| 8000 |
— |
Spring |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
ceerigaabo |
Buraan |
0.2 |
Natutal spring. |
— |
buraan spring |
— |
10.2156437 |
48.7741451 |
915.0 |
— |
5 |
— |
urban rural |
yes |
— |
Yes |
— |
6000 |
1000 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
1 |
— |
yes |
3 |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
fair |
No water kiosks
No distribution pipes |
no |
— |
32.4 |
7.2 |
1786.0 |
905.0 |
— |
— |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
Community_e |
17/04/16 |
Cleaning of the spring site |
1: Rehabilitation of animal water troughs.
|
— |
— |
| 7108 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
laasqoray |
Dhahar |
0.2 |
Community_ |
01/01/20 |
Warsame Aadan borehole |
— |
9.7466125 |
48.8233403 |
898.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1500 |
2000 |
— |
5000 |
— |
— |
260.0 |
pvc |
8.0 |
— |
12.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
50.0 |
Galvanised Steel |
50.0 |
— |
1 |
2 |
yes |
18 |
8.0 |
Submersible Pump |
Grundfos |
— |
240.0 |
Generator |
Perkins |
60.0 |
— |
— |
poor |
Since the establishment of the borehole it''s not rehabilitated,
Main raising pipes are rusted
Pipelines are leaking |
no |
— |
32.0 |
7.0 |
2450.0 |
1250.0 |
— |
Communal |
— |
— |
— |
— |
yes |
0.025 |
yes |
— |
— |
— |
— |
— |
— |
1:Solar power system
2:Larger capacity of water tank .
3:Battery storage in order to be free from increasing fuel prices.
4: immediate replacement of main raising pipes and the submersible pump.
5: Generator |
— |
— |
| 7107 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
laasqoray |
Dhahar |
0.2 |
UNICEF |
01/01/05 |
Dhahar public borehole |
— |
9.7471447 |
48.8243602 |
892.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
5000 |
10000 |
— |
30000 |
— |
— |
220.0 |
pvc |
8.0 |
— |
12.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
60.0 |
Galvanised Steel |
100.0 |
— |
1 |
4 |
yes |
40 |
8.0 |
Submersible Pump |
Grundfos |
— |
190.0 |
Hybrid - Solar/Generator |
Perkins |
60.0 |
JCNS-M36V300W |
22.5 |
poor |
Main raising pipes are rusted and the submersible pump is weakly pumping |
no |
— |
32.6 |
6.6 |
2500.0 |
1250.0 |
— |
Communal |
— |
— |
— |
— |
yes |
0.025 |
yes |
— |
— |
— |
UNICEF |
01/01/19 |
Provided Solar system
Changed the main raising pipes |
1:Larger capacity of water storage
2:22KW inverter
3: Replacement of main raising pipes
4: and submersible pump
5: Pipeline Rehabilitation. |
— |
— |
| 7094 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
laasqoray |
Dhahar |
0.8 |
Community_ |
01/01/12 |
Qaawane Borehole |
— |
9.7419147 |
48.8105915 |
890.0 |
— |
1 |
— |
rural urban |
yes |
— |
No |
Since March 2022
Submersible pump stopped working
And the main raising pipes are rusted and leaking. |
120 |
5000 |
— |
15000 |
— |
— |
220.0 |
gi |
8.0 |
— |
12.0 |
13.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
12.0 |
Galvanised Steel |
190.0 |
— |
1 |
3 |
no |
— |
— |
Submersible Pump |
Luwara |
— |
180.0 |
Hybrid - Solar/Generator |
Iveco |
30.0 |
JCNS-M36V350W |
21.0 |
poor |
1:Submersible pump has stopped working.
2:Pipes and the pipelines are leaking and also the water tank is leaking |
no |
— |
— |
— |
— |
— |
— |
Communal |
— |
— |
— |
— |
no |
— |
yes |
— |
— |
— |
1:Psawen
2:NRC |
01/01/19 |
PSAWEN - provided the replacement of submersible pump only.
NRC- provided the solar system only. |
1:Immediate change of the submersible pump and the main raising pipes in order the borehole to function.
2: Pipeline and the water tank Rehabilitation.
3: kiosks
4: battery storage if it''s possible.
5: another Larger capacity water tank.
6: secondary Generator if it''s possible.
|
— |
— |
| 7347 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/04/22 |
Sanaag |
ceerigaabo |
Buraan |
0.5 |
Kanoko |
01/01/88 |
Buraan borehole 1 |
— |
10.2111741 |
48.7745235 |
942.0 |
— |
5 |
— |
rural urban |
yes |
— |
Yes |
— |
4500 |
300 |
— |
500 |
— |
— |
36.0 |
pvc |
8.0 |
7.0 |
4.0 |
8.0 |
— |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Galvanised Steel |
— |
300 |
1 |
4 |
yes |
8 |
8.0 |
Submersible Pump |
— |
— |
34.0 |
Hybrid - Solar/Generator |
Perkins |
33.0 |
DS60250W |
9.0 |
fair |
Buraan borehole1 and 2 are connected same water storage tanks, same solar and generator, same animal troughs, same distribution pipes
Both boreholes works same hours which is equal 8+8 = 16 hours. |
no |
— |
31.9 |
7.4 |
1581.0 |
775.0 |
— |
Communal |
yes |
25/05/89 |
4 |
2 |
yes |
0.03 |
yes |
— |
— |
— |
ACTED |
26/08/20 |
Construction of 1 room
Generator
Rehabilitation of 3 solar panels.
Construction of storage water tank.
Replacement of main raising pipes and submersible pump. |
1: Amergency replacement of main raising pipes and submersible pump
2: Generator.
3: Replacement of rusted distribution pipes
4: Construction of 1 elevated water tank.
5: Solar power storage (battery). |
— |
— |
| 4379 |
DWSLLA015 |
Dug Well |
SWALIM_WSIS |
13/04/08 |
Sool |
Laas Caanood |
Las anod |
— |
— |
— |
Dhuyaxuusho |
— |
8.5355 |
47.3593 |
640.0 |
— |
— |
— |
— |
Yes |
— |
Yes |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
7.0 |
3300.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Develop |
— |
Water Sources Inventory Survey – WSIS |
| 7873 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/03/22 |
Mudug |
galkayo |
Fardaharis |
— |
ICNA |
13/03/21 |
Fardaharis BH |
— |
7.0487097 |
47.4276759 |
303.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
500 |
250 |
— |
800 |
— |
— |
160.0 |
pvc |
8.0 |
— |
15.0 |
8.0 |
— |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
30.0 |
Galvanised Steel |
50.0 |
— |
1 |
2 |
no |
— |
— |
Submersible Pump |
— |
11.0 |
105.0 |
Hybrid - Solar/Generator |
Leateck |
30.0 |
AS-60-28W |
16.8 |
fair |
Shortage of koisks |
yes |
Colorless and odorless |
30.8 |
7.8 |
2831.0 |
1409.0 |
— |
Communal |
yes |
13/03/21 |
6 |
0 |
no |
— |
no |
— |
— |
— |
ICNA |
13/03/21 |
1. Installation of solar power. |
1. Construction of koisks
2. Extension of pipelines
4. Rehabilitation generator.
5. Fancing.
6. Construction of animal troughts. |
— |
— |
| 7943 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/03/22 |
Mudug |
galkayo |
Cagaaran |
— |
Save the children |
13/02/21 |
Cagaraan BH |
— |
7.0347377 |
47.4901695 |
284.0 |
— |
2 |
— |
urban rural |
yes |
— |
Yes |
— |
700 |
— |
— |
— |
— |
— |
180.0 |
pvc |
8.0 |
95.0 |
25.0 |
12.0 |
— |
1.4 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
50.0 |
PVC |
2500.0 |
— |
4 |
2 |
yes |
7 |
8.0 |
Submersible Pump |
— |
11.0 |
160.0 |
Hybrid - Solar/Generator |
Parkins |
45.0 |
PV800-4T30G |
30.0 |
good |
— |
yes |
Colorless and odorless |
35.2 |
8.05 |
2235.0 |
1115.0 |
— |
Communal |
yes |
13/03/21 |
3 |
— |
no |
— |
no |
— |
— |
— |
Save the children |
13/01/21 |
1 . Installation of solar power |
Fuel supporting.
Rehabilitation pipelines |
— |
— |
| 7227 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/03/22 |
Mudug |
galkayo |
Daarasalaam |
— |
Community |
13/03/02 |
Daarasalaam BH |
— |
7.0814702 |
47.4922321 |
315.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
3500 |
450 |
— |
1500 |
0 |
— |
170.0 |
pvc |
8.0 |
56.0 |
16.6 |
12.0 |
— |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
50.0 |
PVC |
1500.0 |
250 |
5 |
2 |
yes |
2 |
8.0 |
Submersible Pump |
Lowara |
11.0 |
108.0 |
Hybrid - Solar/Generator |
Parkins |
45.0 |
DS572380M |
16.72 |
good |
— |
yes |
Colorless and odorless |
32.6 |
7.71 |
2470.0 |
1225.0 |
— |
Communal |
yes |
13/03/02 |
3 |
0 |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
13/02/21 |
1. Construction of new elevated tank
2. Construction of koisks |
1. Extension pipelines
2. Extension of solar power |
— |
— |
| 7215 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/03/22 |
Mudug |
galkayo |
Horkac cagaaran |
1.3 |
Community |
13/03/17 |
Horkac BH |
— |
7.0533552 |
47.5178086 |
301.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
100 |
200 |
— |
800 |
5 |
— |
226.0 |
pvc |
8.0 |
— |
12.5 |
5.0 |
— |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
18.0 |
Galvanised Steel |
500.0 |
— |
1 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
15.0 |
135.0 |
Generator |
Parkins |
30.0 |
— |
— |
fair |
— |
yes |
Colorless and odorless |
31.5 |
7.91 |
2535.0 |
1257.0 |
— |
Communal |
yes |
14/03/17 |
3 |
0 |
no |
— |
yes |
— |
— |
— |
World Bank |
13/02/21 |
1. Construction of animal troughts
2. Construction of one koisk.
3. Rehabilitation of generator room
4. Installation of generator and pump. |
1. Installation of solar power.
2. Construction of new kiosks.
3. Construction caretaker room. |
— |
— |