Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7976 — Borehole Puntland Ministry of Energy Minerals and Water March 10, 2022 Mudug goldogob Bursaalax 0.7 Community 10/10/21 Rouble BH bursaalax — 7.164917 47.2376117 355.0 — 7 — urban yes — Yes — 1400 — — — — — 220.0 pvc 8.0 — 20.0 5.0 — 3.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 28.0 Galvanised Steel 80.0 — — 2 yes 4 8.0 Submersible Pump — 15.0 185.0 Generator Parkins 45.0 — — poor There is no any water supply yes Colorless and odorless 32.3 7.8 1946.0 1303.0 — Communal yes 10/10/21 4 0 no — no — — — — — — 1. Installation of solar power 2. Construction of new elevated tank 3. Water supply pipes 5. Construction of koisks and animal troughts — —
7160 — Borehole Puntland Ministry of Energy Minerals and Water March 10, 2022 Mudug goldogob Bursalax — Community 10/03/10 Bursalax water company BH 3 — 7.1834657 47.2280446 373.0 — 3 — urban rural yes — Yes — 14000 50 20 500 0.0 — 236.0 pvc 8.0 — 28.5 16.0 — 2.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 40.0 Galvanised Steel 600.0 — 1 2 no — — Submersible Pump Lowara 15.0 186.0 Generator Parkins 45.0 — — fair Something rehabilitation needed yes Colorless and odorless 31.0 8.1 1811.0 1213.3 — Utility/Local Authority — — — — yes 0.05 yes — — — CARE Somalia 10/02/21 1. Fancing 3. Construction of koisk. 1. Installation of solar power 2. Rehabilitation of generator. — —
7980 — Borehole Puntland Ministry of Energy Minerals and Water March 10, 2022 Mudug goldogob Bursaalax 0.5 Community 10/02/21 Mahiigaan BH — 7.1654211 47.2408643 355.0 — 5 — urban yes — Yes — — — — — — — 220.0 pvc 8.0 — 24.0 — — 0.3 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 80.0 PVC 120.0 — — — no — — No Pump — — — — — — — — poor There is no supply for this borehole yes Colorless and odorless 33.1 7.6 1902.0 1274.3 — Communal yes 10/02/21 3 2 yes — no — — — Community 10/03/22 1. Construction of elevated water tank Construction of new elevated tank. Installation of solar power. Construction of koisks and animal troughts. 5. Installation of generator. — —
7191 — Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Taaloole — Kuwait charity 09/03/19 Taaloole BH — 7.0519069 47.0863116 346.0 — 1 — rural urban yes — Yes — 600 500 — 1500 10.0 — 245.0 pvc 8.0 — 35.0 6.0 — 1.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 18.0 PVC 1000.0 13 1 2 yes 5 8.0 Submersible Pump Lowara 15.0 185.0 Solar — — AS-P60-270W 17.28 good — yes Colorless and odorless 28.6 8.28 1708.0 843.0 — Communal yes 09/03/19 3 2 yes 0.05 yes — — — — — — 1. Installation of generator. 2. Rehabilitation of pump and riser pipes 3. Construction of new elevated tank 4. Construction of koisks. 5. Extension of pipelines. — —
7220 — Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Xida 0.2 — 12/05/13 Xida borehole — 9.9550299 49.0565495 909.0 — 1 — rural urban yes — No The source stopped 24/04/2019 Unknown problem. 9000 2500 — 6000 — — 370.0 pvc 8.0 — 10.0 13.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 25.0 Galvanised Steel 300.0 — 1 2 yes 5 10.0 Submersible Pump Lowara — 348.0 Generator Perkin 44.0 — — fair There is no water supply system in the village and kiosks. no — — — — — — Communal yes 10/09/13 4 2 no — yes — — — DRC - Puntland 16/08/18 Replacement of main raising pipes and submersible pump. 1: Assessments of the borehole problem in order to start borehole functioning. 2: Installation of solar power system. — —
7144 — Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Qansaxle — Community 09/03/16 Qansaxle BH — 7.1188594 47.0943949 368.0 — 1 — rural urban yes — Yes — 3000 800 150 500 0.0 — 176.0 pvc 8.0 — 6.6 15.0 — 5.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 60.0 PVC 2000.0 70 4 3 yes 10 8.0 Submersible Pump Lowara 15.0 170.0 Hybrid - Solar/Generator Parkins 60.0 YL365-36b 23.36 fair Koisks of this supply needs strong rehabilitation yes Colorless and odorless 32.8 7.3 1863.0 1240.0 — Communal yes 09/03/16 4 0 yes 0.1 yes — — — Agency not specified 09/03/18 1. Construction of new elevated tank 1. Construction new animal throughts 2. Extension of pipelines 3. Rehabilitation of pump and riser pipes 4. Rehabilitation of generator. — —
7143 — Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Daarasalaam — Community 09/03/11 Daarasalaam BH — 7.2566882 47.1067542 367.0 — 1 — rural urban yes — Yes — 10500 2500 200 2000 12.0 — 168.0 pvc 8.0 — 16.0 15.0 — 2.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 62.0 PVC 3500.0 700 8 4 yes 10 8.0 Submersible Pump Grand fos 15.0 162.0 Hybrid - Solar/Generator Parkins 45.0 DS734OM 23.12 fair Needs rehabilitation yes Colorless and odorless 32.6 7.71 2470.0 1654.4 — Communal yes 09/03/11 4 2 yes 0.05 yes — — — IRC 09/03/17 Installation of solar power Full rehabilitation: 1. Rehabilitation of pipes 2. Rehabilitation of pump and riser pipes 3. Rehabilitation of and construction of animal throughts 4. Construction of elevated tank — —
7086 — Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Riig-oomane 0.5 WDA 09/05/77 Riig-oomane BH 1 — 7.2029785 47.1922316 367.0 — 2 — rural urban yes — Yes — 1000 500 300 1000 2.0 — 210.0 pvc 8.0 130.0 4.0 8.0 — 5.0 — — — — — — — — — — — — — — — — — Concrete/Masonry tank 160.0 Galvanised Steel 3000.0 200 5 4 yes 10 8.0 Submersible Pump — 11.0 151.0 Hybrid - Solar/Generator Perkins 45.0 Szyl-p325-36 32.5 good — yes Colorless and odorless 39.5 7.6 2100.0 1035.0 — Communal yes 10/05/02 3 0 yes 0.05 yes — — — — — — Rehabilitation of pipelines Rehabilitation of kiosks and animal thoughts Rehabilitation of pump New generator Borehole around fencing — —
7211 — Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Waciye 3.0 Puntland MoEMW 14/08/06 Waciye borehole — 10.0226469 49.0389998 883.0 — 1 — rural urban yes — Yes — 3000 1000 — 10000 — — 380.0 pvc 8.0 — 8.0 10.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 96.0 Galvanised Steel — 300 1 2 no — — Submersible Pump Lowara — 294.0 Hybrid - Solar/Generator Perkins 45.0 — — good The borehole distributes water on two elevated water tank. One elevated water distributes water to the kiosks and animal troughs. And onother elevated water tank distribute water to waciye city. The city contains around 300 House holds. no — 27.7 7.31 4150.0 2070.0 — Communal no — — — no — yes — — — IOM 13/08/18 Installation of solar power system. Replacement of main raising pipes and submersible pump. Replacement of all rusted distribution iron pipes. Replacement of main raising pipes and submersible pump. Generator. Construction of one kiosks. — —
7093 — Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Bari qardho Sheerbi 3.0 IR 12/07/19 Sheerbi borehole — 9.8439133 49.1074936 810.0 — 1 — rural urban yes — Yes — 18000 4500 — 15000 — — 400.0 pvc 8.0 — 5.0 13.0 — — — — — — — — — — — — — — — — — — — Concrete/Masonry tank 40.0 Galvanised Steel 450.0 — 1 2 no — — Submersible Pump Lowara — 380.0 Hybrid - Solar/Generator Perkins 60.0 SZYL-P300-36 25.5 poor The yield of borehole is very low. The village has no water supply system. There is no water trucking because the yield of borehole is very low. no — 27.9 7.48 4000.0 2000.0 — Communal yes 09/04/00 3 4 no — yes — — — Puntland MoEMW 18/05/21 Replacement of main raising pipes and submersible pump. Replacement some of the solar equipment accessories. Digging the deep of the borehole in order to increase borehole yield Construction of toilet Construction of caretaker room Construction of one animal water troughs. Complete water supply system. Construction of another borehole. — —