Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
6214 SPBRBO055 Spring SWALIM_WSIS 12/06/08 Bari Bossaso Kobdhaxaad Ufayn Hoose 10.7304 49.8047 626.0 Yes Yes 7.6 621.0 Improve Water Sources Inventory Survey – WSIS
8599 Borehole Somaliland MoWRD 12/04/22 Sool las_caanood Gumays 0.8 SC-UK 12/02/22 Gumays borehole 2 8.8652018 46.7942551 650.0 2 yes No This borehole is Under construction 200.0 Concrete/Masonry tank 40.0 2 The borehole is just drilled and no system supply connected no Communal no no no The borehole is underway and it requires to complete the project
7207 Borehole Puntland Ministry of Energy Minerals and Water 12/04/22 Sanaag ceerigaabo Beraagaha qol 0.5 Former Somali Government 30/09/86 Baragahaqol borehole 9.5593133 48.4902861 895.0 1 rural urban yes Yes 9000 1000 4000 150.0 gi 8.0 50.0 22.0 20.0 Concrete/Masonry tank 16.0 Galvanised Steel 1 2 5 yes 20 10.0 Submersible Pump Grundfos 90.0 Generator Perkins 40KVA Perkins 50.0 good The village has no water supply system and water kiosks. no 32.7 7.2 3710.0 1858.0 Communal no yes 0.01 yes World Vision 22/09/21 Extension of distribution pipe line in to the school Construction of one water kiosks. 1: Solar power system. 2: Construction of another elevated water tank. 3: Construction of generator room 4: Amergency replacement of main raising pipes and submersible pump. 5: Construction of new borehole
7101 Borehole Puntland Ministry of Energy Minerals and Water 12/04/22 Sanaag ceerigaabo Mindhicir 3.0 SHF 01/01/19 Mindhicir Borehole 10.1218743 48.4115493 1058.0 1 rural urban yes No 28 March 2022 Submersible pump has stopped functioning 3600 2000 4000 352.0 pvc 8.0 160.0 5.0 24.0 Concrete/Masonry tank 20.0 Galvanised Steel 1400.0 2 3 no Submersible Pump 300.0 Generator Perkins 45.0 poor Submersible pump need replacement Elevated water tank can''t supply the settlement The solar is not functioning and needs a repair. no Communal no yes 0.05 yes Somaliland MoWRD 01/07/21 Replacement of submersible pump 1.Argent Replacement of submersible pump 2.Solar-power system improvement 3.Another elevated water tank that provides the settlement, more troughs& Kiosks. 4.construction of a care taker room and a storage room 6.development of small farm that provides for the caretaker in order to benefit it from. N.B At this hard time people can''t afford to buy the water so both the animals and the people drink for free.
7720 Borehole Somaliland MoWRD 12/04/22 Sool las_caanood Yogoori 8.0 British Protectorate 09/03/45 Sixawle borehole 1 8.6891178 47.0225966 657.0 1 urban rural yes Yes 800 300 0 4000 1 75.0 pvc 40.0 15.0 8.0 0.0 0.0 Concrete/Masonry tank 30.0 Galvanised Steel 250.0 0 1 5 yes 20 9.0 Submersible Pump Luwara 11.0 60.0 Hybrid - Solar/Generator Perkins 50.0 Photovoltiac 300.0 poor The solar system is not working now no 37.0 7.3 1240.0 870.0 Private/Individual yes 0.01 no Private 13/04/21 Generator maintenance Support solar panels maintenance or replacement
7206 Borehole Puntland Ministry of Energy Minerals and Water 12/04/22 Sanaag ceerigaabo Xingalool 0.5 Former Somali Government 16/10/86 Xingalool borehole 1 9.753105 48.3131151 880.0 3 rural urban yes No 20/ feb/2021 The reason is pump has burned. 6000 500 1500 120.0 gi 8.0 65.0 12.0 20.0 Concrete/Masonry tank 24.0 2 yes 6 8.0 no Communal yes 26/08/19 1 4 yes 0.015 yes CARE Somalia 26/10/19 Amergency replacement of main raising pipes and submersible pump. Construction of storage room. Construction of elevated water tank. 1: Amergency replacement of main raising pipes and submersible pump. 2: Construction of another animal water troughs which is located out of city. 3: Construction of caretaker room. 4: Generator.
8022 Borehole Somaliland MoWRD 12/04/22 Sool las_caanood Shululux 0.0 NPA 12/07/12 Shululux borehole 8.6116786 46.6939212 769.0 1 rural urban yes Yes 4000 6000 20 20000 0 300.0 pvc 8.0 160.0 12.0 9.0 0.0 0.0 Concrete/Masonry tank 24.0 Galvanised Steel 450.0 0 4 4 yes 10 8.0 Submersible Pump 11 12.0 230.0 Hybrid - Solar/Generator Perkins 45.0 Photovoltiac 310.0 good There is no issue on the supply system no 30.0 7.2 1580.0 980.0 Communal no no no Oxfam GB 01/11/21 Solar installed by OXFORD 6 solar panels damaged. Fencing and lack of toilets. There is garbage near the the borehole so it is required to protect it.
8024 Dug Well Somaliland MoWRD 12/04/22 Sool las_caanood Gumays 3.0 Community 11/09/82 Wadhake 8.8351193 46.833536 647.0 1 rural yes Yes 700 1500 0 8000 1 16.0 10.0 6.0 9.0 Concrete/Masonry tank 6.0 Galvanised Steel 140.0 0 1 2 yes 10 9.0 Surface mounted Pump Luwara 6.0 Solar Photovoltiac 300.0 good The system is not working because there is electrical shock pump no 29.0 7.2 1560.0 1000.0 Communal yes 12/04/19 4 3 no no NRC 12/11/19 Construction of supply system Solar system is not functioning. Pump is not working due to burning or electrical shock
7789 Dug Well Puntland Ministry of Energy Minerals and Water 12/04/22 Sanaag ceerigaabo Gurmale 0.4 Community_ 01/01/17 Gurmale dugwells 10.0529722 48.1033727 1007.0 2 rural yes Yes 800 600 1200 10.0 5.0 0.25 16.0 1.0 8.0 1 no No Pump fair Yield is low. No distribution pipes. No main raising pipes and submersible pump. yes Mud water 32.1 7.1 6370.0 3220.0 Communal no no ACTED 01/12/19 Construction of head of two dugwell and One Trough. 1: Amergency construction of new borehole 2: Animal water troughs. 3: Elevated water tank. 4: Generator and solar with battery. 5: Distribution pipe lines. 6: Digging deep of dug well in order to get more yield 7: Amergency water trucking.
7855 Borehole Somaliland MoWRD 12/04/22 Sool las_caanood Gumays 0.2 NRC 12/01/18 Gumays borehole 1 8.8429653 46.7961158 651.0 2 rural urban yes Yes 8000 500 0 1350 0 150.0 pvc 8.0 60.0 4.0 12.0 0.0 0.0 Concrete/Masonry tank 24.0 Galvanised Steel 2000.0 300 3 2 no Submersible Pump Luwara 11.0 110.0 Solar SZYL-M330.36 330.0 good The supply system required maintenance because the pipelines are very weak no 29.0 7.3 3170.0 2200.0 Communal yes 12/04/19 3 2 no no ADRA 12/04/20 Water tank construction Require generator, pump and pipelines replacement. It also needs to check whole the system