buraan borehole 1 and 2 are connected same distribution pipes lines, same generator and solar, same elevated water tank.
Yield is very low. |
no |
— |
31.9 |
7.4 |
1581.0 |
775.0 |
— |
Communal |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Buraan borehole 1, and 2 are connected same distribution pipes, solar, generator, storage water tanks hence this borehole and borehole 1 are same intervention |
— |
— |
— |
| 7390 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
ceerigaabo |
Buraan |
1.0 |
Community_ |
14/05/00 |
Xabeeb dugwell |
— |
10.2141718 |
48.7727489 |
942.0 |
— |
5 |
— |
urban rural |
yes |
— |
Yes |
— |
1800 |
200 |
— |
700 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
9.0 |
5.0 |
9.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
yes |
13 |
9.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
fair |
No main raising pipes and submersible pump.
No distribution pipe lines. |
no |
— |
31.9 |
7.4 |
1581.0 |
775.0 |
— |
Private/Individual |
— |
— |
— |
— |
yes |
0.45 |
— |
— |
— |
— |
Owner of the dugwell |
31/03/21 |
1: Generator
2: Digged the deep of well |
1: Digging the deep of the well
2: Installation of submersible pump and main raising pipes.
3: Construction of elevated water tank
4: Distribution pipe lines.
5: Generator and solar
6: Construction of caretaker room. |
— |
— |