| 8308 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Mudug |
galkayo |
Hadoodil |
— |
— |
21/03/04 |
Hadoodil BH |
— |
7.2353236 |
47.4007961 |
335.0 |
— |
1 |
— |
rural urban |
yes |
— |
No |
1 month, pump problem |
2100 |
2000 |
— |
8000 |
0 |
— |
210.0 |
pvc |
8.0 |
— |
32.0 |
9.0 |
— |
0.4 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
76.0 |
PVC |
5000.0 |
150 |
2 |
3 |
no |
— |
— |
Submersible Pump |
— |
7.5 |
180.0 |
Generator |
Parkins |
45.0 |
— |
— |
poor |
Absolutely poor |
no |
— |
— |
— |
— |
— |
— |
Communal |
yes |
21/03/07 |
3 |
2 |
— |
— |
— |
— |
— |
— |
NRC |
12/03/21 |
1. Construction of new elevated tank. |
1. Installation of pump.
2. Installation of solar power.
3. Rehabilitation of animal troughts.
4. Construction of new kiosks.
5. Trucking pipe |
— |
— |
| 7250 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Mudug |
galkayo |
Roox |
— |
Community |
12/03/16 |
Roox BH |
— |
7.2052439 |
47.4384682 |
341.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
4200 |
1500 |
— |
2500 |
— |
— |
180.0 |
pvc |
8.0 |
— |
13.3 |
15.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Galvanised Steel |
1300.0 |
30 |
6 |
2 |
yes |
2 |
8.0 |
Submersible Pump |
Lowara |
11.0 |
150.0 |
Hybrid - Solar/Generator |
Doss |
30.0 |
— |
19.6 |
fair |
— |
yes |
Colorless and odorless |
34.5 |
7.61 |
2350.0 |
1171.0 |
— |
Communal |
yes |
12/03/16 |
5 |
2 |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/03/20 |
1. Installation of solar power.
2. Rehabilitation of pump. |
1. Construction of new elevated tank and rehabilitation of generator.
2. Extension pump capacity.
3. Extension pipelines
4. Room caretaker room. |
— |
— |
| 7218 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Bari |
qardho |
Juurile |
1.5 |
Former Somali Government |
16/11/86 |
Juurile borehole |
— |
10.3962938 |
49.0667047 |
682.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1200 |
1500 |
— |
5000 |
0.5 |
— |
126.0 |
gi |
6.0 |
117.0 |
10.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
120.0 |
Galvanised Steel |
1700.0 |
— |
8 |
2 |
yes |
5 |
8.0 |
Submersible Pump |
Grundfos |
— |
126.0 |
Hybrid - Solar/Generator |
IVECO |
32.0 |
SZYL-P325-36 |
24.7 |
poor |
The borehole has 3 water storage.
two elevated water tank in the village and other one is located at the borehole site.
The capacity of three tanks is 120 meter cubic.
The pipe line connection b/n the village and borehole is been destroyed by floods.
And the village has no water supply.
Fetching water from the borehole is difficult due to the crossing of buran stream, which is very large and sand. |
no |
— |
26.6 |
8.06 |
1740.0 |
865.0 |
— |
Communal |
yes |
17/09/16 |
7 |
8 |
no |
— |
yes |
— |
— |
— |
NRC |
13/11/18 |
Installation of solar power system.
Replacement of main raising pipes and submersible pump.
Construction of two toilets.
Widening of animal troughs. |
1: Placement of pipe lines which distribute water to the village.
2: Replacement of main raising pipe lines and pump.
3: Construction of another borehole.
4: Construction of one elevated water tank. |
— |
— |
| 7205 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Bari |
bossaso |
Ceeldahir |
1.5 |
Kuwait Government |
— |
Ceeldahir borehole 2 |
— |
10.6125246 |
49.0492388 |
623.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
900 |
150 |
— |
1500 |
— |
— |
150.0 |
pvc |
8.0 |
— |
12.0 |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
PVC |
500.0 |
— |
8 |
— |
yes |
3 |
9.0 |
Submersible Pump |
Lowara |
— |
132.0 |
Generator |
Eveco |
30.0 |
— |
— |
fair |
The distribution pipe lines are disconnected.
The yield of borehole is very low. |
no |
— |
26.3 |
7.65 |
3520.0 |
1770.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.02 |
yes |
— |
— |
— |
Community_e |
25/11/21 |
Replacement of main raising pipes and submersible pump. |
Solar power installation.
Replacement of main raising pipes and submersible pump.
Replacement of distribution pipe line. |
— |
— |
| 7204 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Bari |
qardho |
Carmo |
3.0 |
Horseed water company |
12/07/19 |
Carmo borehole 3 |
— |
10.5711623 |
49.0842369 |
644.0 |
— |
5 |
— |
rural urban |
yes |
— |
Yes |
— |
1800 |
100 |
— |
700 |
— |
— |
240.0 |
pvc |
8.0 |
180.0 |
10.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
426.0 |
PVC |
— |
300 |
— |
— |
no |
— |
— |
Submersible Pump |
Lowara |
— |
234.0 |
Generator |
Perkins |
45.0 |
— |
— |
good |
But the water is over salt.
The borehole distribute water to the village so it is difficult to determine length of pipe line. |
yes |
Yellow color.
Water is over salt. |
26.7 |
7.28 |
4050.0 |
2020.0 |
— |
Private-Public-Partnership |
— |
— |
— |
— |
yes |
0.02 |
yes |
— |
— |
— |
Horseed water company |
16/07/20 |
Cleaning of the borehole site. |
Installation of solar power system.
Fencing. |
— |
— |
| 7183 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Mudug |
goldogob |
Laandheere |
0.3 |
Community |
12/03/13 |
Laandheere BH |
— |
7.1810792 |
47.3584385 |
350.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
910 |
300 |
— |
2500 |
0 |
— |
180.0 |
pvc |
8.0 |
— |
10.0 |
10.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
13.0 |
Stainless Steel |
500.0 |
7 |
4 |
2 |
yes |
3 |
8.0 |
Submersible Pump |
— |
15.0 |
145.0 |
Hybrid - Solar/Generator |
IVECO |
30.0 |
GD100_01G_4_PV |
18.5 |
fair |
— |
yes |
Colorless and odorless |
29.3 |
7.72 |
2835.0 |
1405.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/02/21 |
1. Rehabilitation of pipes, koisks and animal throughts
2. Installation of solar power. |
1.Construction of new elevated tank
2. Fancing of borehole. |
— |
— |
| 7184 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Mudug |
goldogob |
Kalabayr |
0.2 |
Community |
19/03/11 |
Kalabayr BH |
— |
7.1906848 |
47.2928613 |
355.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
980 |
1650 |
— |
2500 |
0 |
— |
230.0 |
pvc |
8.0 |
— |
11.5 |
12.0 |
— |
4.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
56.0 |
Galvanised Steel |
1500.0 |
20 |
1 |
2 |
yes |
7 |
8.0 |
Submersible Pump |
Lowara |
15.0 |
216.0 |
Hybrid - Solar/Generator |
Parkins |
45.0 |
GCNS_M36V390W |
15.99 |
good |
— |
yes |
Colorless and odorless |
29.3 |
7.62 |
2550.0 |
1245.0 |
— |
Communal |
yes |
19/03/12 |
5 |
0 |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/01/21 |
1. Installation of solar power
2. Rehabilitation of koisks
3. Rehabilitation of pump and riser pipes |
1. Fancing.
2. Rehabilitation of koisks and construction new koisks.
3. Rehabilitation of animal troughts.
4. Rehabilitation rooms.
5. Fuel supporting. |
— |
— |
| 7190 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Mudug |
goldogob |
Kuwait |
— |
Kuwait charity |
12/03/14 |
Kuwait BH |
— |
7.3939088 |
47.2250603 |
395.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
4200 |
1000 |
— |
2000 |
— |
— |
155.0 |
pvc |
8.0 |
— |
16.7 |
18.0 |
— |
3.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
64.0 |
PVC |
2000.0 |
100 |
3 |
2 |
yes |
20 |
8.0 |
Submersible Pump |
Lowara |
11.0 |
142.0 |
Hybrid - Solar/Generator |
Parkins |
45.0 |
DS7230M |
17.34 |
fair |
— |
yes |
Colorless and odorless |
31.5 |
8.04 |
1838.0 |
912.5 |
— |
Communal |
yes |
12/03/14 |
5 |
0 |
yes |
0.05 |
yes |
— |
— |
— |
NRC |
12/03/21 |
1. Construction of operator room. |
1. Rehabilitation of pump and riser pipes and cables.
2. Fuel supporting.
3. Rehabilitation of animal troughts.
4. Rehabilitation and construction of koisks. |
— |
— |
| 7189 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
12/03/22 |
Mudug |
goldogob |
Laanmadow |
— |
Community |
— |
Laanmadow BH |
— |
7.3302253 |
47.2966161 |
354.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
950 |
1800 |
— |
2200 |
0 |
— |
— |
pvc |
8.0 |
— |
— |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
Stainless Steel |
— |
— |
2 |
2 |
yes |
10 |
8.0 |
Submersible Pump |
— |
11.0 |
— |
Hybrid - Solar/Generator |
Parkins |
45.0 |
— |
— |
poor |
The operator of borehole has no good detail information about tha borehole and supplies. |
yes |
Colorless and odorless |
29.9 |
7.61 |
1940.0 |
958.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.05 |
yes |
— |
— |
— |
— |
— |
— |
1. Fancing
2. Rehabilitation of kiosks
3. Rehabilitation of animal troughts |
— |
— |
| 4533 |
DWSLTA053 |
Dug Well |
SWALIM_HGS |
12/02/12 |
Sool |
Taleex |
— |
— |
— |
— |
Arooley/TAW019 |
— |
8.8472 |
48.138 |
505.0 |
— |
— |
— |
— |
— |
— |
Yes |
— |
— |
120 |
— |
300 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
2.5 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Bucket and Windlass |
— |
— |
— |
— |
— |
— |
— |
— |
24.0 |
7.4 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Quarternery gypsum |
Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |