| 7691 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/03/22 |
Bari |
iskushuban |
Jeedal |
2.0 |
UNICEF |
19/02/22 |
Jeedal borehole |
— |
10.2112917 |
49.5234167 |
647.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
— |
— |
— |
— |
— |
— |
260.0 |
pvc |
8.0 |
— |
14.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
yes |
25 |
8.0 |
Submersible Pump |
Lowara |
— |
276.0 |
Generator |
Perkins |
45.0 |
— |
— |
fair |
No elevated water tank
No animal troughs.
No water points. |
no |
— |
33.0 |
8.2 |
1350.0 |
680.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.015 |
— |
— |
— |
— |
— |
— |
No intervention is performed, because the borehole is newer |
This borehole is under construction, elevated water tank, troughs and the care taker room is to be constructed soon.
Despite that they need the flowing intervention:-
1: Installation of solar power system,due to the increased fuel prices.
2: Water tank for the town supply.
3: Distribution pipes and kiosks for the settlement. |
— |
— |
| 7253 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/03/22 |
Mudug |
galkayo |
Cagaaran |
— |
WDA |
13/03/91 |
Cagaaran BH 1 |
— |
7.0618805 |
47.4853827 |
279.0 |
— |
3 |
— |
rural urban |
yes |
— |
Yes |
— |
17500 |
9000 |
100 |
15000 |
— |
— |
195.0 |
pvc |
8.0 |
105.0 |
18.0 |
12.0 |
— |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
160.0 |
Galvanised Steel |
2000.0 |
330 |
7 |
3 |
yes |
6 |
8.0 |
Submersible Pump |
— |
16.0 |
150.0 |
Hybrid - Solar/Generator |
IM30 |
30.0 |
GPS-300-360 |
16.2 |
fair |
Pipelines rehabilitation |
yes |
Colorless and odorless |
35.5 |
8.1 |
2543.0 |
1261.0 |
— |
Communal |
yes |
13/03/90 |
7 |
0 |
yes |
0.1 |
yes |
— |
— |
— |
DRC |
13/02/21 |
1. Installation of solar power |
1. Rehabilitation of pump and riser pipes.
2. Rehabilitation of pipelines.
3. Extension of pipelines.
4. Rehabilitation and reconstruction of elevated water tank.
5. Construction of new kiosks.
6. Fancing. |
— |
— |
| 8315 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
13/03/22 |
Mudug |
galkayo |
Afar iridood |
— |
UNICEF |
13/02/21 |
Afar iridood BH |
— |
6.9935791 |
47.3739121 |
312.0 |
— |
1 |
— |
rural urban |
yes |
— |
No |
1 month not functioning, needs observation of borehole |
1260 |
— |
— |
— |
— |
— |
180.0 |
pvc |
8.0 |
— |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
24.0 |
Galvanised Steel |
50.0 |
— |
2 |
2 |
no |
— |
— |
Submersible Pump |
Lowara |
11.0 |
135.0 |
Generator |
CEOLMO |
30.0 |
— |
— |
poor |
Shortage of water supply. And borehole problemed. |
no |
— |
— |
— |
— |
— |
— |
Communal |
yes |
13/02/21 |
4 |
2 |
no |
— |
no |
— |
— |
— |
— |
— |
— |
1. Emergency to solve this problem
2. Needs camera to observation borehole problem. |
— |
— |
| 3823 |
DWMDGK007 |
Dug Well |
SWALIM_GSA |
13/02/16 |
Mudug |
Galkacyo |
Ceelakhwan |
— |
Community |
2/13/2016 |
Ceelakhwan |
— |
6.6935 |
47.381 |
282.0 |
— |
— |
— |
— |
No |
— |
Yes |
— |
— |
— |
— |
700 |
— |
No |
— |
— |
— |
— |
— |
— |
— |
— |
22.0 |
19.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
30.0 |
7.5 |
2750.0 |
1350.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
New Borehole |
— |
Strategic Water Sources Survey in Galmudug State – WSS_GM |
| 4491 |
DWSLTA014 |
Dug Well |
SWALIM_HGS |
13/02/12 |
Sool |
Taleex |
— |
— |
— |
— |
Carooley 1 |
— |
8.8561 |
48.1469 |
510.0 |
— |
— |
— |
— |
— |
— |
Yes |
— |
— |
120 |
— |
450 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
3.0 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
7.6 |
7540.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Quarternery gypsum |
Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
| 4611 |
DWSLXU071 |
Dug Well |
SWALIM_HGS |
13/02/12 |
Sool |
Xudun |
— |
— |
— |
— |
Dare/TAW017 |
— |
8.86439 |
47.91217 |
518.0 |
— |
— |
— |
— |
— |
— |
Yes |
— |
— |
120 |
— |
300 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
2.7 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Bucket and Windlass |
— |
— |
— |
— |
— |
— |
— |
— |
24.0 |
7.6 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Quarternery gypsum |
Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
| 4532 |
DWSLTA052 |
Dug Well |
SWALIM_HGS |
13/02/12 |
Sool |
Taleex |
— |
— |
— |
— |
Arooley/TAW018 |
— |
8.85613 |
48.14692 |
510.0 |
— |
— |
— |
— |
— |
— |
Yes |
— |
— |
120 |
— |
450 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
3.0 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Hand Pump |
— |
— |
— |
— |
— |
— |
— |
— |
24.6 |
7.7 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Quarternery gypsum |
Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
| 4594 |
DWSLXU054 |
Dug Well |
SWALIM_HGS |
13/02/12 |
Sool |
Xudun |
— |
— |
— |
— |
Dare 3 |
— |
8.8644 |
47.9122 |
518.0 |
— |
— |
— |
— |
— |
— |
Yes |
— |
— |
120 |
— |
300 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
2.7 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
7.5 |
2810.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Quarternery gypsum |
Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
| 330 |
BHBRQN001 |
Borehole |
Puntland_PSAWEN |
13/01/14 |
Bari |
Qandala |
Ceelgaal |
— |
— |
01/06/86 |
Ceelgaal |
— |
11.381 |
50.3989 |
301.0 |
— |
— |
— |
Rural |
Yes |
— |
Yes |
— |
120 |
70 |
— |
2000 |
— |
— |
22.0 |
— |
— |
8.0 |
16.0 |
4.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
52.0 |
— |
1350.0 |
— |
— |
— |
— |
— |
— |
— |
Lowara 7.5kW |
— |
20.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
10.0 |
370.0 |
247.0 |
— |
Public |
— |
— |
— |
— |
— |
0.01 |
— |
— |
— |
— |
Community and PSAWEN |
Pipes replacing |
01/07/08 |
Pipes and pump and generator room |
— |
Strategic Boreholes Survey – BHS |
| 1433 |
BHNGBU015 |
Borehole |
Puntland_PSAWEN |
13/01/14 |
Nugaal |
Burtinle |
Awrculus |
— |
ICRC - International Committee of The Red Cross |
01/06/12 |
Awrculus |
— |
8.0536 |
48.6095 |
697.0 |
— |
— |
— |
Rural |
Yes |
— |
Yes |
— |
600 |
2000 |
— |
4000 |
— |
— |
253.0 |
— |
— |
155.0 |
12.0 |
9.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
50.0 |
— |
1200.0 |
— |
— |
— |
— |
— |
— |
— |
Lowara 11kW |
— |
220.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Public |
— |
— |
— |
— |
— |
0.05 |
— |
0.2 |
— |
— |
— |
— |
— |
Pump 11Kw and Stanby Generator and rehabilitation of the pipeline |
— |
Strategic Boreholes Survey – BHS |