Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7202 Borehole Puntland Ministry of Energy Minerals and Water 12/04/22 Sanaag ceerigaabo Xingalool 0.9 IR 09/06/03 Xingalool borehole 2 9.755695 48.3143046 885.0 3 rural urban yes Yes 3000 500 3000 120.0 pvc 8.0 66.0 3.0 17.0 0.5 Concrete/Masonry tank 24.0 Galvanised Steel 3 yes 10 8.0 fair The yield is low Distribution pipes are rusted. no 32.2 7.1 3720.0 1873.0 Communal yes 16/08/04 3 2 yes 0.025 yes CARE Somalia 13/06/20 Generator Construction of generator room 1: Amergency replacement of main raising pipes and submersible pump. 2: Generator 3: Rehabilitation of animal water troughs 4: Construction of another elevated water tank. 5: Fencing 6: training borehole workers 7: Construction of another borehole due to water demand 8: Solar power storage ( battery)
7222 Borehole Puntland Ministry of Energy Minerals and Water 12/04/22 Sanaag ceerigaabo Xingalool 0.8 Kuwait Government 05/08/14 Xingalool borehole3 9.762195 48.31026 1007.0 3 rural yes Yes 2820 600 2800 130.0 pvc 8.0 70.0 18.0 21.0 Concrete/Masonry tank 70.0 Galvanised Steel 1 4 yes 18 8.0 Submersible Pump 82.0 Hybrid - Solar/Generator Iveco 30.0 JCNS-M36V370 19.9 good no 32.1 6.9 4120.0 2060.0 Communal yes 12/04/15 3 2 yes 0.025 yes NRC 12/04/20 1: Solar 2: Construction of 2 toilet and one kiosks 1: Amergency replacement of main raising pipes and submersible pump 2: Replacement of rusted distribution pipes. 3: water purification. 4: Generator 5: water supply for the village 6: Fencing 7: Construction of caretaker room 8: training of borehole workers in order to enhance work performance. 9: Solar power storage ( battery)
7188 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Mudug goldogob Bursaalax Community 12/03/01 Ceelcadde bursalaax BH 7.1857728 47.2462594 355.0 7 urban yes Yes 3520 196.0 pvc 8.0 20.0 15.0 2.0 Concrete/Masonry tank 20.0 Galvanised Steel 5000.0 520 5 3 yes 2 8.0 Submersible Pump Lowara 11.0 168.0 Hybrid - Solar/Generator Parkins 35.0 SZYL_M350_36 25.0 good yes Colorless and odorless 29.5 8.21 2145.0 1003.0 Private/Individual yes 0.05 yes ICRC 12/03/19 Installation of solar power 1. Construction of new elevated tank 2. Extension of pipelines to IDP.
7068 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Bari bossaso Carta 0.5 Kuwait Government 14/08/13 Carta borehole 10.4914185 49.0775361 656.0 1 rural urban yes Yes 1200 190.0 pvc 8.0 10.0 5.0 Concrete/Masonry tank 18.0 Galvanised Steel 150.0 45 3 2 no Submersible Pump Lowara 111.0 Hybrid - Solar/Generator DEUTZ Perkins 30.0 CSP300 24.0 fair No good yield The water is dissolved some salt no 26.7 7.45 2740.0 1365.0 Communal yes 13/09/19 3 2 yes 0.02 yes CARE Somalia 09/02/19 Construction of the roof of the caretaker room and generator room. Replacement of rusted distribution pipe lines Rehabilitation of elevated water tank. Replacement of main raising pipes and submersible pump. Construction elevated water tank. Construction of animal troughs which located out of the village. Complete water supply system.around the village.
7932 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Mudug goldogob Ramaas PWASEN 12/03/18 Ramaas BH 7.2135578 47.3402197 353.0 1 rural urban yes Yes 910 2000 9000 0 220.0 pvc 8.0 12.0 5.0 3.0 Concrete/Masonry tank 30.0 Stainless Steel 1200.0 35 4 2 no Submersible Pump Lowara 15.0 180.0 Generator Parkins 45.0 fair yes Colorless and odorless 29.8 7.51 2335.0 1157.0 Communal yes 12/03/18 2 2 no no 1. Rehabilitation of pump and riser pipes 2. Installation of solar power 3. Rehabilitation of koisks 4. Construction of new elevated tank.
7687 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Bari bossaso Ceel daahir 1.3 Former Somali Government 08/07/88 Ceel dahir borehole 1 10.6401232 49.0499791 603.0 2 rural urban yes Yes 1800 200 500 2 165.0 gi 8.0 16.0 46.0 14.0 Concrete/Masonry tank 154.0 PVC 1400.0 180 2 yes 10 10.0 Submersible Pump Lowara 90.0 Hybrid - Solar/Generator Perkins 33.0 16.45 good no 26.5 7.7 2120.0 1070.0 Communal no yes 0.016 KAALO Relief and Development 10/03/21 Extenstion of solar panels 1: Extention of distribution pipe line in order to supply water to the village 2: Submersible pump 3: Construction of caretaker room
7609 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Bari bossaso Carmo 2.0 Horseed water company 22/05/13 Carmo borehole1 10.5489725 49.0702793 665.0 4 urban yes Yes 3600 248.0 pvc 8.0 12.0 15.0 Galvanised Steel 600 no Submersible Pump Lowara Generator Perkins 45.0 fair All boreholes distribute water to 1 storage water tank. no 31.0 7.6 2400.0 1200.0 Private-Public-Partnership yes 0.026 Horseed water company 20/05/21 Replacement of main raising pipes Solar Generator Pipes
7608 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Bari bossaso Carmo 1.0 Horseed water company 20/05/13 Carmo borehole2 10.553322 49.0704519 670.0 4 urban rural yes Yes 2400 150 250.0 pvc 8.0 190.0 4.0 15.0 Concrete/Masonry tank PVC 600 yes 5 9.0 Submersible Pump Lowara 195.0 Hybrid - Solar/Generator Perkins 45.0 SZYL-M330-36 16.5 good no 32.0 7.3 2500.0 1240.0 Private-Public-Partnership yes 0.026 no Horseed water company 11/06/21 Replacement of main pipes Replacement of main raising pipes and submersible pump. Construction of animal water troughs.
7097 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Bari qardho Juurile Community_ 01/09/16 Dhuur borehole 1 10.4176885 49.0949138 656.0 3 rural urban yes Yes 12000 800 4500 180.0 pvc 8.0 80.0 36.0 24.0 Concrete/Masonry tank 171.0 PVC 200.0 1 2 yes 70 9.0 Submersible Pump Lowara 150.0 Hybrid - Solar/Generator 2 generator, both are Perkins 100kva&50kva 150.0 JP-300M-72 YL365D-36b 25.6 good The borehole has a good yield which is equal 36 meter cubic per hour. The consumption of the borehole is water trucking. no 26.8 7.7 1400.0 700.0 Private/Individual yes 0.02 yes Community_e 18/07/21 Replacement of main raising pipes and submersible pump. Replacement of main raising pipes and submersible pump Construction of caretaker room.
7985 Borehole Puntland Ministry of Energy Minerals and Water 12/03/22 Mudug goldogob Tuulo-xanan 1.5 Charity 12/03/20 Tuulo xanan BH 7.4177271 47.2246497 395.0 1 rural urban yes Yes 1400 220.0 pvc 8.0 92.0 7.5 10.0 4.0 Concrete/Masonry tank 30.0 PVC 1700.0 1 3 2 no Submersible Pump 11.0 195.0 Generator Parkins 45.0 good yes Colorless and odorless 32.2 8.0 1870.0 928.0 Communal yes 12/03/21 5 0 no no NRC 12/03/21 1. Construction of new elevated tank. 1. Fuel supporting. 3. Installation of solar power. 4. Fancing.