Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8000 Spring Puntland Ministry of Energy Minerals and Water 13/04/22 Sanaag ceerigaabo Buraan 0.2 Natutal spring. buraan spring 10.2156437 48.7741451 915.0 5 urban rural yes Yes 6000 1000 1 yes 3 8.0 fair No water kiosks No distribution pipes no 32.4 7.2 1786.0 905.0 no no Community_e 17/04/16 Cleaning of the spring site 1: Rehabilitation of animal water troughs.
7108 Borehole Puntland Ministry of Energy Minerals and Water 13/04/22 Sanaag laasqoray Dhahar 0.2 Community_ 01/01/20 Warsame Aadan borehole 9.7466125 48.8233403 898.0 2 rural urban yes Yes 1500 2000 5000 260.0 pvc 8.0 12.0 24.0 Concrete/Masonry tank 50.0 Galvanised Steel 50.0 1 2 yes 18 8.0 Submersible Pump Grundfos 240.0 Generator Perkins 60.0 poor Since the establishment of the borehole it''s not rehabilitated, Main raising pipes are rusted Pipelines are leaking no 32.0 7.0 2450.0 1250.0 Communal yes 0.025 yes 1:Solar power system 2:Larger capacity of water tank . 3:Battery storage in order to be free from increasing fuel prices. 4: immediate replacement of main raising pipes and the submersible pump. 5: Generator
7107 Borehole Puntland Ministry of Energy Minerals and Water 13/04/22 Sanaag laasqoray Dhahar 0.2 UNICEF 01/01/05 Dhahar public borehole 9.7471447 48.8243602 892.0 2 rural urban yes Yes 5000 10000 30000 220.0 pvc 8.0 12.0 24.0 Concrete/Masonry tank 60.0 Galvanised Steel 100.0 1 4 yes 40 8.0 Submersible Pump Grundfos 190.0 Hybrid - Solar/Generator Perkins 60.0 JCNS-M36V300W 22.5 poor Main raising pipes are rusted and the submersible pump is weakly pumping no 32.6 6.6 2500.0 1250.0 Communal yes 0.025 yes UNICEF 01/01/19 Provided Solar system Changed the main raising pipes 1:Larger capacity of water storage 2:22KW inverter 3: Replacement of main raising pipes 4: and submersible pump 5: Pipeline Rehabilitation.
7094 Borehole Puntland Ministry of Energy Minerals and Water 13/04/22 Sanaag laasqoray Dhahar 0.8 Community_ 01/01/12 Qaawane Borehole 9.7419147 48.8105915 890.0 1 rural urban yes No Since March 2022 Submersible pump stopped working And the main raising pipes are rusted and leaking. 120 5000 15000 220.0 gi 8.0 12.0 13.0 Concrete/Masonry tank 12.0 Galvanised Steel 190.0 1 3 no Submersible Pump Luwara 180.0 Hybrid - Solar/Generator Iveco 30.0 JCNS-M36V350W 21.0 poor 1:Submersible pump has stopped working. 2:Pipes and the pipelines are leaking and also the water tank is leaking no Communal no yes 1:Psawen 2:NRC 01/01/19 PSAWEN - provided the replacement of submersible pump only. NRC- provided the solar system only. 1:Immediate change of the submersible pump and the main raising pipes in order the borehole to function. 2: Pipeline and the water tank Rehabilitation. 3: kiosks 4: battery storage if it''s possible. 5: another Larger capacity water tank. 6: secondary Generator if it''s possible.
7347 Borehole Puntland Ministry of Energy Minerals and Water 13/04/22 Sanaag ceerigaabo Buraan 0.5 Kanoko 01/01/88 Buraan borehole 1 10.2111741 48.7745235 942.0 5 rural urban yes Yes 4500 300 500 36.0 pvc 8.0 7.0 4.0 8.0 1.0 Galvanised Steel 300 1 4 yes 8 8.0 Submersible Pump 34.0 Hybrid - Solar/Generator Perkins 33.0 DS60250W 9.0 fair Buraan borehole1 and 2 are connected same water storage tanks, same solar and generator, same animal troughs, same distribution pipes Both boreholes works same hours which is equal 8+8 = 16 hours. no 31.9 7.4 1581.0 775.0 Communal yes 25/05/89 4 2 yes 0.03 yes ACTED 26/08/20 Construction of 1 room Generator Rehabilitation of 3 solar panels. Construction of storage water tank. Replacement of main raising pipes and submersible pump. 1: Amergency replacement of main raising pipes and submersible pump 2: Generator. 3: Replacement of rusted distribution pipes 4: Construction of 1 elevated water tank. 5: Solar power storage (battery).
4379 DWSLLA015 Dug Well SWALIM_WSIS 13/04/08 Sool Laas Caanood Las anod Dhuyaxuusho 8.5355 47.3593 640.0 Yes Yes 7.0 3300.0 Develop Water Sources Inventory Survey – WSIS
7873 Borehole Puntland Ministry of Energy Minerals and Water 13/03/22 Mudug galkayo Fardaharis ICNA 13/03/21 Fardaharis BH 7.0487097 47.4276759 303.0 1 rural urban yes Yes 500 250 800 160.0 pvc 8.0 15.0 8.0 1.0 Concrete/Masonry tank 30.0 Galvanised Steel 50.0 1 2 no Submersible Pump 11.0 105.0 Hybrid - Solar/Generator Leateck 30.0 AS-60-28W 16.8 fair Shortage of koisks yes Colorless and odorless 30.8 7.8 2831.0 1409.0 Communal yes 13/03/21 6 0 no no ICNA 13/03/21 1. Installation of solar power. 1. Construction of koisks 2. Extension of pipelines 4. Rehabilitation generator. 5. Fancing. 6. Construction of animal troughts.
7943 Borehole Puntland Ministry of Energy Minerals and Water 13/03/22 Mudug galkayo Cagaaran Save the children 13/02/21 Cagaraan BH 7.0347377 47.4901695 284.0 2 urban rural yes Yes 700 180.0 pvc 8.0 95.0 25.0 12.0 1.4 Concrete/Masonry tank 50.0 PVC 2500.0 4 2 yes 7 8.0 Submersible Pump 11.0 160.0 Hybrid - Solar/Generator Parkins 45.0 PV800-4T30G 30.0 good yes Colorless and odorless 35.2 8.05 2235.0 1115.0 Communal yes 13/03/21 3 no no Save the children 13/01/21 1 . Installation of solar power Fuel supporting. Rehabilitation pipelines
7227 Borehole Puntland Ministry of Energy Minerals and Water 13/03/22 Mudug galkayo Daarasalaam Community 13/03/02 Daarasalaam BH 7.0814702 47.4922321 315.0 1 rural urban yes Yes 3500 450 1500 0 170.0 pvc 8.0 56.0 16.6 12.0 2.0 Concrete/Masonry tank 50.0 PVC 1500.0 250 5 2 yes 2 8.0 Submersible Pump Lowara 11.0 108.0 Hybrid - Solar/Generator Parkins 45.0 DS572380M 16.72 good yes Colorless and odorless 32.6 7.71 2470.0 1225.0 Communal yes 13/03/02 3 0 yes 0.05 yes NRC 13/02/21 1. Construction of new elevated tank 2. Construction of koisks 1. Extension pipelines 2. Extension of solar power
7215 Borehole Puntland Ministry of Energy Minerals and Water 13/03/22 Mudug galkayo Horkac cagaaran 1.3 Community 13/03/17 Horkac BH 7.0533552 47.5178086 301.0 1 urban rural yes Yes 100 200 800 5 226.0 pvc 8.0 12.5 5.0 0.0 Concrete/Masonry tank 18.0 Galvanised Steel 500.0 1 2 no Submersible Pump Lowara 15.0 135.0 Generator Parkins 30.0 fair yes Colorless and odorless 31.5 7.91 2535.0 1257.0 Communal yes 14/03/17 3 0 no yes World Bank 13/02/21 1. Construction of animal troughts 2. Construction of one koisk. 3. Rehabilitation of generator room 4. Installation of generator and pump. 1. Installation of solar power. 2. Construction of new kiosks. 3. Construction caretaker room.