Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7220 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Xida 0.2 12/05/13 Xida borehole 9.9550299 49.0565495 909.0 1 rural urban yes No The source stopped 24/04/2019 Unknown problem. 9000 2500 6000 370.0 pvc 8.0 10.0 13.0 Concrete/Masonry tank 25.0 Galvanised Steel 300.0 1 2 yes 5 10.0 Submersible Pump Lowara 348.0 Generator Perkin 44.0 fair There is no water supply system in the village and kiosks. no Communal yes 10/09/13 4 2 no yes DRC - Puntland 16/08/18 Replacement of main raising pipes and submersible pump. 1: Assessments of the borehole problem in order to start borehole functioning. 2: Installation of solar power system.
7211 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Waciye 3.0 Puntland MoEMW 14/08/06 Waciye borehole 10.0226469 49.0389998 883.0 1 rural urban yes Yes 3000 1000 10000 380.0 pvc 8.0 8.0 10.0 Concrete/Masonry tank 96.0 Galvanised Steel 300 1 2 no Submersible Pump Lowara 294.0 Hybrid - Solar/Generator Perkins 45.0 good The borehole distributes water on two elevated water tank. One elevated water distributes water to the kiosks and animal troughs. And onother elevated water tank distribute water to waciye city. The city contains around 300 House holds. no 27.7 7.31 4150.0 2070.0 Communal no no yes IOM 13/08/18 Installation of solar power system. Replacement of main raising pipes and submersible pump. Replacement of all rusted distribution iron pipes. Replacement of main raising pipes and submersible pump. Generator. Construction of one kiosks.
7180 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob Galdogob Water Company 08/03/04 Goldogob water company BH 2 7.0297561 47.005359 346.0 11 rural urban yes Yes 42000 0.0 215.0 pvc 8.0 144.0 9.0 20.0 3.0 Concrete/Masonry tank 400.0 PVC 13344.0 2224 1 2 yes 15 10.0 Submersible Pump Lowara 15.0 192.0 Hybrid - Solar/Generator Parkins 60.0 fair yes Colorless and odorless 30.5 7.51 2950.0 1455.0 Private-Public-Partnership yes 0.05 yes UNICEF 08/01/21 1. Construction of new elevated tank 1. Installation of solar power
7523 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Ceel boos Goldogob 08/03/17 Ceel booc BH goldogob 7.0321616 47.022893 346.0 11 urban yes Yes 750 215.0 pvc 8.0 6.7 5.0 4.0 Concrete/Masonry tank 94.0 Galvanised Steel 70.0 1 2 yes 3 8.0 Submersible Pump 11.0 192.0 Generator Parkins 30.0 poor Absolutely poor supply, this supply needs full rehabilitation yes Colorless and odorless 32.1 7.54 2530.0 1251.0 Private/Individual yes 0.05 yes 1. Emergency 2. Installation of solar power 3. Generator rehabilitation 4. Caretaker and Generator rooms rehabilitation 5. Koisks and animal thoughts rehabilitation 6. Fancing.
7530 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob 11/03/19 Goldogob water company BH 6 7.0428029 47.0339146 346.0 11 urban yes Yes 8000 240.0 pvc 8.0 140.0 18.0 15.0 2.0 Concrete/Masonry tank 200.0 PVC 2786.0 2500 no Submersible Pump Grandfoss 15.0 168.0 Generator Parkins 45.0 yes Colorless and odorless 30.7 7.67 1821.0 913.0 Private-Public-Partnership yes 0.05 no 1. Construction of new elevated tank.
7521 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob WDA 08/03/43 Ceel ciilde BH goldogob 7.031098 47.020472 346.0 11 urban rural yes Yes 2100 200.0 gi 8.0 3.7 13.0 8.0 Concrete/Masonry tank 64.0 Galvanised Steel 4000.0 300 2 2 yes 9 8.0 Submersible Pump Grand foss 11.0 124.0 Generator Parkins 45.0 poor Needs full rehabilitation yes Colorless and odorless 32.5 7.42 2556.0 1261.0 Utility/Local Authority yes 0.05 yes CARE Somalia 08/02/21 1. Construction of new elevated tank tank 1. New driling borehole 2. Installation of solar power. 4. Rehabilitation of koisks and animal thoughts 5. Construction of caretaker and Generator rooms
7139 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Bari qardho Carmo 1.0 IR 10/05/17 Carmo borehole 9.4533435 48.8719451 850.0 1 rural urban yes Yes 1200 300 10 5000 0.25 260.0 pvc 8.0 9.0 6.0 Concrete/Masonry tank 20.0 Galvanised Steel 750.0 1 3 yes 1 9.0 Submersible Pump Solar BR-M250W 21.5 fair The water is over salt. The village has no water kiosks and water supply system. no 30.3 6.9 5990.0 2990.0 Communal no no yes Community_e 17/02/19 Construction of one animal troughs Replacement of main raising pipes and submersible pump. Rehabilitation of some solar panels and its accessories. Generator. Replacement of rusted distribution pipe lines. Water purification.
7192 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob Galdogob Water Company 08/08/21 Goldogob BH 7 7.0300828 47.0049931 346.0 11 urban yes Yes 235.0 pvc 8.0 140.0 18.0 2.0 Concrete/Masonry tank 400.0 PVC no Submersible Pump Grandfoss 15.0 180.0 Generator yes Colorless and odorless 30.6 7.81 1635.0 805.0 Private-Public-Partnership yes 0.05 yes inspection
7534 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob Galdogob Water Company 13/03/17 Goldogob water company BH 5 7.0437981 47.0129558 352.0 11 urban yes Yes 42000 235.0 pvc 8.0 140.0 18.0 15.0 1.3 Concrete/Masonry tank 240.0 PVC 2786.0 7000 Submersible Pump Grandfoss 15.0 126.0 Hybrid - Solar/Generator IVECO 45.0 good yes Colorless and odorless 30.5 7.6 1650.0 818.0 Private-Public-Partnership yes 0.05 1. Fancing of borehole 2. Rehabilitation of generator.
7535 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob 08/02/15 Goldogob water company BH 4 7.0312549 47.0079111 362.0 11 urban yes Yes 225.0 pvc 8.0 145.0 18.0 15.0 2.0 Concrete/Masonry tank 100.0 PVC 6250.0 1200 no Submersible Pump Lowara 15.0 126.0 Generator Parkins 40.0 fair yes Colorless and odorless 30.3 7.58 1580.0 791.0 Private-Public-Partnership yes 0.05 yes 1. Installation of solar power 2. Fancing 3. Installation of new generator